Loading...
HomeMy WebLinkAboutA1-1 PROJECT INFO AND SITE 12-7-20BA B C O C K  ST R E E T S E T B A C K   ‐   S T A N D A R D 2 0 '   ‐   0 " S E T B A C K5' ‐ 0 " A L L E Y 2 0 '   ‐   0 " NE W  CONCRETE  DRIVEWAY EX I S T I N G  MA I N  HO U S E 30 '  X  45 '   ALLEY S .   S I X T H   S T . SETBACK 15' ‐ 0" S E T B A C K 1 5 ' ‐ 0 " UP (E )  SE W E R  LI N E S I D E W A L K 5 ' ‐ 0 " 1 2 7 . 8 0 ' 75 . 0 0 ' 74 . 9 4 ' 127.70' 9' X 1 8 '  PA R K I N G  SP A C E 9' X 1 8 '  PA R K I N G  SP A C E 9' X 1 8 '  PA R K I N G  SP A C E 9' X 1 8 '  PA R K I N G  SP A C E 11'X20' PARKING  SPACE S E T B A C K   W / O   S T A C K E D   P A R K I N G 6 '   ‐   0 " 14' ‐ 3"30' ‐ 10 1/2"21' ‐ 10  1/2"NEW  CONC  DRIVEWAY9' ‐ 2  1/2" 7 ' x 2 4 '   P A R K I N G   S P A C E TR A S H   GR A S S  YA R D N E W   L A N D S C A P I N G NE W  LANDSCAPING NEW  LANDSCAPING NE W  FE N C E  W/   GA T E SCORNER SETBACK 40 '  ‐   0" 4 0 '   ‐   0 " 1 5 '   ‐   0 " 10 '  ‐   0" 15' ‐ 0" 1 0 '   ‐   0 " DA S H E D  VI S I O N  TR I A N G L E :  NO   FE N C E ,  WA L L  OR  PL A N T I N G  IN   EX C E S S  OF  30  IN C H E S  AB O V E  TH E   ST R E E T  CE N T E R L I N E  GR A D E  IS   PE R M I T T E D  WI T H I N  A  TR I A N G U L A R   AR E A ,  TY P 1 5 '   ‐   0 " 10 '  ‐   0" BA B C O C K  ST R E E T S E T B A C K 2 0 '   ‐   0 " S E T B A C K 5 ' ‐ 0 " A L L E Y 2 0 '   ‐   0 " EX I S T I N G  CO N C   DR I V E W A Y  TO  BE   RE M O V E D EX I S T I N G  MA I N  HO U S E 30 '  X  45 '   PR O P E R T Y  LI N E AL L E Y S .   S I X T H   S T . S E T B A C K 1 5 '   ‐   0 " S E T B A C K 1 5 ' ‐ 0 " EX I S T I N G  LA N D S C A P I N G   TO  RE M A I N ,  U. N . O . EX I S T I N G  TR E E S   TO  BE  RE M O V E D EX I S T I N G  GA R A G E ,   TO  BE  RE M O V E D (E )  UT I L I T Y  PO L E  & OV E R H E A D  LI N E .   LI N E  TO  BE  BU R I E D (E )  GA S  LI N E (E )  WA T E R  LI N E (E )  SE W E R  LI N E S I D E W A L K 5 ' ‐ 0 " 1 2 7 . 8 0 ' 75 . 0 0 ' 74 . 9 4 ' 1 2 7 . 7 0 ' AD J A C E N T  1 ‐ST O R Y   GA R A G E AD J A C E N T  2 ‐ST O R Y   BU I L D I N G EX I S T I N G  FE N C E    TO   BE  RE M O V E D EX I S T I N G  PA T I O   TO  BE  RE M O V E D FE N C E  TO  BE  RE M O V E D PROJECT  SUMMARY • DEMOLITION  OF  EXISTING  GARAGE  • CONSTRUCTION  OF  2 ‐STORY  BUILDING  WITH  GARAGE/STORAGE  ON  MAIN  LEVEL  AND  AN  ACCESSORY  DWELLING  UNIT  ABOVE.• MAIN  HOUSE  ‐REPLACE  ALL  WINDOWS, INSTALL  BASEMENT  WINDOW  WELL, PAINT  ALL  EXTERIOR  WOODWORK  & STUCCO, DORMER  ADDITION, MINOR  FLOOR  PLAN  ALTERATIONS  AND  RECONFIGURATION.PROPERTY  INFORMATION ADDRESS : 522  W. BABCOCK  STREET, BOZEMAN  MT  59715 LEGAL  ADDRESS : PARK  ADD, S12, T02  S, R05  E, BLOCK  1, Lot  10  ‐1 ZONING : R ‐4  LOCATED  WITHIN  THE  COOPER  PARK  CONSERVATION  OVERLAY  DISTRICT LOT  SIZE 9525  SF LOT  AREA  PER  UNIT :3000SF NUMBER  EXISTING  UNITS :2 LOT  AREA  REQ. FOR  ADU 1000SF EXISTING  HOUSE  FOOTPRINT : 1350  SF EXISTING  GARAGE  FOOTPRINT : 480  SF EXISTING  F.A.R.: 19.2%PROPOSED  GARAGE  FOOTPRINT :665  SF PROPOSED  ADU  LIVING  AREA : 595  SF PROPOSED  F.A.R .: 21.2%MAIN  BUILDING  HEIGHT : 27'‐2"ADU  BUILDING  HEIGHT : 22'‐9"PARKING  REQUIRED/PROVIDED : 6/6 PROJECT #: 406.599.3348 www.ianmcnairy.com REVISIONS:ISSUE DATE:IAN MCNAIRY ARCHITECTURE COPYRIGHT 2020 IAN MCNAIRY:THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF THE ARCHITECT, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED.NOT FOR CONSTRUCTION C : \ D r o p b o x \ I A N M C N A I R Y A R C H I T E C T U R E \ 1 . C u r r e n t P r o j e c t s \ L o h s s \ 0 4 . D R A W I N G S \ Z . R e v i t \ B a b c o c k A D U - 1 1 . r v t 1 2 / 1 0 / 2 0 2 0 1 : 1 7 : 1 6 P M A1-111.10.20 PROJECT INFO & SITE PLANBABCOCKHOUSE & ADU 522 W. BABCOCK ST.BOZEMAN MT 59715 NCOA APPLICATION 20-021 12/10/20 REV  1 1" = 1 0 ' - 0 " A1 - 11 SI T E P L A N - N E W 0'5 10 20 N 1" = 1 0 ' - 0 " A1 - 12 SI T E P L A N - A S - B U I L T / D E M O SHEET  INDEX NUM NAME REVISED A1 ‐1P R O J E C T  INFO  & SITE  PLAN 12/10/20 A1 ‐2E X I S T I N G  CONDITIONS  & STREET STUDY A2 ‐0H O U S E  ‐ BASEMENT  FLOOR  PLAN A2 ‐1H O U S E  ‐ MAIN  FLOOR  PLANS A2 ‐2H O U S E  ‐ SECOND  FLOOR  PLANS A2 ‐3H O U S E  ‐ EXTERIOR  ELEVATIONS 12/10/20 A2 ‐4H O U S E  ‐ EXTERIOR  ELEVATIONS 12/10/20 A3 ‐1A D U  ‐ FLOOR  PLANS A3 ‐2A D U  ‐ EXTERIOR  ELEVATIONS A3 ‐3C O M B I N E D  ELEVATIONS 12/10/20 A4 ‐1B U I L D I N G  SECTIONS