Loading...
HomeMy WebLinkAbout1 MSP 1.01 COVER SHEET 12-4-2020REVISION DATECOVER SHEET 04 DECEMBER 2020 LANDSCAPE MIXED HIGH VISIBILITY CORNER MSP 1.01 NORTHWEST CROSSING BOZEMAN, MONTANA ISSUE DATE: 12.04.2020 PROJECT TEAM PROJECT INFORMATION INDEX OF DRAWINGS VICINITY MAP MASTER SITE PLAN ARCHITECT LOCATI ARCHITECTS 1007 E. MAIN ST. SUITE 202 BOZEMAN, MT 59715 CONTACT: LAURA DORNBERGER (P) 406.587.1139 (C) 406.570.7496 (E) LDORNBERGER@LOCATIARCHITECTS.COM PROPERTY OWNER NWX, LLC P.O. BOX 11890 BOZEMAN, MT 59719 CONTACT: BRYAN KLEIN (P) 406.582.8100 (C) 406.581.3812 (E) BKLEIN@BLACKRIDGECO.COM LEGAL DESCRIPTION TRACT 5 OF COS 2552 SITE PLAN INFO PHASED DEVELOPMENT MASTER SITE PLAN ENTITLEMENT PERIOD TO BE FIVE YEARS. FOLLOWING MASTER SITE PLAN APPROVAL, SEQUENTIAL INDIVIDUAL SITE PLANS FOR SPECIFIC AREAS WITHIN THE MASTER SITE PLAN SHALL BE SUBMITTED TO THE PLANNING DEPARTMENT. EACH SITE PLAN SHALL BE CONSISTENT WITH THE APPROVED MASTER SITE PLAN AND/OR MODIFY THE MASTER SITE PLAN ACCORDINGLY AND SUBJECT TO THE REVIEW CRITERIA OF BMC 38.19.100A. OPEN SPACE TO BE DETERMINED WITH SUBSEQUENT SUBDIVISION AND SITE PLAN SUBMITTALS. LOT AREA PERCENTAGES TO BE DETERMINED WITH SUBSEQUENT SUBDIVISION AND SITE PLAN SUBMITTALS. FLOOR AREA RATIO TO BE DETERMINED WITH SUBSEQUENT SUBDIVISION AND SITE PLAN SUBMITTALS. PARKING CALCULATIONS TO BE DETERMINED WITH SUBSEQUENT SUBDIVISION AND SITE PLAN SUBMITTALS. SITE AREA 160.508 ACRES | 6,991,719 SQUARE FEET CURRENT ZONING B2M, REMU CIVIL ENGINEER MORRISON-MAIERLE 2880 TECHNOLOGY BOULEVARD WEST BOZEMAN, MT 59718 CONTACT: MATT E. EKSTROM (P) 406.922.6784 (C) 406.431.5819 (E) MEKSTROM@M-M.NET PLANNER / LANDSCAPE ARCHITECTS NORRIS DESIGN 244 NORTH COLLEGE AVENUE #130 FORT COLLINS, CO 80524 CONTACT: MITCH BLACK (P) 303.892.1166 (C) 720.810.4828 (E) MBLACK@NORRIS-DESIGN.COM MSP 1.01 MSP 1.02 MSP 1.03 MSP 1.04 MSP 1.05 MSP 1.06 MSP 1.07 MSP 1.08 MSP 1.09 MSP 1.10 MSP 1.11 MSP 1.12 MSP 1.13 MSP 1.14 MSP 1.15 MSP 1.16 MSP 1.17 MSP 1.18 MSP 1.19 MSP 1.20 C100 C110 C120 C130 C140 C300 C310 EX-1 SS-1 SS-2 SS-3 C400 EX-RDCL EX-BSP 12/04/2020 08/03/2020 12/04/2020 12/04/2020 12/04/2020 08/03/2020 08/03/2020 08/03/2020 12/04/2020 08/03/2020 08/03/2020 10/13/2020 08/03/2020 08/03/2020 12/04/2020 12/04/2020 12/04/2020 12/04/2020 08/03/2020 08/03/2020 09/24/2019 03/11/2020 09/24/2019 03/11/2020 03/11/2020 03/11/2020 08/06/2020 07/13/2020 07/13/2020 07/13/2020 07/13/2020 03/11/2020 06/05/2020 06/05/2020 SHEET CIVIL DATECONTENT COVER SHEET AERIAL REGIONAL CONTEXT FRAMEWORK PLAN AND ZONING PARKS, OPEN SPACE & TRAILS FRAMEWORK HOMESTEAD PARK VISION (P1,P2, P3) POTENTIAL PARK AMENITIES POTENTIAL PARK AMENITIES PARK SIGN TRANSPORTATION FRAMEWORK STREET TYPICAL SECTIONS STREET TYPICAL SECTIONS STREET TYPICAL SECTIONS STREET TYPICAL SECTIONS STREET TYPICAL SECTIONS PEDESTRIAN CONNECTIVITY FRAMEWORK BICYCLE CONNECTIVITY FRAMEWORK PHASING PLAN LANDSCAPE FRAMEWORK LANDSCAPE PALETTE LANDSCAPE PALETTE EXISTING TOPOGRAPHIC SURVEY ZONING BOUNDARY ADJUSTMENT SURFACE WATER AND WETLANDS LOCATIONS CONSTRUCTION MANAGEMENT PLAN - INFRASTRUCTURE IMPROVEMENTS CONSTRUCTION MANAGEMENT PLAN - SITE IMPROVEMENTS WATER UTILITY PLAN SANITARY SEWER UTILITY PLAN GRAVITY SEWER PLAN GRAVITY SEWER PROFILES GRAVITY SEWER PROFILES GRAVITY SEWER PROFILES PRELIMINARY STORM DRAINAGE PLAN ROADWAY-CENTERLINE-DATA-EXHIBIT SPORTS-PARK-COORDINATION-EXHIBIT BAXTER LANE W. OAK STREET SITE LA U R A L S T R E T C O T T O N W O O D R O A D REMU B2M BLOCK FRONTAGES CITY LIMITS PARK CALCULATIONS FOR PARK LAND AREA DEDICATION REQUIREMENTS AND PARK LAND AREA PROVIDED SEE SHEET MSP1.04