HomeMy WebLinkAbout11 MSP 1.11 STREET TYPICAL SECTIONS 12-4-2020REVISION DATENORTHWEST CROSSING | STREET TYPICAL SECTIONS
3 AUGUST 2020
50 10
SCALE: 1” = 10’
20
NORTH
SECTION KEY
CO
T
T
O
N
W
O
O
D
R
O
A
D
BAXTER LANE
ARTERIAL STREET 125’ ROW (OAK STREET)
COLLECTOR ROAD 90’ ROW (LAUREL PARKWAY)
1’0.5’
0.5’0.5’0.5’0.5’
0.5’1’ STRIPE 1’ STRIPE 1’
6’ SIDEWALK 6’ SIDEWALK
2’ EASEMENT 2’2’
14’ BOULEVARD 14’ BOULEVARD10’ DRIVING LANE
10’ DRIVING LANE5’ BIKE LANE 5’ BIKE LANE
15’ DOUBLE LEFT TURNING LANE
90’ ROW
125’ ROW
60’65’
SO
U
T
H
R
O
W
NO
R
T
H
R
O
W
1’
1’10’ SIDEWALK 10’ SIDEWALK5’ BOULEVARD 8’ BOULEVARD
6’ BIKE LANE 6’ BIKE LANE11.5’ DRIVING LANE 11.5’ DRIVING LANE 28’ MEDIAN 11.5’ DRIVING LANE 11.5’ DRIVING LANE
WEST OAK STREET
LA
U
R
E
L
P
A
R
K
W
A
Y
MSP 1.11NOTE: BOULEVARDS, MEDIANS, AND ALLEYS SHOULD INCLUDE WATER-CONSCIOUS DESIGN, INTEGRATED STORMWATER MANAGEMENT, ETC. PER CITY OF BOZEMAN STANDARDS.