Loading...
HomeMy WebLinkAbout19 - Design Report - Gran Cielo - StormwaterGran Cielo Major Subdivision Preliminary Plat Application Stormwater Management The modification of the Gran Cielo Subdivision Plat presented with this application (changing Lot 4, Block 14 from dedicated parkland to residential) will alter the circumstances relating to stormwater management reviewed by staff and the commission during the original Preliminary Plat approval. This is because by removing dedicated parkland and replacing it with a residential lot, the impervious area increased and necessitated a slightly larger detention pond in the NW corner of Block 14. An updated stormwater management report is included in this section which reflects the change of Lot 4, Block 14 from parkland to residential. This report and associated calculations and figures were created for the Gran Cielo Subdivision infrastructure design review and was submitted to the engineering department on April 11, 2019. It is included in this section for the completeness of this Preliminary Plat application.