HomeMy WebLinkAbout19 - Design Report - Gran Cielo - StormwaterGran Cielo Major Subdivision
Preliminary Plat Application
Stormwater Management
The modification of the Gran Cielo Subdivision Plat presented with this application
(changing Lot 4, Block 14 from dedicated parkland to residential) will alter the circumstances
relating to stormwater management reviewed by staff and the commission during the original
Preliminary Plat approval. This is because by removing dedicated parkland and replacing it
with a residential lot, the impervious area increased and necessitated a slightly larger
detention pond in the NW corner of Block 14.
An updated stormwater management report is included in this section which reflects the
change of Lot 4, Block 14 from parkland to residential. This report and associated
calculations and figures were created for the Gran Cielo Subdivision infrastructure design
review and was submitted to the engineering department on April 11, 2019. It is included in
this section for the completeness of this Preliminary Plat application.