Loading...
HomeMy WebLinkAboutCOB001 COVER V2 of 4 03-28-2018P R O F ESSIONA L E N G I N E E R M O N T AN A ANDREW S. MOORE No. 38404PE LICENS E D ® 8 0 0 . 7 5 7 . 9 5 2 2 w w w . c t a g r o u p . c o m REVISIONS CIVIL KYLE SCARR LANDSCAPE ARCH. DAYTON RUSH ARCHITECTURE ROBERT FRANZEN ELECTRICAL ANDREW MOORE VICINITY MAP: Locator PROJECT LOCATION SHEET INDEX ZONING MAP DO NOT SCALE 3/28/2018 1:19:50 PM COVER COB001 NE W B O Z E M A N H I G H S C H O O L BO Z E M A N , M O N T A N A 5 9 7 1 8 © 2018 | ALL RIGHTS RESERVED 44 5 0 A N N I E S T R E E T 03/28/18 03/28/18 03/28/18 03/28/18 4450 ANNIE STREET BOZEMAN, MONTANA 59718 BOZEMAN, MONTANA 59718 NEW BOZEMAN HIGH SCHOOL FINAL SITE PLAN SUBMITTAL 03/28/18 4450 ANNIE STREET 03.28.2018 CHECKED BY | FRANZEN DRAWN BY | WELLES FINAL SITE PLAN SUBMITTAL | CTA # BZNHS_TI | L:\BZNHS\BIMCAD\Revit FL A N D E R S M I L L RO A D NO R T H C O T T O N W O O D RO A D DURSTON ROAD WEST OAK STREET ANNIE STREET ANNIE STREET ARCHITECTURAL COB201 EXTERIOR ELEVATIONS COB202 ENLARGED EXTERIOR ELEVATIONS COB203 ENLARGED EXTERIOR ELEVATIONS COB210 BUILDING PERSPECTIVES COB211 SITE OUTBUILDING PERSPECTIVES COB212 SITE OUTBUILDING PERSPECTIVES COB701 MAINTENANCE BUILDING COB702 TRACK/FIELD BUILDING COB703 COMFORT STATION BUILDING COB704 DUG OUT CIVIL LANDSCAPE C101 VICINITY, ZONING, & CONSTRUCTION ROUTE MAPS C102 NOTES. LEGEND, & ABBREVIATIONS 3/28/2018 C201 SURVEY DATA & EXISTING CONDITIONS MAP 3/28/2018 C202 DEMOLITION PLAN C203 DEMOLITION PLAN C204 OFF -SITE ROAD IMPROVEMENTS OVERVIEW C205 SITE PLAN OVERVIEW & SHEET INDEX C206 UTILITY PLAN OVERVIEW 3/28/2018 C207 SITE CONDUIT PLAN 3/28/2018 C208 SITE CONDUIT PLAN 3/28/2018 C209 CIVIL PLANNING MAP 3/28/2018 C210 MINIMUM CONSTRUCTION BMP'S C211 BMP DETAILS C301 SITE PLAN 3/28/2018 C302 SITE PLAN 3/28/2018 C303 SITE PLAN 3/28/2018 C304 SITE PLAN 3/28/2018 C305 SITE PLAN 3/28/2018 C306 SITE PLAN 3/28/2018 C307 SITE PLAN 3/28/2018 C308 SITE PLAN 3/28/2018 C309 SITE PLAN 3/28/2018 C310 SITE PLAN 3/28/2018 C311 SITE PLAN 3/28/2018 C312 SITE PLAN 3/28/2018 C313 SITE PLAN 3/28/2018 C401 SEWER PLAN* 3/28/2018 C402 COMFORT STATION SEWER SERVICE* 3/28/2018 C501 OAK STREET WATER MAIN PLAN & PROFILE* C502 OAK STREET WATER MAIN PLAN & PROFILE* 3/28/2018 C503 COTTONWOOD RD WATER MAIN PLAN & PROFILE* 3/28/2018 C504 ANNIE STREET WATER MAIN PLAN & PROFILE* C505 ANNIE STREET WATER MAIN PLAN & PROFILE* 3/28/2018 C506 INTERIOR SITE WATER MAIN PLAN & PROFILE* C507 INTERIOR SITE WATER MAIN PLAN & PROFILE* C508 INTERIOR SITE WATER MAIN PLAN & PROFILE* C509 FIRE & DOMESTIC WATER SERVICE PLAN & PROFILE* C510 GEOTHERMAL WATER SERVICE PLAN* C601 COTTONWOOD ROAD STORM DRAINAGE PLAN* C602 COTTONWOOD ROAD STORM DRAINAGE PLAN* 3/28/2018 C603 COTTONWOOD & OAK STORM DRAINAGE PLAN* 3/28/2018 C604 OAK STREET STORM DRAINAGE PLAN* 3/28/2018 C605 OAK STREET OUTFALL STORM DRAINAGE PLAN* C606 OAK STREET OUTFALL STORM DRAINAGE PLAN* C607 ANNIE STREET STORM DRAINAGE PLAN* C608 WEST SITE STORM DRAINAGE PLAN* C609 WEST SITE STORM DRAINAGE PLAN* C610 EAST SITE STORM DRAINAGE PLAN* C611 EAST SITE STORM DRAINAGE PLAN* C701 SITE GRADING PLAN 3/28/2018 C702 SITE GRADING PLAN 3/28/2018 C703 SITE GRADING PLAN 3/28/2018 C704 SITE GRADING PLAN 3/28/2018 C705 SITE GRADING PLAN 3/28/2018 C706 SITE GRADING PLAN 3/28/2018 C707 SITE GRADING PLAN 3/28/2018 C708 SITE GRADING PLAN 3/28/2018 C709 SITE GRADING PLAN 3/28/2018 C710 SITE GRADING PLAN 3/28/2018 C711 SITE GRADING PLAN 3/28/2018 C712 SITE GRADING PLAN 3/28/2018 C713 SITE GRADING PLAN 3/28/2018 L001 SITE NOTES 3/28/2018 L100 OVERALL SITE PLAN L101 LANDSCAPE SITE PLAN L102 LANDSCAPE SITE PLAN L103 LANDSCAPE SITE PLAN 3/28/2018 L104 LANDSCAPE SITE PLAN L105 LANDSCAPE SITE PLAN 3/28/2018 L106 LANDSCAPE SITE PLAN 3/28/2018 L107 LANDSCAPE SITE PLAN 3/28/2018 L108 LANDSCAPE SITE PLAN 3/28/2018 L109 LANDSCAPE SITE PLAN 3/28/2018 L110 LANDSCAPE SITE PLAN 3/28/2018 L111 LANDSCAPE SITE PLAN L112 LANDSCAPE SITE PLAN L113 LANDSCAPE SITE PLAN L114 LANDSCAPE SITE PLAN L115 LANDSCAPE SITE PLAN L116 LANDSCAPE SITE PLAN L201A PLAZA ENLARGEMENTS L201B PLAZA ENLARGEMENTS L202 SITE DETAILS L203 PLANTING DETAILS L300 IRRIGATION NOTES L301 SOUTH IRRIGATION PLAN L302 NORTH IRRIGATION PLAN L303 IRRIGATION DETAILS 3/28/2018 L701 FENCING DETAILS 3/28/2018 CIVIL C801 ROADWAY PLAN & PROFILE - COTTONWOOD ROAD* 3/28/2018 C802 ROADWAY PLAN & PROFILE - COTTONWOOD ROAD* 3/28/2018 C803 ROADWAY PLAN & PROFILE - COTTONWOOD ROAD* 3/28/2018 C804 ROADWAY PLAN & PROFILE - COTTONWOOD ROAD* 3/28/2018 C805 ROADWAY PLAN & PROFILE - OAK STREET* 3/28/2018 C806 ROADWAY PLAN & PROFILE - OAK STREET* 3/28/2018 C807 ROADWAY PLAN & PROFILE - OAK STREET* 3/28/2018 C808 ROADWAY PLAN & PROFILE - ANNIE STREET* 3/28/2018 C809 ROADWAY PLAN & PROFILE - ANNIE STREET* 3/28/2018 C810 COTTONWOOD & OAK ROUNDABOUT LAYOUT* 3/28/2018 C811 ROUNDABOUT SPLITTER ISLAND DETAILS* 3/28/2018 C812 INTERSECTION IMPROVEMENTS* 3/28/2018 C813 INTERSECTION IMPROVEMENTS* 3/28/2018 C814 STRIPING & SIGNAGE PLAN - COTTONWOOD ROAD* 3/28/2018 C815 STRIPING & SIGNAGE PLAN - COTTONWOOD ROAD* 3/28/2018 C816 STRIPING & SIGNAGE PLAN - WEST OAK STREET* 3/28/2018 C817 SIGNAGE PLAN - ROUNDABOUT* 3/28/2018 C818 STRIPING PLAN - ROUNDABOUT* 3/28/2018 C819 STRIPING PLAN - ROUNDABOUT* 3/28/2018 C820 STRIPING & SIGNAGE PLAN - OAK STREET* 3/28/2018 C821 STRIPING & SIGNAGE PLAN - ANNIE STREET* 3/28/2018 C822 STRIPING & SIGNAGE PLAN - ANNIE STREET* 3/28/2018 C823 STRIPING & SIGNAGE PLAN - SCHOOL ZONES* 3/28/2018 CD101 TYPICAL SECTIONS - COTTONWOOD ROAD & OAK STREET* CD102 TYPICAL SECTIONS - ROUNDABOUT & ANNIE STREET* CD103 TYPICAL HARDSCAPE SECTIONS 3/28/2018 CD104 CONCRETE DETAILS CD105 CONSTRUCTION DETAILS 3/28/2018 CD106 PCCP DETAILS* CD107 SIGNAGE & STRIPING DETAILS CD108 MISCELLANEOUS DETAILS 3/28/2018 CE101 OAK STREET & COTTONWOOD ROAD HAWK TRAFFIC SIGNAL PLAN* CE102 OAK STREET & COTTONWOOD ROAD HAWK TRAFFIC SIGNAL UTILITY PLAN* 3/28/2018 CE103 OAK STREET HAWK TRAFFIC SIGNAL PLAN* CE104 OAK STREET HAWK TRAFFIC SIGNAL UTILITY PLAN* CE105 COTTONWOOD ROAD LIGHTING PLAN* 3/28/2018 CE106 COTTONWOOD ROAD LIGHTING PLAN* CE107 OAK STREET LIGHTING PLAN* CE108 OAK STREET LIGHTING PLAN* CE109 POLE & PULL BOX SCHEDULE* CE110 SERVICE S -1 WIRING DIAGRAMS* CE111 SERVICE S -2 WIRING DIAGRAMS* CE112 SERVICE S -3 WIRING DIAGRAMS* CE113 WATERTIGHT CONNECTION & ELECTRICAL SERVICE DETAILS* CE114 CONTROLLER PEDESTAL PULL BOX DETAILS* CE115 SIGNAL STANDARD DETAIL* CE116 TYPE 1 SIGNAL DETAILS* CE117 TYPE 10 -A LUMINAIRE STANDARD DETAIL* NORTH SITE OWNER BOZEMAN SCHOOL DISTRICT #7 404 WEST MAIN STREET BOZEMAN, MT 59715 406.522.6000 ARCHITECT/ENGINEER CTA Architects Engineers 411 EAST MAIN STREET, SUITE 101 BOZEMAN, MT 59715 406.556.7100 Project Manager: ROBERT FRANZEN CIVIL ENGINEERING TD&H ENGINEERING 234 EAST BABCOCK, SUITE 3 BOZEMAN, MT 59715 406.586.0277 CONTRACTOR LANGLAS & ASSOCIATES 1019 E MAIN STREET, SUITE 101 BOZEMAN, MT 59718 406.585.3420 SITE ELECTRICAL E001 SITE ELECTRICAL LEGEND, SCHEDULE, & DETAILS E002 SITE ELECTRICAL DETAILS E100 ELECTRICAL OVERALL SITE PLAN E101 ELECTRICAL ENLARGED SITE PLAN E102 ELECTRICAL ENLARGED SITE PLAN E103 ELECTRICAL ENLARGED SITE PLAN E104 ELECTRICAL ENLARGED SITE PLAN E105 ELECTRICAL ENLARGED SITE PLAN E106 ELECTRICAL ENLARGED SITE PLAN E107 ELECTRICAL ENLARGED SITE PLAN E108 ELECTRICAL ENLARGED SITE PLAN E109 ELECTRICAL ENLARGED SITE PLAN E110 ELECTRICAL ENLARGED SITE PLAN E111 ELECTRICAL ENLARGED SITE PLAN E112 ELECTRICAL ENLARGED SITE PLAN E113 ELECTRICAL ENLARGED SITE PLAN E114 ELECTRICAL ENLARGED SITE PLAN E115 ELECTRICAL ENLARGED SITE PLAN E116 ELECTRICAL ENLARGED SITE PLAN NORTH * Sheets Not Printed -Submitted Separately to City Engineering Dept. on 2.9.18 (Electronic Copy Provided) Robert S. Franzen No. 2933 DAYTON RUSH 7160 L A N D S CAP A R C H I T E C T MON TA N ASTATEOF E L I CE N S E D VOLUME 2 OF 4 LOT LEGAL DESCRIPTION TRACT 1A2 OF COS NO. 2554B LOCATED IN THE SW 1/4 OF SEC. 3, T2S, R5E, P.M.M. GALLATIN COUNTY, MONTANA TRACT 2A OF COS NO. 2554A LOCATED IN THE SW 1/4 OF SEC. 3, T2S, R5E, P.M.M. GALLATIN COUNTY, MONTANA PARKING ARTICLE 25, SECTION 38.25.010 OF THE CITY OF BOZEMAN UNIFORM DEVELOPMENT CODE REQUIRES 1,512 PARKING STALLS FOR A 1,500 STUDENT SCHOOL WITH A 750 SEAT AUDITORIUM, 2,500 SEAT COMPETITION GYMNASIUM AND TWO AUXILIARY GYM SEATING 200 SEATS EACH. THE PROPOSED PROJECT INCLUDES 613 STALLS ON -SITE. PARKING QUANTITIES ARE A DEVIATION. SEE THE FINAL SITE SUBMITTAL APPENDIX FOR A DETAILED ANALYSIS. BICYCLE STORAGE REQUIRED FOR THE SITE IS 5% OF THE TOTAL PARKING PROVIDED OR 61 SPACES, 70 SPACES HAVE BEEN PROVIDED.