HomeMy WebLinkAbout20213 & 20216 Staff Report Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 1 of 18 Application No. 20213 & 20216 Type Master Site Plan & Site Plan Project Name Billings Clinic Summary Master site plan for the Billings Clinic Bozeman Campus. Site plan is for Phase 1 which contains an ambulatory center on 13 acres. This staff report pertains to both the MSP & SP. Zoning B-2 Growth Policy Regional Commercial & Services Parcel Size 58 acres Overlay District(s) None Street Address 3905 Wellness Way, Bozeman, MT 59718 Legal Description Lot 2-A1, Minor Subdivision 221F, T1S, R5E, PMM, City of Bozeman, Gallatin County, Montana Owner Billings Clinic, 2800 10th Avenue North, Billings, MT 59101 Applicant Same as owner Representative Sanderson Stewart, 1300 North Transtech Way, Billings, MT 59102 Staff Planner Sarah Rosenberg Engineer Griffin Nielsen Noticing Public Comment Period Site Posted Adjacent Owners Mailed Newspaper Legal Ad 10/6-10/21/2020 10/6/2020 10/6/2020 N/A Advisory Boards Board Date Recommendation DRC 10/1/2020 Adequacy ADR 10/1/2020 Approval Recommendation Approval Decision Authority Director of Community Development Date Full application and file of record: Community Development Department, 20 E. Olive St., Bozeman, MT 59715 DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 2 of 18 FINDINGS OF FACT AND APPEAL PROVISIONS CERTIFICATE A) PURSUANT to Chapter 38, Article 2, Bozeman Municipal Code (BMC), and other applicable sections of Ch.38, BMC, public notice was given, opportunity to submit comment was provided to affected parties, and a review of the Site Plan described in this report was conducted. The applicant proposed to the City a Master Site Plan (MSP) and Site Plan (SP) to construct an ambulatory center in Phase I of the development and master site plan for 53 acres. The purposes of the MSP & SP review were to consider all relevant evidence relating to public health, safety, welfare, and the other purposes of Ch. 38, BMC; to evaluate the proposal against the criteria of Sec. 38.230.100 BMC, and the standards of Ch. 38, BMC; and to determine whether the application should be approved, conditionally approved, or denied. B) It appeared to the Director that all parties and the public wishing to examine the proposed Site Plan and offer comment were provided the opportunity to do so. After receiving the recommendation of the relevant advisory bodies established by Ch. 38, Art. 210, BMC, and considering all matters of record presented with the application and during the public comment period defined by Ch. 38, BMC, the Director has found that the proposed Site Plan would comply with the requirements of the BMC if certain conditions were imposed. Therefore, being fully advised of all matters having come before them regarding this application, the Director makes the following decision. C) The Site Plan has been found to meet the criteria of Ch. 38, BMC, and is therefore approved, subject to the conditions listed in this report and the correction of any elements not in conformance with the standards of the Title. The evidence contained in the submittal materials, advisory body review, public testimony, and this report, justifies the conditions imposed on this development to ensure that the Site Plan complies with all applicable regulations, and all applicable criteria of Ch. 38, BMC. On this ______ day of ________________, 2020, Martin Matsen, Director of Community Development, approved with conditions this Site Plan for and on behalf of the City of Bozeman as authorized by Sec. 38.200.010, BMC. D) This Director of Community Development’s project decision may be appealed by filing a documented appeal with and paying an appeal fee to the Clerk of the Commission for the City of Bozeman within 10 working days after the date of the final decision as evidenced by the Director’s signature, following the procedures of Sec. 38.250.030, BMC. DIRECTOR OF COMMUNITY DEVELOPMENT CONDITIONS OF APPROVAL Please note that these conditions are in addition to any required code provisions identified in this report. Additional conditions of approval and code corrections are required and will be included with the final report provided to the Director of Community Development 1. Upon future development, the applicant must provide and file with the County Clerk and Recorder's office executed Waivers of Right to Protest Creation of Special Improvement Districts (SID’s) for the following: i. Street improvements to East Valley Center Road including lighting signalization paving, curb/gutter, sidewalk, lighting and storm drainage ii. Street improvements to North 27th Avenue including lighting signalization paving, curb/gutter, sidewalk, lighting and storm drainage iii. Street improvements to Davis Lane including lighting signalization paving, curb/gutter, sidewalk, lighting and storm drainage DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A December4th Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 3 of 18 iv. Street improvements to West Lake Road including lighting signalization paving, curb/gutter, sidewalk, lighting and storm drainage v. Intersection improvements to East Valley Center Road and North 27th Avenue vi. Intersection improvements to East Valley Center Road and Davis Lane vii. Intersection improvements to East Valley Center Road and Catamount Street viii. Intersection improvements to Catamount Street and North 27th Avenue ix. Intersection improvements to Catamount Street and Davis Lane The applicant may obtain a copy of the template SID waiver from the City Engineering Department (Griffin Nielsen). The document filed must specify that in the event an SID is not utilized for the completion of these improvements, the applicant agrees to participate in an alternate financing method for the completion of said improvements on a fair share, proportionate basis as determined by square footage of property, taxable valuation of the property, traffic contribution from the development, or a combination thereof. The applicant must provide a copy of the SID waiver filed with the County Clerk and Recorder prior to master site plan approval. 2. The subject property is located in an area with high groundwater with potentially corrosive soils, which can increase the likelihood of water main failure over the lifespan of the asset. The applicant must perform a corrosivity analysis to determine if cathodic protection is required for the proposed distribution mains. A minimum of V-bio polyrap or approved equal is required by the City. 3. The portion of lot 2A-1 not currently with in the City limits must be annexed into the City prior to the development of Zone B or the extension “Street A”, whichever is first. 4. Please provide the separate sheet (Sheet C6) which clearly identifies all easements, which have been provided with the master site plan (i.e. utility, public access, public street and utility). CODE REQUIREMENTS FOR SUBSEQUENT MASTER SITE PLAN PHASES 1. BMC 38.230.100. – Plan Review Criteria: The review of the necessary infrastructure (including expansions to the water, wastewater, storm sewer, and transportation systems) to support individual phases has only been completed for Phase 1. The infrastructure required to support subsequent phases must be reviewed each future development application. The follow are requirements do not constitute a complete list of improvements but have been specifically identified with the master site plan application. 2. BMC 38.230.100.A.6.a - Transportation Facilities and Access: There are a number of recommended improvements identified with the TIS. The TIS provides limited detail on the timing for required improvements between the completion of Phase 1 to the projected full build out year of 2040 to the City’s transportation system associated with the development. The TIS must be reviewed with each subsequent phase to determine if the assumption within the report are still valid and if warrants for the identified improvements are met. 3. BMC 38.400.010. – Streets, General: Davis Lane must be upgraded to a minor arterial standard according to the City’s TMP. The development is responsible for properties local share of the improvements to Davis Lane. 4. BMC 38.400.010 – Streets, General and 38.410.040 - Blocks: Honor Lane must be full constructed along the properties southern boundary to meet the City local street standard. The portion of right-of-way located on the property to the south (Lot 4 of Minor Subdivision 221B) must be obtained from the property to the south prior to future phased site plan approval. 5. BMC 38.410.040- Blocks: A public local street must extend between Street A/Wellness Way and Westlake Road. At the time when the development connects to Westlake Road this road must be completed and dedicated as a public street. As proposed the applicant is designing the internal drive aisle to meet they City’s local street standards. 6. BMC 38.400.010. – Street, General: Westlake Road must be upgraded to meet minimum local street standards from western property boundary to the intersection of East Valley Center Road when connection is made to Westlake or with development of any structure directly adjacent to the Westlake Road. Westlake Road must be realigned such that it DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 4 of 18 intersects with East Valley Center Road at an angle greater than 75 degrees, per 38.400.030. and has a length of tangency at the intersection of 100-ft per Table IV-2 from the City Design Standards and Specification Policy Manual (DSSP), which can be found on the engineering departments webpage. The proposed realignment Westlake Road exceeds the minimum allowable radius and will not be allowed. Additional right-of-way must be obtained to ensure the street design standards are met. The right-of-way must be obtained prior to approval of any subsequent phase requiring the upgrade to Westlake Road. 7. BMC 38.400.040. – Street Names: Prior scheduling of the pre-construction meeting for any new street within the development documentation must be provided to the City demonstrating that both the County and the City Engineering Department has approved the street name. 8. BMC 38.400.110. – Transportation Pathways: The shared use path along East Valley must be fully constructed along the property frontage with Phase 1. 9. BMC 38.410.060. – Easements: The following easements or right-of-way (ROW) must be provided by the timing defined below: a. Any additional public street and utility easement or right-of-way necessary for the realignment and upgrade to Westlake Road prior to approval of the phase in which Westlake Road must be completed. b. The additional 30 ft public street and utility easement or right-of-way from the property to the necessary to full construct Honor Lane prior to approval of the phase in which Honor Lane must be completed. c. A 60 foot public local street or right-of-way extending between Street A and Westlake Road prior to approval of the phase when the development connects to Westlake Road. d. A 10 foot utility easement fronting on the north side of Honor Lane prior to approval of the phase in which Honor Lane must be completed. 10. BMC 38.410.070. - Municipal water, sanitary sewer and storm sewer systems: The development must abide by the agreement title “AGREEMENT REGARDING INFRASTRUCTURE” approved by the City Commission on May 4, 2020. As presented, the sanitary layout shows a future connection to the City’s Norton East Ranch O utfall (CIP No. WWIF138) and the Davis Lane Lift Station (CIP No. WWIF31 and WWIF24) projects, which were identified in the agreement as Option A. At this time, the aforementioned capital improvements are under construction. The applicant is advised that the City cannot guarantee the overall time and completion of these improvements, but can provide updates to the applicant as requested throughout the construction process. 11. BMC 38.410.070. - Municipal water, sanitary sewer and storm sewer systems: Each phase of development must connect to the water distribution system at a minimum of two points to allow a redundant feed (per City of Bozeman Engineering DSSP Section V.A. 5). 12. BMC 38.410.080. – Grading and Drainage: The design of all drainage and stormwater infrastructure must comply with the City’s drainage standards and MS4 permit. A detailed review of design will occur with each phase of the development. The discharge of untreated stormwater into any water course, including Cattail Creek, is not permit. 13. BMC 38.410.080.E. – Grading and Drainage: Pubic drainage easement(s) must be provided for the stormwater facilitates supporting drainage from public roadways not included with the first phase of development, which includes Davis Lane, Honor Lane, Westlake Road and other proposed public roadways. The easement(s) must be provided with the future phase site plans. The property owner(s) are responsible for the maintenance of these facilities. 14. BMC 38.410.130. – Water Adequacy: Water rights and/or payment of cash-in-lieu of water right is required prior to development for the demand on the City’s potable water system. The development’s annual water demand profile must be provided with future phased site plan application(s). The analysis should include an analysis of meter records from the owners existing facilities. 15. BMC 38.600. – Floodplain Regulations: All recommendations provided in the flood hazard evaluation conclusion section (report pg 4) must be incorporated into their respective phases of the development. Three recommendations are provided: a. The existing drainage pattern from the existing conveyance swale along the east and northwest boundaries of the site must be maintained or the rate of runoff must be reduced. DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 5 of 18 b. All buildings within the development must be constructed with a minimum finished floor elevation +2 feet above the calculated base flood elevation (BFE). c. Cattail Creek channel between cross sections W and Z as recommended within the Flood Hazard Evaluation Report provided with Master Site Plan. d. The flood analysis must be updated to account for the Street A/Wellness Way crossing when the associated phase is submitted for site plan. 16. BMC 40.04.720 – Maintenance of stormwater facilities: The property owner is response for maintenance of all the proposed stormwater facilities located outside of the public right-of-way. A comprehensive maintenance plan must be provide with the any subsequent phase site plan and updated as need to reflect new facilities. The hydrodynamic separators must be included in the maintenance plans and be maintained by the property owner. If a separator is approved within the public right-of-way the owner must obtained a utility occupancy permit from the City. ENGINEERING ADVISORY COMMENTS: 1. The applicant is advised that any street or driveway connection to East Valley Center Road must be approved by the Montana Department of Transportation. 2. Prior to scheduling an infrastructure PRE-CONstruction meeting with the City, the applicant must obtain approval from The Montana Department of Environmental Quality for water and sanitary sewer infrastructure constructed with this project 3. In the event that the applicant wishes to dedicate the proposed street and utility easements as public ROW public drainage easements must be provided for all storm conveyance facilities located outside of the easements. All stormwater basins must be located in common open space lots, overlaid with a pubic drainage easement. The property owner(s) will remain responsible for the maintenance of the facilities. 4. The Montana Department of Fish, Wildlife & Parks, SCS, Montana Department of Environmental Quality and Army Corps of Engineer's shall be contacted regarding the proposed project and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained prior to future plat approval. DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 6 of 18 Figure 1: Current Zoning Map DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 7 of 18 Figure 2: Proposed Master Site Plan DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 8 of 18 Figure 3: Phase I Site Plan DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 9 of 18 DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 10 of 18 DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 11 of 18 DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 12 of 18 Figures 4-10: Ambulatory Center (Phase I) Renderings DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 13 of 18 ANALYSIS AND FINDINGS Analysis and resulting recommendations based on the entirety of the application materials, municipal codes, standards, plans, public comment, and all other materials available during the review period. Collectively this information is the record of the review. The analysis in this report is a summary of the completed review. Plan Review, Section 38.230.100, BMC In considering applications for plan approval under this title, the Director of Community Development shall consider the following: 1. Conformance with Article 1 - Consistency with the City’s adopted Growth Policy 38.100.040.D Meets Code? Growth Policy Land Use Regional Commercial and Services Zoning B-2 Comments: A medical campus is an allowed use in the B-2 zone district. It meets the underlying growth policy designation as it serves the region, is located near significant transportation facilities (I-90) and is an economically prominent facility. 2. Conformance with Article 1 - All other applicable laws, ordinances, and regulations (38.100.080) Condominium ownership NA Comments: Additional steps will be required including but not limited to final payment for cash in lieu of water rights, recordation of the SID waiver and final plan documents and approval of building permits. The Building Division of the Department of Community Development will review the requirements of the International Building Code for compliance at the time of building permit application. 3. Conformance with Article, including the cessation of any current violations (38.200.160) Meets Code? Current Violations None Yes Comments: There are no current violations on the property. 4. Conformance with Article 2 - Submittal material (38.220) requirements and plan review for applicable permit types (38.230) Meets Code? Site Plan Yes Submittal requirements 38.220.100 Yes Phasing of development 38.230.020.B No. of phases: Multiple Yes Comments: The site plan criteria are met with this project. All appropriate documents and plans were submitted with the application. Phase I of the master site plan consists of an ambulatory center. There hasn’t been a determined amount of phases within the master site plan. Each phase is required a subsequent site plan application. 5. Conformance with Article 3 - Zoning Provisions (38.300) Meets Code? Permitted uses 38.310 Medical and offices Yes Form and intensity standards 38.320 Zoning: B-2 Setbacks (feet) Structures Parking / Loading Yes Front Mixed: 10’, Gateway: 25’ NA Rear 10 10 Side 5 0 Alley NA NA DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 14 of 18 Comments: The proposed setbacks meet all B-2 zone district standards. Block frontage analysis for front setback is detailed below in Section 7a. Lot coverage 26.3% Allowed 100% Yes Building height 66’ Allowed 57’-3” Yes Comments: Maximum height may be increased by up to a maximum of 50 percent when the zoning district is implementing a regional commercial and services growth policy land use designation. Applicable zone specific or overlay standards 38.330-40 NA Comments: This project is not in an overlay district or special district General land use standards and requirements 38.350 Yes Comments: All encroachments are in conformance to standards. Applicable supplemental use criteria 38.360 NA Supplemental uses/type NA NA Comments: There are no additional uses proposed for this project Wireless facilities 38.370 NA Affordable Housing 38.380.010 NA Affordable housing plan NA Comments: There is no affordable housing component or wireless facility proposed with this project. 6a. Conformance with Article 4 - Community Design Provisions: Transportation Facilities and Access (38.400) Meets Code? Streets 38.400.010 Yes Street and road dedication 38.400.020 Yes Access easements Yes Level of Service 38.400.060 Yes Transportation grid adequate to serve site Yes Comments: Streets are dedicated with this project and easements were provided and recorded. A traffic impact study to determine the level of service was required and approved. Sidewalks 38.400.080 Yes Comments: Sidewalks constructed with this project meet standards. Drive access 38.400.090 Access to site: Phase I: 2; MSP: 6 Yes Fire lanes, curbs, signage and striping Yes Comments: Access to the overall site comes from Davis Lane to the west, North 27th to the east, East Valley Center to the northeast, Westland Road to the north, and an unnamed street to the south. Access to the ambulatory center with Phase I is comes from East Valley Center to a street that will be constructed with the project called Wellness Way. Street vision triangle 38.400.100 Yes Transportation pathways 38.400.110 Yes Pedestrian access easements for shared use pathways and similar transportation facilities Yes Public transportation 38.400.120 NA Comments: With the master site plan, transportation pathways and pedestrian access easements are provided throughout the site to accommodate pedestrian circulation. The northern portion of a class I path along East Valley Center will be constructed with Phase I. Additional shared use paths and transportation pathways throughout the rest of the Master Site Plan will be evaluated with each subsequent site plan. DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 15 of 18 6b. Conformance with Article 4 – Community Design Provisions: Community Design and Elements (38.410) Meets Code? Neighborhood centers 38.410.020 Yes Comments: Neighborhood centers are required for developments larger than 10 acres. The Master Site Plan identifies one neighborhood center in the development that is over 1 acre in size. Lot and block standards 38.410.030-040 Yes Midblock crossing: rights of way for pedestrians alternative block delineation Yes Comments: Lot and block width and length standards are met in both the master site plan and phase I site plan applications in the form of streets and pedestrian access easements. If the development is adjacent to an existing or approved public park or public open space area, have provisions been made in the plan to avoid interfering with public access to and use of that area Yes Provisions for utilities including efficient public services and utilities 38.410.050-060 Yes Easements (City and public utility rights-of-way etc.) Yes Water, sewer, and stormwater Yes Other utilities (electric, natural gas, communications) Yes CIL of water Yes Comments: All easements are provided, CIL was approved by the Engineering and was paid by the applicant. Municipal infrastructure requirements 38.410.070 Yes Comments: The project is relying on the completion of the Norton Each Ranch interceptor and the Davis lift station. These offsite pieces of infrastructure must be completed and accepted by the City prior to occupancy of the ambulatory center (phase 1). Grading & drainage 38.410.080 Yes Location, design and capacity of stormwater facilities Yes Stormwater maintenance plan Yes Landscaping: native species, curvilinear, 75% live vegetation 38.410.080.H Yes Comments: The grading and drainage plan, location of the stormwater facilities, and maintenance plan were reviewed and approved by the Engineering Department. Stormwater facilities include a series of inlets and piping that are routed to two separate underground boulder pits for retention and infiltration/treatment. Watercourse setback 38.410.100 Yes Watercourse setback planting plan 38.410.100.2.f NA Comments: There is a watercourse on the western portion of the master site plan. The setbacks are identified on the plan and meet standards. A setback planting plan will be required with the subsequent site plan that incorporates this area. 6c. Conformance with Article 4 – Community Design Provisions: Park and Recreation Requirements (38.420) Meets Code? Parkland requirements 38.420.020.A .52 ac. X 10 units/ac. X 0.03 ac.= .3 ac. NA Cash donation in lieu (CIL) 38.420.030 NA Improvements in-lieu NA Comments: There is no residential component with Phase I thus no parkland is required. Park Frontage 38.420.060 NA Park development 38.420.080 NA Recreation pathways 38.420.110 NA Park/Recreational area design NA DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 16 of 18 Comments: Any parkland that will be developed in future phases, standards will be analyzed. 7a. Conformance with Article 5 – Project Design: Block Frontage Standards (38.510) Meets Code? Block frontage classification Mixed, Gateway Yes Departure criteria Parking lot and entrance Yes Comments: Block frontage standard for this project is Mixed along Westland Road and Wellness Road and Gateway along East Valley Center. Two departures were requested. One for the extent of the parking lot along Westlake Road and the other for a public entrance to Westland Road. Departure meets criteria and both are recommended for approval due to the following findings: Phase I contains three frontages. Based on hierarchy, Gateway (Valley West) takes precedence over Mixed (Westland and Wellness). Appropriate landscape screening is provided to buffer the parking lot from the street. An employee entrance is provided to Westlake Road but is not publicly accessible. There are two other entrances, one from East Valley Center and one from Wellness Road and the entrance is visible from the street. 7b. Conformance with Article 5 – Project Design: Site Planning and Design Elements (38.520) Meets Code? Design and arrangement of the elements of the plan (e.g., buildings, circulation, open space and landscaping, etc.) so that activities are integrated with the organizational scheme of the community, neighborhood, and other approved development and produce an efficient, functionally organized and cohesive development Yes Relationship to adjacent properties 38.520.030 Yes Non-motorized circulation and design systems to enhance convenience and safety across parking lots and streets, including, but not limited to paving patterns, pathway design, landscaping and lighting 38.420.040 Yes Comments: There is proficient pedestrian circulation throughout the Phase I ambulatory center. Contrasting patterns are provided when a path crosses a drive aisle or parking lot, sidewalks range from 5’ to 10’ wide. The Master Site Plan identifies an array of pedestrian circulation throughout the site. Design of vehicular circulation systems to assure that vehicles can move safely and easily both within the site and between properties and activities within the general community 38.420.050 Yes Internal roadway design 38.520.050.D Yes Comments: In Phase I, there is an internal drive along the western portion that includes sidewalks and street trees. This drive will not connect to Westlake Road in Phase I, but will connect with a future phase when Westlake Road is improved. On-site open space 38.520.060 Total required 9500 SF Yes Total provided 20,500 SF Yes Comments: Open space is provided as large plazas and small seating areas. Location and design of service areas and mechanical equipment 38.520.070 Yes Comments: Roof mounted equipment is screened by parapets. Ground equipment is screened by landscaping and structures. 7c. Conformance with Article 5 – Project Design: Building Design (38.530) Meets Code? Compatibility with, and sensitivity to, the immediate environment of the site and the adjacent neighborhoods and other approved development 38.530.030 Yes Building massing and articulation 38.530.040 Yes Building details, materials, and blank wall treatments 38.530.050-070 Yes DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 17 of 18 7d. Conformance with Article 5 – Parking (38.540) Meets Code? Parking requirements residential 38.540.050.A.1 NA Yes Reductions residential 38.540.050.A.1.b NA Parking requirements nonresidential 38.540.050.A.2 390 Reductions nonresidential 38.540.050.A.2.c NA Provided off-street 400 Provided on-street 0 Bicycle parking 38.540.050.A.4 39 Yes Comments: 400 parking spaces are provided throughout Phase I. There are three separate parking lots. 42 bicycle parking spaces are provided Loading and uploading area requirements 38.540.080 Yes First berth – minimum 70 feet length, 12 feet in width, 14 feet in height Yes Additional berth – minimum 45 feet length NA Comments: There is a loading area on the north side of Phase I. It is screened from the public view and meets standards. 7e. Conformance with Article 5 – Landscaping (38.550) Meets Code? Mandatory landscaping requirements 38.550.050 Yes Yes Drought tolerant species 75% required Yes Parking lot landscaping Yes Additional screening Yes Street frontage Yes Street median island NA Acceptable landscape materials Yes Protection of landscape areas Yes Irrigation: plan, water source, system type Yes Residential adjacency Yes Comments: All landscaping meets requirements. Phase I is adjacent to a residential area to the west and is screened through landscaping and berming. There are substantial landscaping provided throughout the Phase I. The master site plan conceptually identifies landscaping throughout the overall development, but will be reviewed further with subsequent applications. Landscaping of public lands 38.550.070 NA Comments: No public lands are proposed with Phase I. Within the master site plan, there are identified public land areas that will be reviewed with subsequent site plan applications. 7f. Conformance with Article 5 – Signs (38.560) Meets Code? Allowed SF/building 38.560.060 400 SF NA Proposed SF/building NA NA Comments: No signage is proposed with the Phase I. A sign permit application will be required with any signage. A wayfinding plan will be required with future development of the overall site as it progresses. 7g. Conformance with Article 5 – Lighting (38.560) Meets Code? Site lighting (supports, cutoff, footcandles, temperature) 38.570.040 Yes Building-mounted lighting (supports, cutoff, footcandles, temperature) 38.570.040.B Yes Comments: The building is well articulated, utilizes durable materials, and promote regionally appropriate architecture to Bozeman’s building character. The entrances are articulated for the scale of the building. Any blank wall is landscaped. Building design for subsequent phases in the master site plan will be reviewed per application. DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A Staff Report Billings Clinic Master Site Plan & Site Plan Application 20213 & 20216 December 3, 2020 Page 18 of 18 Comments: Lighting for Phase I meets requirements. 8. Conformance with Article 6 – Natural Resource Protection Meets Code? Floodplain regulations 38.600 NA Wetland regulations 38.610 NA Comments: Phase I does not contain any floodplain or wetlands. There are identified wetlands on the western portion of the overall development that will require review when that area is development. 9. Relevant Comment from Affected Parties (38.220) Meets Code? Public Comment Yes Comments: Public comment was conducted. No comments were received. 10. Division of Land Pertaining to Subdivisions (38.240-Part 4) Meets Code? Subdivision exemptions NA Required easements NA Comments: There is no division of land proposed with the application. DocuSign Envelope ID: 1F467149-D300-4BFD-A31A-B48AC4F7143A