Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: David Fine, Urban Renewal Program Manager, Economic Development Department
SUBJECT: Professional Services Agreement with Economic and Planning Systems (EPS) for Urban Renewal Application Review for the 9TEN Mixed-Use Project MEETING DATE: December 8, 2020 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to Sign the Professional Services Agreement.
BACKGROUND: The City Commission adopted the Midtown Tax Increment Finance Assistance Program (Resolution 5087 – Midtown TIF Assistance Program). The program allows applicants to apply for financing to mitigate the cost of impacts fees, demolition, and off-site public infrastructure associated with redevelopment projects in the District. A major consideration in determining the appropriate level of assistance for a project is whether the project would be feasible without that assistance. Developers should expect to make an appropriate return based on the significant risk involved in real estate projects. Public redevelopment incentives should make projects feasible, not unduly enrich developers. To assist the City in making this determination, staff proposes hiring consultants with real estate and public incentive expertise to analyze independently the request for TIF Assistance in the context of the project pro forma and acceptable rates of return. While staff will not always request financial analysis at this level, the scale of the anticipated incentive request requires additional due diligence. The 9TEN mixed-use project is proposed as two four-story buildings on 8th Ave. between Aspen St and Juniper St. The project includes ground floor commercial space and nearly 100 residential units. The City Commission previously approved a contract for similar analysis for this project in 2019. Due to changes in construction costs, to the underlying project, as well as the fiscal structure of the project, it is necessary to undertake new analysis of the “but for” argument for any funding request.
63
FISCAL EFFECTS: The cost of the contract is not to exceed $5,000. Professional services funds allocated in the Midtown Urban Renewal District Fiscal Year 2021 Work Plan and Budget would cover the cost of this contract. The scope of this contract is the review of a single project. The incentive request for the 9TEN project will likely exceed $1,000,000 for public infrastructure and other eligible costs and may require the District to issue tax increment revenue bonds to support the project.
ATTACHMENTS: Professional Services Agreement with Economic and Planning Systems Scope of Services (Attachment “A”)
64
Professional Services Agreement for Aspen Street Pedestrian Bridge FY 2021
Page 1 of 11
PROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT is made and entered into this _____ day of ____________, 202__
(“Effective Date”), by and between the CITY OF BOZEMAN, MONTANA, a self-governing
municipal corporation organized and existing under its Charter and the laws of the State of Montana,
121 North Rouse Street, Bozeman, Montana, with a mailing address of PO Box 1230, Bozeman, MT
59771, hereinafter referred to as “City,” and, ECONOMIC AND PLANNING SYSTEMS, INC.,
730 17th Street, Suite 630, Denver, CO 80202, hereinafter referred to as “Contractor.” The City and
Contractor may be referred to individually as “Party” and collectively as “Parties.”
In consideration of the mutual covenants and agreements herein contained, the receipt and
sufficiency whereof being hereby acknowledged, the parties hereto agree as follows:
1. Purpose: City agrees to enter this Agreement with Contractor to perform for City
services described in the Scope of Services attached hereto as Exhibit A and by this reference made
a part hereof.
2. Term/Effective Date: This Agreement is effective upon the Effective Date, unless
earlier terminated in accordance with this Agreement.
3. Scope of Services: Contractor will perform the work and provide the services in
accordance with the requirements of the Scope of Services. For conflicts between this Agreement and
the Scope of Services, unless specifically provided otherwise, the Agreement governs.
4. Payment: City agrees to pay Contractor the amount specified in the Scope of
Services. Any alteration or deviation from the described services that involves additional costs above
the Agreement amount will be performed by Contractor after written request by the City, and will
become an additional charge over and above the amount listed in the Scope of Services. The City
must agree in writing upon any additional charges.
5. Contractor’s Representations: To induce City to enter into this Agreement,
Contractor makes the following representations:
a. Contractor has familiarized itself with the nature and extent of this Agreement, the
65
Professional Services Agreement for Aspen Street Pedestrian Bridge FY 2021
Page 2 of 11
Scope of Services, and with all local conditions and federal, state and local laws, ordinances, rules,
and regulations that in any manner may affect cost, progress or performance of the Scope of Services.
b. Contractor represents and warrants to City that it has the experience and ability to
perform the services required by this Agreement; that it will perform the services in a professional,
competent and timely manner and with diligence and skill; that it has the power to enter into and
perform this Agreement and grant the rights granted in it; and that its performance of this Agreement
shall not infringe upon or violate the rights of any third party, whether rights of copyright, trademark,
privacy, publicity, libel, slander or any other rights of any nature whatsoever, or violate any federal,
state and municipal laws. The City will not determine or exercise control as to general procedures or
formats necessary to have these services meet this warranty.
6. Independent Contractor Status/Labor Relations: The parties agree that Contractor
is an independent contractor for purposes of this Agreement and is not to be considered an employee
of the City for any purpose. Contractor is not subject to the terms and provisions of the City’s
personnel policies handbook and may not be considered a City employee for workers’ compensation
or any other purpose. Contractor is not authorized to represent the City or otherwise bind the City in
any dealings between Contractor and any third parties.
Contractor shall comply with the applicable requirements of the Workers’ Compensation Act,
Title 39, Chapter 71, Montana Code Annotated (MCA), and the Occupational Disease Act of
Montana, Title 39, Chapter 71, MCA. Contractor shall maintain workers’ compensation coverage for
all members and employees of Contractor’s business, except for those members who are exempted
by law.
Contractor shall furnish the City with copies showing one of the following: (1) a binder for
workers’ compensation coverage by an insurer licensed and authorized to provide workers’
compensation insurance in the State of Montana; or (2) proof of exemption from workers’
compensation granted by law for independent contractors.
In the event that, during the term of this Agreement, any labor problems or disputes of any
type arise or materialize which in turn cause any services to cease for any period of time, Contractor
specifically agrees to take immediate steps, at its own expense and without expectation of
reimbursement from City, to alleviate or resolve all such labor problems or disputes. The specific
steps Contractor shall take shall be left to the discretion of Contractor; provided, however, that
Contractor shall bear all costs of any related legal action. Contractor shall provide immediate relief
to the City so as to permit the services to continue at no additional cost to City.
66
Professional Services Agreement for Aspen Street Pedestrian Bridge FY 2021
Page 3 of 11
Contractor shall indemnify, defend, and hold the City harmless from any and all claims,
demands, costs, expenses, damages, and liabilities arising out of, resulting from, or occurring in
connection with any labor problems or disputes or any delays or stoppages of work associated with
such problems or disputes.
7. Indemnity/Waiver of Claims/Insurance: For other than professional services
rendered, to the fullest extent permitted by law, Contractor agrees to release, defend, indemnify, and
hold harmless the City, its agents, representatives, employees, and officers (collectively referred to
for purposes of this Section as the City) from and against any and all claims, demands, actions, fees
and costs (including attorney’s fees and the costs and fees of expert witness and consultants), losses,
expenses, liabilities (including liability where activity is inherently or intrinsically dangerous) or
damages of whatever kind or nature connected therewith and without limit and without regard to the
cause or causes thereof or the negligence of any party or parties that may be asserted against,
recovered from or suffered by the City occasioned by, growing or arising out of or resulting from or
in any way related to: (i) the negligent, reckless, or intentional misconduct of the Contractor; or (ii)
any negligent, reckless, or intentional misconduct of any of the Contractor’s agents.
For the professional services rendered, to the fullest extent permitted by law, Contractor
agrees to indemnify and hold the City harmless against claims, demands, suits, damages, losses, and
expenses, including reasonable defense attorney fees, to the extent caused by the negligence or
intentional misconduct of the Contractor or Contractor’s agents or employees.
Such obligations shall not be construed to negate, abridge, or reduce other rights or obligations
of indemnity that would otherwise exist. The indemnification obligations of this Section must not be
construed to negate, abridge, or reduce any common-law or statutory rights of the City as
indemnitee(s) which would otherwise exist as to such indemnitee(s).
Contractor’s indemnity under this Section shall be without regard to and without any right to
contribution from any insurance maintained by City.
Should the City be required to bring an action against the Contractor to assert its right to
defense or indemnification under this Agreement or under the Contractor’s applicable insurance
policies required below, the City shall be entitled to recover reasonable costs and attorney fees
incurred in asserting its right to indemnification or defense but only if a court of competent
jurisdiction determines the Contractor was obligated to defend the claim(s) or was obligated to
indemnify the City for a claim(s) or any portion(s) thereof.
In the event of an action filed against the City resulting from the City’s performance under
67
Professional Services Agreement for Aspen Street Pedestrian Bridge FY 2021
Page 4 of 11
this Agreement, the City may elect to represent itself and incur all costs and expenses of suit.
Contractor also waives any and all claims and recourse against the City, including the right of
contribution for loss or damage to person or property arising from, growing out of, or in any way
connected with or incident to the performance of this Agreement except “responsibility for [City’s]
own fraud, for willful injury to the person or property of another, or for violation of law, whether
willful or negligent” as per 28-2-702, MCA.
These obligations shall survive termination of this Agreement and the services performed
hereunder.
In addition to and independent from the above, Contractor shall at Contractor’s expense secure
insurance coverage through an insurance company or companies duly licensed and authorized to
conduct insurance business in Montana which insures the liabilities and obligations specifically
assumed by the Contractor in this Section. The insurance coverage shall not contain any exclusion
for liabilities specifically assumed by the Contractor in this Section.
The insurance shall cover and apply to all claims, demands, suits, damages, losses, and
expenses that may be asserted or claimed against, recovered from, or suffered by the City without
limit and without regard to the cause therefore and which is acceptable to the City. Contractor shall
furnish to the City an accompanying certificate of insurance and accompanying endorsements in
amounts not less than as follows:
• Workers’ Compensation – statutory;
• Employers’ Liability - $1,000,000 per occurrence; $2,000,000 annual aggregate;
• Commercial General Liability - $1,000,000 per occurrence; $2,000,000 annual
aggregate;
• Automobile Liability - $1,000,000 property damage/bodily injury per accident; and
• Professional Liability - $1,000,000 per claim; $2,000,000 annual aggregate.
The above amounts shall be exclusive of defense costs. The City shall be endorsed as an
additional or named insured on a primary non-contributory basis on both the Commercial General
and Automobile Liability policies. The insurance and required endorsements must be in a form
suitable to City and shall include no less than a thirty (30) day notice of cancellation or non-renewal.
Contractor shall notify City within two (2) business days of Contractor’s receipt of notice that any
required insurance coverage will be terminated or Contractor’s decision to terminate any required
insurance coverage for any reason.
68
Professional Services Agreement for Aspen Street Pedestrian Bridge FY 2021
Page 5 of 11
The City must approve all insurance coverage and endorsements prior to the Contractor
commencing work.
8. Termination for Contractor’s Fault:
a. If Contractor refuses or fails to timely do the work, or any part thereof, or fails
to perform any of its obligations under this Agreement, or otherwise breaches any terms or
conditions of this Agreement, the City may, by written notice, terminate this Agreement and
the Contractor’s right to proceed with all or any part of the work (“Termination Notice Due
to Contractor’s Fault”). The City may then take over the work and complete it, either with its
own resources or by re-letting the contract to any other third party.
b. In the event of a termination pursuant to this Section 8, Contractor shall be
entitled to payment only for those services Contractor actually rendered.
c. Any termination provided for by this Section 8 shall be in addition to any other
remedies to which the City may be entitled under the law or at equity.
d. In the event of termination under this Section 8, Contractor shall, under no
circumstances, be entitled to claim or recover consequential, special, punitive, lost business
opportunity, lost productivity, field office overhead, general conditions costs, or lost profits
damages of any nature arising, or claimed to have arisen, as a result of the termination.
9. Termination for City’s Convenience:
a. Should conditions arise which, in the sole opinion and discretion of the City,
make it advisable to the City to cease performance under this Agreement, the City may
terminate this Agreement by written notice to Contractor (“Notice of Termination for City’s
Convenience”). The termination shall be effective in the manner specified in the Notice of
Termination for City’s Convenience and shall be without prejudice to any claims that the City
may otherwise have against Contractor.
b. Upon receipt of the Notice of Termination for City’s Convenience, unless
otherwise directed in the Notice, the Contractor shall immediately cease performance under
this Agreement and make every reasonable effort to refrain from continuing work, incurring
additional expenses or costs under this Agreement and shall immediately cancel all existing
orders or contracts upon terms satisfactory to the City. Contractor shall do only such work as
may be necessary to preserve, protect, and maintain work already completed or immediately
69
Professional Services Agreement for Aspen Street Pedestrian Bridge FY 2021
Page 6 of 11
in progress.
c. In the event of a termination pursuant to this Section 9, Contractor is entitled
to payment only for those services Contractor actually rendered on or before the receipt of the
Notice of Termination for City’s Convenience.
d. The compensation described in Section 9(c) is the sole compensation due to
Contractor for its performance of this Agreement. Contractor shall, under no circumstances,
be entitled to claim or recover consequential, special, punitive, lost business opportunity, lost
productivity, field office overhead, general conditions costs, or lost profits damages of any
nature arising, or claimed to have arisen, as a result of the termination.
10. Limitation on Contractor’s Damages; Time for Asserting Claim:
a. In the event of a claim for damages by Contractor under this Agreement,
Contractor’s damages shall be limited to contract damages and Contractor hereby expressly
waives any right to claim or recover consequential, special, punitive, lost business
opportunity, lost productivity, field office overhead, general conditions costs, or lost profits
damages of any nature or kind.
b. In the event Contractor wants to assert a claim for damages of any kind or
nature, Contractor shall provide City with written notice of its claim, the facts and
circumstances surrounding and giving rise to the claim, and the total amount of damages
sought by the claim, within thirty (30) days of the facts and circumstances giving rise to the
claim. In the event Contractor fails to provide such notice, Contractor shall waive all rights
to assert such claim.
11. Representatives and Notices:
a. City’s Representative: The City’s Representative for the purpose of this
Agreement shall be David Fine, Urban Renewal Program Manager or such other individual
as City shall designate in writing. Whenever approval or authorization from or
communication or submission to City is required by this Agreement, such communication or
submission shall be directed to the City’s Representative and approvals or authorizations shall
be issued only by such Representative; provided, however, that in exigent circumstances when
City’s Representative is not available, Contractor may direct its communication or submission
to other designated City personnel or agents as designated by the City in writing and may
receive approvals or authorization from such persons.
70
Professional Services Agreement for Aspen Street Pedestrian Bridge FY 2021
Page 7 of 11
b. Contractor’s Representative: The Contractor’s Representative for the
purpose of this Agreement shall be _____________________ or such other individual as
Contractor shall designate in writing. Whenever direction to or communication with
Contractor is required by this Agreement, such direction or communication shall be directed
to Contractor’s Representative; provided, however, that in exigent circumstances when
Contractor’s Representative is not available, City may direct its direction or communication
to other designated Contractor personnel or agents.
c. Notices: All notices required by this Agreement shall be in writing and
shall be provided to the Representatives named in this Section. Notices shall be deemed given
when delivered, if delivered by courier to Party’s address shown above during normal business
hours of the recipient; or when sent, if sent by email or fax (with a successful transmission
report) to the email address or fax number provided by the Party’s Representative; or on the
fifth business day following mailing, if mailed by ordinary mail to the address shown above,
postage prepaid.
12. Permits: Contractor shall provide all notices, comply with all applicable laws,
ordinances, rules, and regulations, obtain all necessary permits, licenses, including a City of Bozeman
business license, and inspections from applicable governmental authorities, and pay all fees and
charges in connection therewith.
13 Laws and Regulations: Contractor shall comply fully with all applicable state and
federal laws, regulations, and municipal ordinances including, but not limited to, all workers’
compensation laws, all environmental laws including, but not limited to, the generation and disposal
of hazardous waste, the Occupational Safety and Health Act (OSHA), the safety rules, codes, and
provisions of the Montana Safety Act in Title 50, Chapter 71, MCA, all applicable City, County, and
State building and electrical codes, the Americans with Disabilities Act, and all non-discrimination,
affirmative action, and utilization of minority and small business statutes and regulations.
14. Nondiscrimination and Equal Pay: The Contractor agrees that all hiring by
Contractor of persons performing this Agreement shall be on the basis of merit and qualifications.
The Contractor will have a policy to provide equal employment opportunity in accordance with all
applicable state and federal anti-discrimination laws, regulations, and contracts. The Contractor will
not refuse employment to a person, bar a person from employment, or discriminate against a person
in compensation or in a term, condition, or privilege of employment because of race, color, religion,
creed, political ideas, sex, age, marital status, national origin, actual or perceived sexual orientation,
gender identity, physical or mental disability, except when the reasonable demands of the position
71
Professional Services Agreement for Aspen Street Pedestrian Bridge FY 2021
Page 8 of 11
require an age, physical or mental disability, marital status or sex distinction. The Contractor shall
be subject to and comply with Title VI of the Civil Rights Act of 1964; Section 140, Title 2, United
States Code, and all regulations promulgated thereunder.
Contractor represents it is, and for the term of this Agreement will be, in compliance with the
requirements of the Equal Pay Act of 1963 and Section 39-3-104, MCA (the Montana Equal Pay Act).
Contractor must report to the City any violations of the Montana Equal Pay Act that Contractor has
been found guilty of within 60 days of such finding for violations occurring during the term of this
Agreement.
Contractor shall require these nondiscrimination terms of its subcontractors providing services
under this Agreement.
15. Intoxicants; DOT Drug and Alcohol Regulations/Safety and Training: Contractor
shall not permit or suffer the introduction or use of any intoxicants, including alcohol or illegal drugs,
by any employee or agent engaged in services to the City under this Agreement while on City property
or in the performance of any activities under this Agreement. Contractor acknowledges it is aware of
and shall comply with its responsibilities and obligations under the U.S. Department of Transportation
(DOT) regulations governing anti-drug and alcohol misuse prevention plans and related testing. City
shall have the right to request proof of such compliance and Contractor shall be obligated to furnish
such proof.
The Contractor shall be responsible for instructing and training the Contractor's employees
and agents in proper and specified work methods and procedures. The Contractor shall provide
continuous inspection and supervision of the work performed. The Contractor is responsible for
instructing its employees and agents in safe work practices.
16. Modification and Assignability: This Agreement may not be enlarged, modified or
altered except by written agreement signed by both parties hereto. The Contractor may not
subcontract or assign Contractor’s rights, including the right to compensation or duties arising
hereunder, without the prior written consent of the City. Any subcontractor or assignee will be bound
by all of the terms and conditions of this Agreement.
17. Reports/Accountability/Public Information: Contractor agrees to develop and/or
provide documentation as requested by the City demonstrating Contractor’s compliance with the
requirements of this Agreement. Contractor shall allow the City, its auditors, and other persons
authorized by the City to inspect and copy its books and records for the purpose of verifying that the
reimbursement of monies distributed to Contractor pursuant to this Agreement was used in
72
Professional Services Agreement for Aspen Street Pedestrian Bridge FY 2021
Page 9 of 11
compliance with this Agreement and all applicable provisions of federal, state, and local law. The
Contractor shall not issue any statements, releases or information for public dissemination without
prior approval of the City.
18. Non-Waiver: A waiver by either party of any default or breach by the other party of
any terms or conditions of this Agreement does not limit the other party’s right to enforce such term
or conditions or to pursue any available legal or equitable rights in the event of any subsequent default
or breach.
19. Attorney’s Fees and Costs: In the event it becomes necessary for either Party to
retain an attorney to enforce any of the terms or conditions of this Agreement or to give any notice
required herein, then the prevailing Party or the Party giving notice shall be entitled to reasonable
attorney's fees and costs, including fees, salary, and costs of in-house counsel including the City
Attorney’s Office staff.
20. Taxes: Contractor is obligated to pay all taxes of any kind or nature and make all
appropriate employee withholdings.
21. Dispute Resolution:
a. Any claim, controversy, or dispute between the parties, their agents,
employees, or representatives shall be resolved first by negotiation between senior-level
personnel from each party duly authorized to execute settlement agreements. Upon mutual
agreement of the parties, the parties may invite an independent, disinterested mediator to assist
in the negotiated settlement discussions.
b. If the parties are unable to resolve the dispute within thirty (30) days from the
date the dispute was first raised, then such dispute may only be resolved in a court of
competent jurisdiction in compliance with the Applicable Law provisions of this Agreement.
22. Survival: Contractor’s indemnification shall survive the termination or expiration of
this Agreement for the maximum period allowed under applicable law.
23. Headings: The headings used in this Agreement are for convenience only and are not
be construed as a part of the Agreement or as a limitation on the scope of the particular paragraphs to
which they refer.
24. Severability: If any portion of this Agreement is held to be void or unenforceable, the
73
Professional Services Agreement for Aspen Street Pedestrian Bridge FY 2021
Page 10 of 11
balance thereof shall continue in effect.
25. Applicable Law: The parties agree that this Agreement is governed in all respects by
the laws of the State of Montana.
26. Binding Effect: This Agreement is binding upon and inures to the benefit of the heirs,
legal representatives, successors, and assigns of the parties.
27. No Third-Party Beneficiary: This Agreement is for the exclusive benefit of the
parties, does not constitute a third-party beneficiary agreement, and may not be relied upon or
enforced by a third party.
28. Counterparts: This Agreement may be executed in counterparts, which together
constitute one instrument.
29. Integration: This Agreement and all Exhibits attached hereto constitute the entire
agreement of the parties. Covenants or representations not contained herein or made a part thereof
by reference, are not binding upon the parties. There are no understandings between the parties other
than as set forth in this Agreement. All communications, either verbal or written, made prior to the
date of this Agreement are hereby abrogated and withdrawn unless specifically made a part of this
Agreement by reference.
30. Consent to Electronic Signatures: The Parties have consented to execute this
Agreement electronically in conformance with the Montana Uniform Electronic Transactions Act,
Title 30, Chapter 18, Part 1, MCA.
**** END OF AGREEMENT EXCEPT FOR SIGNATURES ****
74
Professional Services Agreement for Aspen Street Pedestrian Bridge FY 2021
Page 11 of 11
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and
year first above written or as recorded in an electronic signature.
CITY OF BOZEMAN, MONTANA ____________________________________
CONTRACTOR (Type Name Above)
By________________________________ By__________________________________
Jeff Mihelich, City Manager
Print Name: ___________________________
Print Title: ____________________________
APPROVED AS TO FORM:
By_______________________________
Greg Sullivan, Bozeman City Attorney
75
November 19, 2020
David Fine
Economic Development Specialist
City of Bozeman
121 North Rouse Avenue
Bozeman, MT 59771
Subject: Urban Renewal TIF Application Review – 9TEN (802-910
North 8th Avenue)
Dear David:
Thank you for requesting a proposal from Economic & Planning Systems
(EPS) to conduct a financial review of the proposed 9TEN development’s
application for tax increment financing. This scope of work includes a
financial analysis of the project’s performance with and without TIF
assistance, which is a consideration in the Board’s determination to
award TIF from the Midtown Urban Renewal District.
Scope of Work
Task 1: Project Initiation
EPS will organize a conference call with City and/or URA staff to discuss
key objectives, issues, and the development program.
Task 2: Project Feasibility Model
EPS will request through the City a financial pro forma of the project
from the developer. Using the developer’s pro forma as a starting place,
EPS will produce an independent financial pro forma to determine the
feasibility of the project with and without the TIF investment. The
purpose of this task is to ensure that estimates of project gap submitted
by the developer are technically accurate and represent appropriate and
realistic market inputs. Model inputs will be based on a review of local
market conditions, conversations with City staff, and supplemental
research as needed. At a minimum, EPS will run two versions of the
model that will include the following:
• Baseline Scenario – The Baseline Scenario will reflect assumptions
and estimates provided by the developer and will be used to ensure
that there are not technical model inaccuracies in the developer’s
request for TIF. This model will also be used to determine a baseline
from which to test alternative assumptions.
76
West Peach Condos TIF Application Review
March 21, 2019
Page 2
Bozeman 910 Feasibility Analysis.docx
• Alternative Scenario(s) – Based on EPS’ review of the project assumptions and developer’s
pro forma, along with discussions with the City, EPS may develop one to two alternative
scenarios that reflect any potential revisions to key model inputs. The results of this model
will be used to estimate potential project funding gaps and determine project sensitivities to
various model inputs, such as construction costs, sales prices, discount rates, and others.
This analysis will help the City determine if the level of TIF is appropriate or if there are
excess returns generated in the project, potentially justifying a lower amount of public
investment through TIF.
Task 3: Summary Memorandum
EPS will summarize the analysis described in this scope of work in a brief technical memorandum
that will be submitted to City staff. This memo will include an overview of the general
methodology to estimate the need for public financing, a summary of the initial assumptions
used by the development team, any changes that are recommended by EPS, and the final
estimated public financing that the project requires in order to achieve acceptable levels of
return.
Budget and Agreement
The scope of work outlined above reflects the tasks necessary to evaluate an individual project.
If needed, additional project can be evaluated using a comparable scope of work and
corresponding budget.
EPS agrees to complete the above work program on a time and materials basis up to a maximum
of $5,000. The estimated budget accounts for approximately 25 to 30 hours of EPS staff time.
Based on the anticipated staffing for this project, average billing rates are estimated at $180 per
hour.
If this proposal is acceptable to you, it can serve as a contract between us by signing two
copies and returning one. If there are any comments or questions you have, please call us at
(303) 623-3557. We look forward to working with you and the rest of your team.
Sincerely,
ECONOMIC & PLANNING SYSTEMS, INC.
Brian Duffany
Executive Vice President
Accepted:
__________________________________________________ _______________
by David Fine, Economic Development Specialist, City of Bozeman Date