HomeMy WebLinkAbout12-01-20 City Commission Packet Materials - A1. Norton Ranch Phase 5 Preliminary Plat
Commission Memorandum
REPORT TO: Mayor and City Commission FROM: Sarah Rosenberg, AICP, Associate Planner SUBJECT: Norton Ranch Phase 5 Major Subdivision Application 18278 MEETING DATE: December 1, 2020
AGENDA ITEM TYPE: Action (Quasi Judicial)
RECOMMENDATION: The application conforms to standards and is sufficient for approval
with conditions and code provisions.
STRATEGIC PLAN: Vision Statement: 4. A Well-Planned City. We consistently improve our community’s quality of life as it grows and changes, honoring our sense of place and the ‘Bozeman feel’ as we plan for a livable, affordable, more connected city. 4.2 High Quality Urban Approach. Continue to support high quality planning, ranging from building design to
neighborhood layouts, while pursuing urban approaches to issues such as multimodal transportation, infill, density, connected trails and parks, and walkable neighborhoods.4.3 Strategic Infrastructure Choices. Prioritize long-term investment and maintenance for existing and new infrastructure.
BACKGROUND: The applicant, Norton Properties LLC is proposing to subdivide 79.3 acres in
order to create 148 lots: 124 residential single household, 14 affordable single household detached lots, 5 common open space lots, 5 City park lots, 4 restricted development lots, and dedicated right of ways. The developable portion of the project is 38 acres while the 4 restricted lots are roughly 41 acres. The developable portion of the project borders West Babcock to the south, Laurel Parkway to the east, Vaughn Drive to the north, and South Eldorado Avenue to the
west. The four restricted lots, east of Laurel Parkway, are subject to further subdivision review.
The Planning Board held a public hearing on the application on November 16, 2020. The Planning Board is the advisory body to the City Commission on this subdivision application. The Planning Board amended the motion to remove code provision number four to allow Laurel Parkway to be constructed in two phases. The amended motion was passed 6:0. No public
comment was received. The Planning Board proceedings may be viewed here under the date November 16, 2020: https://media.avcaptureall.com/session.html?sessionid=d506ca4c-e3f2-407d-9cfa-1bdaf9d33b20&prefilter=654,3835
The final decision for a Major Subdivision Preliminary Plat with less than 50 lots must be made within 60 working days of the date it was deemed adequate. The Development Review
Committee (DRC) deemed the application adequate for continued review on October 29, 2020. Pursuant to BMC 38.240.130 the city commission shall approve, conditionally approve or deny the subdivision application by December 29, 2020, unless there is a written extension from the developer, not to exceed one year.
No public comment has been received.
100
Commission Memorandum
UNRESOLVED ISSUES: The phasing plan for subdivision does not comply with code requirements. The proposed construction of Laurel Parkway in two phases does not comply with
the requirements in Bozeman Municipal Code (BMC) Section 38.400.010.A.2, which requires the developer must arrange the streets to provide for the continuation of streets between adjacent developed properties when such a continuation is necessary for the effective provision of emergency services and efficient provision of utilities. Nor does it comply with the City’s Growth Policy (both 2009 and 2020 version) and the 2017 Transportation Master Plan. The
applicant has not changed the proposed phasing plan to comply with the requirement and this report includes a recommendation that requires the phasing plan to be revised to comply with code requirements prior to final plat approval.
ALTERNATIVES: 1. Approve the application with the recommended conditions;
2. Approve the application with modifications to the recommended conditions;
3. Deny the application based on the Commission’s findings of non-compliance with the
applicable criteria contained within the staff report; or
4. Open and continue the public hearing on the application, with specific direction to staff or the
applicant to supply additional information or to address specific items.
FISCAL EFFECTS: Fiscal impacts are undetermined at this time, but will include increased
property tax revenues from new development, along with increased costs to deliver municipal
services to the property. Impact fees will be collected at the time of issuance of building permits for individual developments along with City sewer and water connection fees.
Attachment: Staff Report Application Report compiled on: November 20, 2020
101
Page 1 of 29
18278, City Commission Staff Report for the Norton Ranch Ph 5
Subdivision
Public Hearing Date: Planning Board, November 16, 2020 at 6:00 pm. Via WebEx.
City Commission, December 1, 2020 at 6:00pm. Via WebEx.
Project Description: A Preliminary Plat application for a proposed 79.3 acres to create
148 lots: 124 residential single household, 14 affordable single household
detached lots, 5 common open space lots 5 city park lots, 4 restricted lots and
dedicated right of way. The subject property is zoned R-2, R-3, and R-4.
Project Location: The subject parcel is located north and west of the intersection of
West Babcock Street and Laurel Parkway. It is legally described as Lot R1,
Norton East Ranch Subdivision Phase 3A, SEC. 9, T. 2 S., R. 5, City of
Bozeman, Gallatin County, Montana.
Recommendation: Approval with conditions and code requirements
Preliminary Plat Recommended Motion: Having reviewed and considered the
application materials, public comment, and all the information presented, I hereby
adopt the findings presented in the staff report for application 18278 and move to
recommend approval of the subdivision with conditions and subject to all
applicable code provisions.
Report Date: November 19, 2020
Staff Contact: Sarah Rosenberg, Associate Planner
Griffin Nielsen, Engineer
Agenda Item Type: Action (Quasi-judicial)
EXECUTIVE SUMMARY
Unresolved Issues
The phasing plan for subdivision does not comply with code requirements. The
proposed construction of Laurel Parkway in two phases does not comply with the
requirements in Bozeman Municipal Code (BMC) Section 38.400.010.A.2, which
requires the developer must arrange the streets to provide for the continuation of streets
between adjacent developed properties when such a continuation is necessary for the
effective provision of emergency services and efficient provision of utilities. Nor does it
comply with the City’s Growth Policy (both 2009 and 2020 version) and the 2017
Transportation Master Plan. The applicant has not changed the proposed phasing plan
102
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 2 of 29
to comply with the requirement and this report includes a recommendation that requires
the phasing plan to be revised to comply with code requirements prior to final plat
approval. A further analysis and findings is provided in a separate memo from the
Engineering Division on this issue.
Project Summary
The applicant, Norton Properties LLC is proposing to subdivide 79.3 acres in order to
create 148 lots: 124 residential single household, 14 affordable single household
detached lots, 5 common open space lots, 5 City park lots, 4 restricted development
lots, and dedicated right of ways. The developable portion of the project is 38 acres
while the 4 restricted lots are roughly 41 acres. The developable portion of the project
borders West Babcock to the south, Laurel Parkway to the east, Vaughn Drive to the
north, and South Eldorado Avenue to the west. The four restricted lots, east of Laurel
Parkway, are subject to further subdivision review.
The applicant has decided that Phase 5 of Norton Ranch will also include four restricted
lots east of Laurel Parkway. Those lots are subject to further subdivision. Phase 5 which
will be developed in four total phases includes Laurel Parkway and everything west of it.
New conditions have been added to the staff report since the Planning Board based on
the applicant’s proposal of their phasing plan. See condition number 33.
The subdivision’s first phase will start with Phases 5A which includes all 14 affordable
housing lots. These affordable housing lots are expected to be detached 3-bedroom
lower priced homes (10% of the total of 70% AMI). Although all 14 lots are along
Boomtown Road and clustered together, it was deemed an appropriate layout based on
lot size, design placement and the fact that the City receives affordable housing lots that
are oriented onto the street in the first phase of development.
The developer is proposing single family detached throughout this phase, however,
many of the lots within the subdivision can accommodate for different types of housing
that are allowed in the R-2 and R-3 zone district based on lot size requirements.
A large City park is set to be constructed with Phase 5D that contains wetlands which
are planned to be preserved and additional plantings provided to keep its natural
habitat. A trail along the west side of the development is proposed to connect to the
existing trails from Norton Ranch Subdivision Phase 3 to the south to Lakes at Valley
West to the north. This trail through linear park 5C and 5d initially was proposed to be
constructed in two phases. However, at the Planning Board meeting on Monday,
November 16, the board stressed to the applicant that the trail on the western portion of
the development through linear park 5C and 5D should be completed with the first
phase of development. The applicant has agreed to construct the linear park and the
trails with Phase 5A as outlined in condition number 34.
103
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 3 of 29
In addition of speaking to the trail phasing at the Planning Board meeting, the board
commented on desiring to see a diversity of housing in the development and the
unresolved issue of the construction of Laurel Parkway. The Planning board highly
recommend to the applicant that they provide a diversity of housing beyond just single
family detached houses. The applicant responded that as a whole, Norton Ranch
provides a diversity of housing that includes townhomes/rowhomes and multifamily
development. The R-4 zone district to the west of Laurel and the lots along Huffine are
expected to provide higher density housing.
The applicant spoke to the Planning Board in regards to the unresolved issue of the
phasing of Laurel Parkway arguing that the transportation impact study determined that
the houses built in Phase 5A can be serviced by the portion of Laurel Parkway. They
also included that all affordable housing lots are provided in Phase 5a and the additional
costs of building the entirety of Laurel Parkway puts a burden on them. Hearing this, the
Planning Board amended the motion to remove code provision number 4 to allow Laurel
Parkway be constructed in two phases based on the phasing plan that was provided by
the applicant. The Planning Board approved this motion 6:0. A full recording of the
meeting can be reviewed at the following link:
https://media.avcaptureall.com/session.html?sessionid=d506ca4c-e3f2-407d-9cfa-
1bdaf9d33b20&prefilter=654,3835
From to this amendment in the motion, the Engineering Division has provided additional
findings for requiring Laurel Parkway to be constructed in one phase. See attached
memo.
The City of Bozeman Department of Community Development received a preliminary
plat application on July 3, 2018, requesting a major subdivision. The project was
deemed inadequate for review and review halted until revised materials were provided.
The City of Bozeman didn’t receive a second submittal until September 24, 2019. At this
time with new information provided and a new phasing plan proposed, there were major
concerns from the City involving wetlands, transportation, road layout, and phasing. The
applicant and the City continued to work through these issues in the April 24, 2020,
August 5, 2020, September 25, 2020, and October 16, 2020 submittals. The application
was deemed adequate on October 29, 2020 with the unresolved issue of the phasing on
the construction of Laurel Parkway.
The final decision for a Major Subdivision must be made within 60 working days of the
date it was deemed adequate, or in this case, by December 28, 2020. The City
Commission is scheduled to review the preliminary plat and make a decision at their
December 1, 2020 public hearing.
Alternatives
1. Recommend approval of the application with the recommended conditions;
104
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 4 of 29
2. Recommend approval the application with modifications to the recommended
conditions;
3. Recommend denial of the application based on the Board’s findings of non-
compliance with the applicable criteria contained within the staff report; or
4. Open and continue the public hearing on the application, with specific direction to
staff or the applicant to supply additional information or to address specific items.
TABLE OF CONTENTS
EXECUTIVE SUMMARY ................................................................................................. 1
Unresolved Issues ................................................................................................ 1
Project Summary .................................................................................................. 1
Alternatives ........................................................................................................... 3
SECTION 1 - MAP SERIES ............................................................................................ 5
SECTION 2 - RECOMMENDED CONDITIONS OF APPROVAL .................................... 8
SECTION 3 - CODE REQUIREMENTS REQUIRING PLAT CORRECTIONS ............. 14
SECTION 4 - RECOMMENDATIONS AND FUTURE ACTIONS .................................. 18
SECTION 5 - STAFF ANALYSIS AND FINDINGS ........................................................ 18
Applicable Subdivision Review Criteria, Section 38.240.130, BMC. ................... 18
Primary Subdivision Review Criteria, Section 76-3-608 ..................................... 20
Preliminary Plat Supplements............................................................................. 24
APPENDIX A –PROJECT SITE ZONING AND GROWTH POLICY ............................. 27
APPENDIX B – NOTICING AND PUBLIC COMMENT ................................................ 28
APPENDIX C - OWNER INFORMATION ...................................................................... 28
FISCAL EFFECTS ........................................................................................................ 29
ATTACHMENTS ........................................................................................................... 29
105
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 5 of 29
SECTION 1 - MAP SERIES
Zoning Map of Subject Property
106
Page 6 of 29
Plat of overall development
107
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 7 of 29
Area of subdivision that is being developed
108
Page 8 of 29
SECTION 2 - RECOMMENDED CONDITIONS OF APPROVAL
Please note that these conditions are in addition to any required code provisions
identified in this report. This application proposes phases. Unless a condition is specific
to an individual phase, all comments and code requirements apply to any final plat of all
phases.
Recommended Conditions of Approval:
1. The applicant is advised that unmet code provisions, or code provisions that
are not specifically listed as conditions of approval, does not, in any way,
create a waiver or other relaxation of the lawful requirements of the Bozeman
Municipal Code or state law.
2. The plat shall conform to all requirements of the Bozeman Municipal Code
and the Uniform Standards for Subdivision Plats (Uniform Standards for
Certificates of Survey and Subdivision Plats 24.183.1104 ARM) and shall be
accompanied by all required documents, including certification from the City
Engineer that as-built drawings for public improvements were received, a
platting certificate, and all required and corrected certificates. The Final Plat
application shall include three (3) signed reproducible copies on a 3 mil or
heavier stable base polyester film (or equivalent); two (2) digital copies; one
(1) PDF copy; and five (5) paper prints. The Gallatin County Clerk &
Recorder’s office has elected to continue the existing medium requirements of
2 mylars with a 1½” binding margin on one side for both plats and COS’s.
The Clerk and Recorder will file the new Conditions of Approval sheet as the
last same sized mylar sheet in the plat set.
3. The final plat must provide all necessary utility easements and must be
described, dimensioned and shown on each subdivision block of the final plat
in their true and correct location.
4. Any public access easement for the common open spaces must be provided
as a separate document describing the scope of the grant of easement and
naming a custodian of the public’s interest in the easement.
5. Per BMC Section 38.220.070.A.2, prior to final plat approval, a memorandum
of understanding must be entered into by the weed control district and the
developer. The memorandum of understanding must be signed by the county
weed control district and the developer prior to final plat approval, and a copy
of the signed document must be submitted to the community development
department with the application for final plat approval.
6. This notation must be included on the conditions of approval sheet of the final
plat: “Ownership of all common open space areas and trails, and
109
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 9 of 29
responsibility of maintenance thereof and for city assessments levied on the
common open space lands shall be that of the property owners’ association.
Maintenance responsibility shall include, in addition to the common open
space and trails, all vegetative ground cover, boulevard trees and irrigation
systems in the public right-of-way boulevard strips along all external perimeter
development streets and as adjacent to public parks or other common open
space areas. All areas within the subdivision that are designated herein as
common open space including trails are for the use and enjoyment by
residents of the development and the general public. The property owners’
association shall be responsible for levying annual assessments to provide for
the maintenance, repair, and upkeep of all common open space areas and
trails. At the same time of recording the final plat of the subdivision the
subdivider shall transfer ownership of all common open space areas within
each phase to the property owners’ association created by the subdivider to
maintain all common open space areas within Norton Ranch Phase 5
subdivision.”
7. Extension of the preliminary plat approval will not be granted if the preliminary
plat approval has expired, per BMC 38.240.130.A.5.f. To obtain an extension
of the preliminary plat approval, the intersection of Laurel Parkway and Durston
Road must either be upgraded with a signal or roundabout with design
approved the City’s Engineering Division, or the applicant must provide an
updated traffic impact study at the time of extension request indicating the
intersection level-of-service standards can be met per BMC 38.400.060.B.4.
8. BMC 38.400.070. Subdivision lighting special improvement lighting district
(SILD) information shall be submitted to the City and the district formed after
preliminary plat approval in hard copy and digital form. Any final plat
application will not be deemed complete until the resolution to create the SILD
has been approved by the City Commission. The initial adoption of the special
improvement lighting district shall include the entire area of the preliminary
plat.
9. Per Code Section 38.350.060 fences located in the rear or side setback of
properties adjoining any city linear park must have a maximum height of four
feet. This must be added as a note listed on the conditions of approval sheet
of the plat. Properties on Block 21, Lot 2-8 AND Block 27, lots 1 and 2 are
affected by this code requirement.
10. Codes, Covenants & Restrictions must be updated for Phase 5 and submitted
with initial final plat to be recorded after approval.
11. The applicant must include a note on the conditions of approval sheet of the
final plat that states that maintenance of all stormwater facilities, including
110
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 10 of 29
stormwater facilities within the park parcel, is the responsibility of the property
owners’ association (POA).
12. The approved affordable housing plan must be recorded concurrent with the
final plat and a reference to the recorded document must be provided on the
conditions of approval page of the final plat. The reference on the conditions
of approval sheet must be “This subdivision is subject to affordable housing
requirements. The subdivision’s requirements and obligations can be found in
the Norton East Ranch, Phase 5 Affordable Housing Plan recorded as
document no.___________ at the Gallatin County Clerk and Recorders
Office.”
13. BMC 38.420.022.D. Park easements provided for future phases do not
transfer maintenance responsibilities to the Parks Department. The Parks
Department will assume maintenance responsibility upon future phase build
out and final acceptance of improvements. A note indicating this should be
placed on the conditions of approval sheet of the final plat.
14. BMC 38.220.070.A.6.g. Prior to final plat for subsequent phases, parkland
compliance per each sub phase of Phase 5 must also be shown in the
Parkland Tracking Table as required in Section 38.420.020 BMC and be
placed on the conditions of approval sheet of the final plat. On page
Preliminary Plat page 3 and Park Plan L100, consolidate the Parkland
tracking table displaying the same phase and zoning district lot sizes together
in one row. Add a row with details about when the Park Master Plan was
approved and a row that gives the total cost of improvements being
constructed. If an improvements agreement will be requested, please indicate
that within the table. The table shall explicitly state how much parkland credit
was allocated for each lot within this phase. This table shall include but not be
limited to listing all dedicated parkland requirements, parkland or parkland
credits and areas not credited towards parkland (i.e., detention/retention
areas, watercourse setbacks, wetlands, common open space, parking
facilities) and the total area of each.
15. BMC 38.220.070.A.7. Ensure that a conservation easement within the City
park parcel is transferred to the City of Bozeman with the final plat.
16. BMC 38.220.020 & 38.610.050. Prior to final plat of phases 5C and 5D, the
applicant must provide the Community Development Department with a
written statement of a wetland boundary determination from the U.S. Army
Corps of the wetland status. If the wetlands are determined to be
jurisdictional, a 404 permit must be submitted to the Community Development
office prior to final plat approval.
111
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 11 of 29
17. If not already filed, the applicant must provide and file with the County Clerk
and Recorder's office executed Waivers of Right to Protest Creation of
Special Improvement Districts (SID’s) for the following:
a. Street improvements to Cottonwood Road including paving,
curb/gutter, sidewalk, and storm drainage;
b. Street improvements to Laurel Parkway including paving, curb/gutter,
sidewalk, and storm drainage;
c. Street improvements to West Babcock including paving, curb/gutter,
sidewalk, and storm drainage;
d. Street improvements to Durston Road including paving, curb/gutter,
sidewalk, and storm drainage;
e. Street improvements to Gooch Hill Road including paving, curb/gutter,
sidewalk, and storm drainage;
f. Intersection improvements to Laurel Parkway and Durston;
g. Intersection improvements to Laurel Parkway and West Babcock
Street;
h. Intersection improvements to Laurel Parkway and Huffine Lane;
i. Intersection improvements to Cottonwood Road and Huffine Lane; and
j. Intersection improvements to Cottonwood Road and West Babcock
Street.
The document filed must specify that in the event an SID is not utilized for the
completion of these improvements, the developer agrees to participate in an
alternate financing method for the completion of these improvements on a fair
share, proportionate basis as determined by square footage of property,
taxable valuation of the property, traffic contribution from the development, or
a combination thereof. The applicant must provide a copy of the filed SID
waiver prior to final plat approval.
18. A 1 foot “No Access” strip shall be placed along the West Babcock frontage
for the full length of the development.
19. A 1 foot “No Access” strip shall be placed along the Laurel Parkway frontage
Block 16 of the development.
20. A 1 foot “No Access” strip shall be placed along the Gooseberry Drive
frontage of Lot 11 Block 22 of the development.
21. The applicant must include a note on the plat as follows, “This is a known
area of high groundwater. No crawl spaces or basements may be
constructed. Sump pumps are not allowed to be connected to the sanitary
sewer system. Sump pumps are not allowed to be connected to the drainage
system. Water from sump pumps may not be discharged onto streets, or into
112
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 12 of 29
the curb and gutters where they create a safety hazard for pedestrians and
vehicles.”
22. The subject property is located in an area with high groundwater with
potentially corrosive soils, which can increase the likelihood of water main
failure over the lifespan of the asset. The applicant must perform a corrosivity
analysis to determine if cathodic protection is required for the proposed
distribution mains.
23. The applicant must add a note to the conditions of approval sheet of the plat
that all stormwater infrastructure located outside of the public right-of-way
must be maintained by the property owners’ association (POA).
24. The applicant must provide a drain tile maintenance plan for the existing tile
drain along Fallon Street to the City Engineering Division for approval and
include the maintenance plan in the POA documents prior to final plat
approval. The plan must include the long term maintenance instructions for
the POA and an exhibit clearly showing the location and detail for the tile
drain.
25. BMC 38.220.060.A.1. Street names must be reviewed and approved by the
County’s geographic information systems and City Engineering Department
prior to final plat approval. The applicant must submit written approval from
both entities with the final plat application.
26. The stormwater design assumes a flow rate from the infiltration of
groundwater water. No data has been provided to justify this flow rate. Prior to
completion and acceptance of the stormwater infiltration of the flow rate must
be verified during the period of seasonal high groundwater. If the flow rate
exceeds the assumed value, the system must be altered to ensure all City
drainage standards are met. Verification may not take place while dewatering
is in operation. The applicant must send verification to the Community
Development Office before final plat approval.
27. The applicant must submit plans and specifications for water and sewer main
extensions, streets, and storm water improvements, prepared and signed by
a professional engineer (PE) registered in the State of Montana, which must
be provided to and approved by the City Engineer. Water and sewer plans
must also be approved by the Montana Department of Environmental Quality.
The applicant must also provide professional engineering services for
construction inspection, post-construction certification, and preparation of
mylar record drawings. Construction shall not be initiated on the public
infrastructure improvements until the plans and specifications have been
approved and a preconstruction conference has been conducted. Building
113
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 13 of 29
permits will not be issued prior to City acceptance of the infrastructure
improvements per BMC Section 38.270.030.B.
28. The applicant must contact the Gallatin County Conservation District,
Montana Department of Environmental Quality, and U.S. Army Corps of
Engineers regarding the proposed project and any required permits (i.e., 310,
404, Turbidity exemption, etc.) must be obtained by the applicant.
29. The complete right-of-way for Laurel Parkway from West Babcock to the
existing northern section must be dedicated with the first phase of the
subdivision.
30. A temporary stormwater easement must be provided for the stormwater pond
supporting Laurel Parkway. The easement language must be approved by the
City of Bozeman and dedicated with the final plat.
31. A minimum of a 12 foot all weather access ramp design to support
maintenance vehicles must be constructed to the stormwater pond at the
northwest corner of the site. The access must be reviewed and approved with
the subdivision infrastructure plans.
32. A sixty foot Public Street and Utility Easements must be provided on Lots R1A, R1B, R1C, and R1D. The easement must be center on the lot lines.
These easements must be provided at final plat with a separate document which contains the City’s standard language. Upon future subdivision of Lots R1A-R1D, the easement may to be revised to ensure compliance with the City’s street and block length standards.
33. A lot restriction note for Lots R1A, R1B, R1C, and R1D must be provided on
the final plat that states the following: Notice is hereby given to all potential
purchasers of Lots R1A, R1B, R1C, and R1D of the Norton Ranch Phase 5 Subdivision, City of Bozeman, Gallatin County Montana, that the final plat of the subdivision was approved by the Bozeman City Commission without completion of on and off-site improvements required under the Bozeman
Municipal Code as is allowed in Article 38.270.030. As such, the restriction is
filed with the final plat that stipulates that any use of these lots is subject to further subdivision or zoning development review and no development of these lots shall occur until all on and off-site improvements are completed as required under the BMC. Therefore, be advised that building permits will not
be issued for Lots R1A, R1B, R1C, and R1D of the Norton Ranch Phase 5
Subdivision until all required on and off-site improvements are completed and accepted by the City of Bozeman. No building or structures requiring water or sewer facilities shall be utilized on these lots until this restricted is lifted. This restriction runs with the land and is revocable only by further subdivision or
the written consent of the City of Bozeman.
34. Linear Park 5C and 5D and all improvements within it must be completed with Phase 5A.
114
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 14 of 29
SECTION 3 – REQUIRED CODE PROVISIONS
1. BMC 38.220.300 and 310. The property owners’ association (POA)
documents must be finalized and recorded with the initial final plat of the
entire property. The POA documents must include the requirements of
Section 38.220.300 and 320.
2. BMC 38.220.070.A.8 Final plat review. The applicant must submit with the
application for Final Plat review and approval, a written narrative stating how
each of the conditions of preliminary plat approval and noted code provisions
have been satisfactorily addressed, and must include a digital copy (pdf) of
the entire Final Plat submittal. This narrative must provide sufficient detail to
direct the reviewer to the appropriate plat, plan, sheet, note, covenant, etc. in
the submittal.
3. BMC 38.220.020.A & 38.610.010. The applicant must provide the community
development department with a copy of all required streambed, streambank
or wetlands permits or written notification from the appropriate agency the
status of the wetland jurisdiction determination whether or not a 404 permit is
required prior to the commencement to final plat approval of PHASES 5C and
5D.
4. Section 38.400.010.A.2. Laurel Parkway is a collector street as identified in the
City’s transportation master plan. Laurel Parkway must be fully completed to ensure the convenient and reliable movement of traffic and effective access for emergency services. Laurel Parkway must be constructed from Durston to West Babcock prior to final plat approval of Phase A of the subdivision.
5. BMC 38.400.010.A. Parking must be restricted at all location where the City’s
Design Standards and Specification Policy (DSSP) minimum for Length of
Tangency at Intersection has been deviated from and stopping sight distance
cannot be met with the presents of parked vehicles.
6. BMC 38.400.010.A. STOP signs are required at all location where the City’s
DSSP minimum for Length of Tangency at Intersection has been deviated
from on non-through streets.
7. BMC 38.420.022.D. A Park easement throughout Phase 5 is required with the
approval of Phase 1.
8. BMC 38.220.320.A.5 Common area and facility maintenance plan. The
developer must submit a legal instrument setting forth a plan providing for the
permanent care and maintenance of common areas and facilities. The same
must be submitted to the city attorney and must not be accepted by the city
until approved as to legal form and effect. Common areas and facilities must
115
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 15 of 29
be deeded to a POA and, the applicant must record the proposed documents
governing the association at the time of final plat filing.
9. BMC 38.380.100.A Affordable housing plan as binding agreement. An
affordable housing plan approved by the city will be considered a binding
contract between the developer and the developer's successors in interest to
the lot or dwelling. Such plan will be included in a separate recorded written
agreement between the developer and the city, or incorporated into another
recorded document wherein the developer is required to implement the
affordable housing plan. The affordable housing plan and associated written
agreement must be recorded at the time of final plat approval.
10. BMC 38.380.100.E Approval of affordable housing plan. The affordable
housing plan will be reviewed as part of the initial application approval
process for the type of development proposed. A condition shall be attached
to the approval of any subdivision plat or site plan to require recordation of the
affordable housing plan or other separate agreement obligating the developer
to meet the requirements of this article. Per this section see recommended
condition number 1 related to affordable housing.
11. BMC 38.240.150.A.3.d Transfer of ownership of public land, off-site land,
private land, personal property, improvements and water rights; documents
required.
a. For the transfer of real property in satisfaction of required or offered
dedications to the city, and required or offered donations or grants to the
POA, the subdivider or owner of the property must submit with the
application for final plat a warranty deed or other instrument acceptable to
the city attorney transferring fee simple ownership to the city or the POA.
b. For the transfer of personal property installed upon dedicated parkland or
city-owned open space, or POA-owned parkland or open space, the
subdivider must provide the city an instrument acceptable to the city
attorney transferring all its rights, title and interest in such improvements
including all applicable warranties to such improvements to the city or the
POA.
c. The subdivider or owner of the property must record the deed or
instrument transferring ownership or interests at the time of recording of
the final plat with the original of such deed or instrument returned to the
city or POA as applicable.
d. For the transfer of ownership interest in water, the subdivider or owner of
the property must submit with the application for final plat a deed or other
instrument acceptable to the city attorney transferring ownership to the city
116
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 16 of 29
or POA, along with all required state department of natural resources and
conservation documentation, certification and authorization.
12. BMC 38.240.450 requires a certificate of completion of improvements. The
certificate must specifically list all installed improvements and financially
guaranteed improvements.
13. BMC 38.240.520 Where non-public improvements are to be installed prior to
final plat approval, the final plat of subdivision must contain a certificate of
completion of non-public improvements. A certificate for all improvements
related to the perimeter street landscaping and irrigation, stormwater
improvements and open space lot landscaping and irrigation must be
provided on the final plat.
14. BMC 38.240.530. When irrigation of public facilities are to be installed prior to
final plat approval, the final plat of subdivision must contain a certificate of
completion of water-related improvements. The certificate must list all
completed and accepted improvements, including but not limited to all
irrigation system record drawings. The subdivision proposes irrigation of
public street frontage and city parkland. This certificate must be provided on
the final plat.
15. BMC 38.270.030 requires that all improvements to be dedicated to the public,
such as water mains, sewer mains, parkland and related improvements, and
public streets, must be installed in accordance with the approved plans and
specifications by the developer, and certified by a registered professional civil
engineer, licensed in the state of Montana, and accepted by the city prior to
the approval of the final plat, building permit, issuance of a certificate of
occupancy or other identified benchmark as may be appropriate.
16. BMC 38.420.090. Statements regarding waiver of right to protest the creation
of the parks and trails district and indicating that parkland is maintained by the
POA may be removed from the plat and covenants, with the exception of the
comments regarding retention ponds.
17. BMC 38.550.070. In accordance with the requirements of this section,
installation by the developer of vegetative ground cover, boulevard trees, and
irrigation system in the public right-of-way boulevard strips on perimeter
streets and in and adjacent to City park lots and all open space lots is
required prior to final plat approval.
18. BMC 38.410.060. A City standard sewer easement must be provided for the
proposed sanitary sewer connection along the northern property at any point
where the sewer line is less than nine feet from the edge of public right-of-
way (ROW) or if the access to a manhole falls outside of the public ROW. No
117
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 17 of 29
easement has been shown on the plat. Additionally, the 10 foot front yard
utility easement must be provided along the park and may not be placed
within the sewer easement. The 10 foot utility easement must start from the
edge of the ROW or sewer easement, whichever is greater and extend 10
feet into the property.
19. BMC 38.410.060. A drainage easement must executed and recorded for the
stormwater pond outlet pipe from where the pipe leaves the subject property
to the discharge point into Aajaker Creek. This easement must be provided
prior to the subdivision’s infrastructure approval. The easement must allow for
the long term access and maintenance of the pipe by the POA and access by
City staff to verify the pipe is being maintained.
20. BMC 38.410.060. The City standard 10 foot utility easement must be
extended along the western and eastern parks where the park fronts on
public ROW. This easement must be shown on the final plat.
21. BMC 38.410.070.A. The Norton Ranch Lift Station has been designed to be
reconfigured to allow for phased development of the Norton Ranch
Subdivision. The exact configuration is dependent on the phase and number
of dwelling units to be served. Currently, there are three pumps at the lift
station with a single principal pump that can operate under different hydraulic
conditions that the station experiences, specifically column separation after
pumping cycles. Montana Department of Environmental Quality (DEQ)
Circular 2 requires that multiple pumps must be provided and of the same
size. Units must have capacity such that, with any unit out of service, the
remaining units will have capacity to handle the design peak hour flow. The
station does not satisfy DEQ firm capacity requirements. The lift station must
be upgraded prior to final plat approval.
22. BMC 38.410.070.A. 12 foot all weather access must be provided to each
manhole proposed outside of the public right-of-way, specifically sanitary
sewer along the northern property boundary. The existing asphalt pathway is
not intended to support the loading from a City vacuum truck. The applicant
must provide a pavement design report for the pathway demonstrating the
necessary section required to support a City vacuum truck and upgrade the
pathway as need. This report must be provided with the infrastructure
submittal for the subdivision.
23. BMC 38.410.080.A. The proposed stormwater discharge from the detention
pond on the northwest corner of the development is located off-site. The
applicant must obtain an easement from the adjacent property owner for the
off-site discharge prior to final plat approval.
118
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 18 of 29
24. BMC 38.410.080.A. The subdivision is responsible for maintaining the
stormwater system. A stormwater maintenance plan must be reviewed and
approved with the infrastructure submittal. The approved plan must then be
incorporated into the POA documents and a copy of the POA documents
demonstrating inclusion of the stormwater maintenance must be provided to
the Community Development Division prior to final plat approval.
25. BMC 38.410.080.A. 12 foot all weather access must be provided to each
stormwater manhole proposed outside of the public ROW and extend into all
proposed ponds.
26. BMC 38.410.130. The applicant must contact the City Engineering
Department (Brian Heaston) for an analysis of cash in lieu of water rights and
pay any cash in lieu of water rights due prior to final plat approval.
27. BMC 38.400.040.A.2. Street names must be reviewed and approved by the
County’s geographic information systems and City Engineering Department
prior to final plat approval. The applicant must submit written approval from
both entities with the final plat application.
SECTION 4 - RECOMMENDATIONS AND FUTURE ACTIONS
The DRC determined that the application was adequate for continued review and
recommended approval with conditions on October 29, 2020
The Planning Board will conduct a public hearing to review the preliminary plat and
make a recommendation to the City Commission. The public hearing date for the
Planning Board is on November 16, 2020 at 6:00pm via WebEx.
The public hearing date for the City Commission is on December 1, 2020 at 6:00pm via
WebEx.
SECTION 5 - STAFF ANALYSIS AND FINDINGS
Analysis and resulting recommendations are based on the entirety of the application
materials, municipal codes, standards, and plans, public comment, and all other
materials available during the review period. Collectively this information is the record of
the review. The analysis is a summary of the completed review.
Applicable Subdivision Review Criteria, Section 38.240.130, BMC.
In considering applications for subdivision approval under this title, the advisory boards
and City Commission shall consider the following:
119
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 19 of 29
1) Compliance with the survey requirements of Part 4 of the Montana Subdivision
and Platting Act
The preliminary plat has been prepared in accordance with the survey requirements of
the Montana Subdivision and Platting Act by a Professional Engineer registered in the
State of Montana. As noted in recommended condition of approval number 2, the final
plat must comply with State statute, Administrative Rules of Montana, and the Bozeman
Municipal Code.
2) Compliance with the local subdivision regulations provided for in Part 5 of the
Montana Subdivision and Platting Act
The final plat shall comply with the standards identified and referenced in the Bozeman
Municipal Code (BMC). The applicant is advised that unmet code provisions, or code
provisions that are not specifically listed as a condition of approval, does not, in any way,
create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal
Code or State law. Sections 2 and 3 of this report identify conditions and code
requirements necessary to meet all regulatory standards. Therefore, upon satisfaction of
all conditions and code corrections the subdivision will comply with the local subdivision
regulations.
3) Compliance with the local subdivision review procedures provided for in Part 6
of the Montana Subdivision and Platting Act
The City of Bozeman Department of Community Development received a preliminary plat
application on July 3, 2018, requesting a major subdivision. The project was deemed
inadequate for review and review halted until revised materials were provided. Revised
materials were submitted on September 24, 2019, April 24, 2020, August 5, 2020,
September 25, 2020, and October 16, 2020. The application was deemed adequate on
October 29, 2020 and review continued. The final decision for a Major Subdivision must
be made within 60 working days of the date it was deemed adequate, or in this case, by
December 28, 2020. The City Commission is scheduled to review the preliminary plat and
make a decision at their December 1, 2020 public hearing.
The hearings before the Planning Board and City Commission have been properly noticed
as required by the Bozeman Municipal Code. Based on the recommendation of the DRC
and other applicable review agencies, as well as any public testimony received on the
matter, the Planning Board shall forward a recommendation to the City Commission who
will make the final decision on the applicant’s request.
The final decision for a Major Subdivision Preliminary Plat with less than 50 lots must be
made within 60 working days of the date it was deemed adequate. Pursuant to BMC
38.240.130.A.5.a(4), the City Commission must approve, conditionally approve or deny
the subdivision application by December 29, 2020, unless there is a written extension
from the developer, not to exceed one year.
120
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 20 of 29
Public notice for this application was given as described in Appendix C.
On November 12, 2020, this major subdivision staff report was completed and forwarded
with a recommendation of conditional approval for consideration by the Planning Board.
4) Compliance with Chapter 38, BMC and other relevant regulations
Based on review of the DRC and the Department of Community Development all
applicable regulations appear to be met if all code requirements are satisfied. Pertinent
code provisions and site specific requirements are included in this report for consideration
in Sections 2 and 3.
5) The provision of easements to and within the subdivision for the location and
installation of any necessary utilities
All easements, existing and proposed, must be accurately depicted and addressed on the
final plat and in the final plat application. Therefore, all utilities and necessary utility
easements will be provided and depicted accordingly on the final plat. All city utilities will
be located within dedicated street right of ways. Conditions 3 and code requirement 21
require performance of these obligations.
6) The provision of legal and physical access to each parcel within the
subdivision and the notation of that access on the applicable plat and any
instrument transferring the parcel
All of the proposed lots have frontage to proposed public streets required to be
constructed to City standards per BMC 38.400 and associated design standards. In
addition, pursuant to BMC 38.400.090.A, plats must contain a statement requiring lot
accesses to be built to the standard contained in this section, the city design standards
and specifications policy, and the City modifications to state public works standard
specifications.
Primary Subdivision Review Criteria, Section 76-3-608
1) The effect on agriculture
This subdivision will not impact agriculture. The subject property is designated as
residential according to the City of Bozeman Community Plan. The area is zoned for
residential and has been annexed but is vacant. The buildable portion of the proposed
subdivision is entirely residential. No viable farm units exist on the property. The
subdivision will not have adverse effects on agriculture.
2) The effect on Agricultural water user facilities
This subdivision will not impact agricultural water user facilities. There are no active
agricultural water use facilities located within the development. The area is zoned for
residential and has been under development for many years.
121
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 21 of 29
3) The effect on Local services
Water/Sewer – Municipal water and sewer mains exist in the adjacent street rights of
way of Babcock Street to serve the development. The subdivider proposes to extend
water and sewer mains throughout the development and to the individual lots within the
subdivision. These internal water and sewer mains will be installed or guaranteed prior
to final plat approval. The current Norton Ranch lift station can meet capacity
requirements for the subdivision.
The applicant must provide transfer of ownership of the irrigation facility to the property
owners’ association (POA) so that the POA can legally have the water resources
necessary to maintain the open space. Irrigation facilities to support the proposed parks
must be transferred to the City.
Condition of approval number 27 and code provisions 19, 20, 21, 24 outline the required
completion of easements and physical installation of water and sewer mains.
Cash in lieu of water rights is required to provide long term water to the project. Code
provision 26 applies to this issue.
Streets – The Growth Policy and subdivision standards require adequate connectivity of
the street grid to ensure sufficient infrastructure to serve the needs of the public and
alleviate congestion. The preliminary plat layout utilizes West Babcock Street, a
collector, and Vaughn Drive, a local street, to provide east west connectivity and Laurel
Parkway, a collector, provides north to south connectivity. Other internal local streets
provide access to all lots. The project is well connected and meets block length
requirements with the proposed streets and pedestrian midblock crossings.
The construction of Laurel Parkway is proposed by the developer in two phases not in
compliance with code requirements. With Phase 5a, it is proposed to be constructed
from West Babcock to Boomtown Road and then the remainder of it to Vaughn Drive
with Phase 5B, which is the third phase. Laurel Parkway is identified as a collector the
City’s Transportation Master Plan. To ensure that movement is convenient and reliable
through the development and grant effective access for emergency services, Laurel
Parkway must be constructed from Durston Road to West Babcock with the first phase,
or in this case, Phase 5a. The Lakes at Valley West has constructed their portion of
Laurel Parkway from Durston Road south to Vaughn Drive. The right of way for Laurel
Parkway was granted in 2007 with the annexation of the Norton East Ranch. Condition
of approval number 29 and code provision number 4 apply to this issue. Please see the
attached Engineering memo for further findings.
The development’s traffic impact study has identified the intersection of Laurel and
Durston will fall below the City’s level of service requirements in the future. However,
based on the subdivision’s build out year, the Engineering Department has determined
122
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 22 of 29
the intersection will have an acceptable level of service by the completion of the entire
subdivision as ensured by condition of approval number 8.
Street lighting is a component of the required street improvements. A special
improvement lighting district (SILD) is proposed to maintain these facilities. Condition
number 8 ensures that the SILD will be formed and effective before final plat. The
requirement for a single SILD will simplify long term maintenance of the street lights and
provide a cost that is more equitably shared.
Maintenance and use of public streets is subject to the terms of the Bozeman Municipal
Code. The certificate of dedication for the final plat must specify responsibilities for
maintenance of all streets, parks and open spaces. Code provisions apply to this issue.
Police/Fire – The area of the subdivision is within the service area of both these
departments. No concerns on service availability have been identified. The necessary
addresses will be provided to enable 911 response to individual homes prior to
recording of the final plat.
Stormwater - The subdivision will construct storm water control facilities to conform to
municipal code. Inspection of installed facilities prior to final plat will verify that
standards have been met. Maintenance of the storm water facilities is an obligation of
the property owners’ association. This responsibility is addressed in the covenants
proposed with the subdivision. Conditions number 8, 22, and 25 ensures this will be
satisfied according to standards with the final plat.
There is a proposed stormwater discharge from the detention pond located in Park 5A
that then drains off site into Aajaker Creek to the west. An easement from the property
owner to the west must be acquired in order for the stormwater to travel off site of the
Norton property into Aajaker which is addressed in condition number 21 and code
provision number 24.
Parklands - The proposal meets the required park dedication and improvement
standards. The Recreation and Parks Advisory Board recommends approval of the park
master plan. A final park plan will be completed and approved with the initial final plat.
The parkland proposal for Norton Ranch Phase 5 consists of parkland totaling 8.76
acres within 5 City park lots. A large amount of this land is within watercourse setback
areas and the parkland contribution is reduced accordingly; however the inclusion of the
watercourses and setback areas within the larger park parcels was allowed with the
approval of the Park Master Plan for Norton Ranch Subdivision approved on September
27, 2010 and previous phases. There is a linear park corridor along the west edge of
the subdivision that coincides with Aajker Creek. This linear park was proposed to be
built in two phases, the southern portion with 5A and the northern portion with 5B. The
applicant has agreed to construct the linear park and the trails with Phase 5A as
described in condition number 34.
123
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 23 of 29
At the northwest corner of Phase 5, there is a 1.769 acres park proposed including a
.785 acre retention pond. The large park lot is 5.636 acres with 1.678 acres of wetlands.
Within this park, there will be a playground area, a parking lot, a Class II gravel
pathway, and wayfinding signage. Condition of approval 13 and 14 and code provisions
7 and 15 address park easements and dedication within the development.
4) The effect on the Natural environment
Wetlands exist on the property on the eastern portion and on the northern property
boundary. The watercourse setback for this wetland is located mainly on the proposed
park but does impact some of the lots on the eastern and northern portion of the
development, part of Phases 5C and 5D. The City required an updated wetland
delineation as it had been over 5 years since the most current one was conducted that
was used for previous Norton Ranch phases. The 2018 delineation results indicated
that the wetlands had expanded since 2006 due to a several sources of water that have
since been abandoned or diverted to Aajker Creek, which flows to the west of the
development. Due to this expansion, a new jurisdictional status determination is
required from the U.S. Army Corps. The proposed layout does not impact the
preservation wetland but it will impact the wetland fringe identified in 2018. See
Appendix E, Wetland Exhibit for wetland boundary changes. Review of this
determination is underway and if it is determined that the wetlands are classified as
jurisdictional, they fall under the purview of the U.S. Army Corps which will require
additional permitting such as a 404 permit and possible mitigation. Some of the wetland
boundary encroaches into lots in Phases 5c and 5d which could result in the wetlands
needing to be filled in order for the lots to be developed if they are classified as
jurisdictional. Condition of approval number 16 and code provision 3 ensures that
wetland jurisdiction determination must be completed prior to final plat approval.
The City requires use of wells or surface water rights to irrigate parks rather than
municipal water supply. There is a lesser energy and infrastructure cost to this
approach. However, in order for the City to rely on these sources to meet the code
requirement there must be the rights to the water. Code provision 11 requires that
necessary ownership and rights be transferred to the POA or City as appropriate.
The site is in an area of high groundwater, which may negatively impact future homes or
cause illicit discharges into the sanitary sewer and over burden the surface drainage
system. Condition of approval number 21 prohibits use of basements. This requirement
will protect both individual home owners from future hazards of flooding and lessen
burden on the public from illicit discharges.
5) The effect on Wildlife and wildlife habitat
The subdivision will not significantly impact wildlife and wildlife habitat. The site has
been substantially impacted by grazing which has reduced wildlife habitat. There are no
124
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 24 of 29
known endangered or threatened species on the property. Comment from state
Montana Fish Wildlife and Parks found no immediate negative effects related to wildlife
impact from this proposed development.
6) The effect on Public health and safety
The intent of the regulations in Chapter 38 of the Bozeman Municipal Code is to protect
the public health, safety and general welfare. The subdivision has been reviewed by
the DRC which has determined that it is in general compliance with the title. Conditions
deemed necessary to ensure compliance are noted throughout this staff report. All
subdivisions must be reviewed against the criteria listed in 76-3-608.3.b-d, Mont Code
Annotated. The Department of Community Development has reviewed this application
against the listed criteria and provides the following summary for submittal materials
and requirements.
Preliminary Plat Supplements
A subdivision pre-application plan review was completed by the DRC on October 31,
2017. With the pre-application plan review application, waivers were requested from
the materials required in Section 38.220.060 “Additional Subdivision Preliminary Plat
Supplements.” Some items were not waived and all required material has been
addressed.
Staff offers the following summary comments on the supplemental information required
with Article 38.220, BMC.
38.220.060.A.1 Surface Water
As stated in the analysis above on the natural environment, wetlands and surface
waters exist on the property. Surface waters on the property a preservation wetland
located along the east boundary of the property, a temporary drain ditch excavated in
January 2015 along the north property boundary, and an existing temporary retention
located in the southwest corner of the property. The proposed layout does not impact
the preservation wetland but it will impact the wetland fringe identified in 2018. See
Appendix E, wetland exhibit.
38.220.060.A.2 Floodplains
Material Waived. There are no designated floodplains on or immediately adjacent to the site.
38.220.060.A.3 Groundwater
The groundwater monitoring well report is included at the end of the stormwater design
report in Appendix B of the application submittal. Groundwater levels in the monitor wells were measured during the spring of 2018 and groundwater depths ranged from .5 feet to 2 feet. Condition of approval 8, 22 and 25 require additional data to ensure that all City drainage standards are met.
125
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 25 of 29
The geotechnical investigation conducted in January 2018 is included in Appendix C.
Groundwater was encountered in all test pit excavations. Condition 21 restricts
basements and crawl spaces for this reason. Plat note 7 restricts crawl spaces and basements and prohibits discharging from sump pumps into the sanitary sewer, storm sewer or onto streets and gutters.
A drain tile analysis was conducted in October 2016 to discuss a historic drain tile
system that was partially truncated during infrastructure development that occurred in 2013. A replacement drain tile system was installed late 2016, early 2017 to restore the groundwater balance. The associated agency approvals for this system are located in Appendix E. An easement has been granted to Norton Properties, LLC that allows a
perpetual drainage pipeline to deliver discharge from the drain tile system to Aajker
Creek located to the west of the proposed development and is located in Appendix B. Condition 24 address the drain tile system. Impacts to groundwater are mitigated by conditions of approval and code requirements.
38.220.060.A.4 Geology, Soils and Slopes
No unusual geological features are present. The geotechnical investigation conducted
in January 2018 is included with this application in Appendix C. The soil was deemed
acceptable to carry the burden of infrastructure with foundation recommendations and
bearing capacity detailed in the report.
38.220.060.A.5 Vegetation
The site has a history of agriculture with few native plants present except possibly in wetland fringe areas. Wetland mitigation located east of Phase 5 and within the
proposed park was conducted in 2007. A summary of this report and conservation
easements are included in Appendix E. A watercourse setback bordering the east side of the development and in the park will be revegetated with native grasses and shrubs.
38.220.060.A.6 Wildlife
Material waived. No critical wildlife species or habitat are known to be found on the
property.
38.220.060.A.7 Historical Features
Material waived. No notable features are on the site.
38.220.060.A.8 Agriculture
Material waived. See discussion above under primary review criteria.
38.220.060.A.9 Agricultural Water User Facilities
There are no active agricultural water user facilities located within the development.
38.220.060.A.10 Water and Sewer
New infrastructure will be installed on site to serve the development. See discussion above under primary review criteria. The required design reports have been provided in
126
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 26 of 29
Appendix A. Formal plans and specifications will be prepared and reviewed after action on the preliminary plat. Cash in lieu of water rights is required to provide long term water
to the project. Code provision 26 applies to this issue.
38.220.060.A.11 Stormwater Management
Stormwater within the subdivision will be conveyed via surface gutter flow to cub inlets, then underground via storm drain piping to a stormwater detention pond located in Park 5A. See stormwater design report in Appendix B.
38.220.060.A.12 Streets, Roads and Alleys
A traffic impact study was completed and is included in Appendix F. It was determined by the Engineering Department that the street infrastructure proposed will adequately service the subdivision with the exemption of condition of approval number 29 and code provision 4. See discussion above under primary review criteria.
38.220.060.A.13 Utilities
All private utilities servicing the subdivision will be installed underground. Standard 10
foot front setback utility easements are provided across all lots. See discussion above under primary review criteria regarding extension of water and sewer. All private utilities are available in the area.
38.220.060.A.14 Educational Facilities
A letter was received from Director of Facilities of Bozeman Public Schools. Adequate
capacity is available and detailed in Appendix C.
38.220.060.A.15 Land Use
The use proposed is exclusively residential for the buildable portion of phase 5, which conforms to the future land use designation and zoning purposes. 148 lots will be developed with Phase 5 which are to the west of Laurel Parkway. The R1A, R1B, R1C,
and R1D restricted development lots to the east of Laurel Parkway are subject to further subdivision review prior to development.
38.220.060.A.16 Parks and Recreation Facilities
There is a Master Park Plan for this project located in Appendix G which details the proposed parks. See discussion above under primary review criteria.
38.220.060.A.17 Neighborhood Center Plan
Material waived. A Neighborhood Center was satisfied with Phase 3 on the southeast corner of Babcock and Laurel Parkway. In this neighborhood center includes pedestrian infrastructure and park amenities. The entirety of Phase 5 is within one-half mile of the existing neighborhood center.
38.220.060.A.18 Lighting Plan
All street lights installed must use LED light heads and must conform to the City’s
requirement for cut-off shields as required by the City’s specifications. A special improvement lighting District (SILD) must be created prior to final plat application.
127
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 27 of 29
38.220.060.A.19 Miscellaneous
Material waived. No additional impacts or hazards anticipated.
38.220060.A.20 Affordable Housing
There will be 14 affordable single household detached lots constructed to meet affordable housing requirements. They are expected to be single family detached homes with 3 bedrooms. The affordable homes will be constructed in Phase 5A on Lots 1, 2, 21 and 22 of Block 23, Lots 1 and 2 of Block 22, Lot 8 and 9 of Block 18, Lots 8, 9, 10 and 11 of Block 19 and in Phase 5C on Lots 10 and 11 of Block 18. CAHAB
reviewed and recommended approval of the Affordable Housing Plan. See Appendix H for more information on the affordable housing plan. Condition 12 and code provisions 9 and 10 detail affordable housing requirements prior to final plat approval. APPENDIX A –PROJECT SITE ZONING AND GROWTH POLICY
Zoning Designation and Land Uses: The subject property is zoned R-2 (Residential
Moderate Density), R-3 (Residential Medium Density District), and R-4 (Residential
High Density District. The buildable portion of the subdivision subject to immediate
development is located in the R-2 and R-3 districts.
The intent of the R-2 residential moderate density district is to provide for one- and two-
household residential development at urban densities within the city in areas that
present few or no development constraints. These purposes are accomplished by:
1. Providing for minimum lot sizes in developed areas consistent with the
established development patterns while providing greater flexibility for clustering
lots and housing types in newly developed areas.
2. Providing for community facilities to serve such development while respecting the
residential quality and nature of the area.
Use of this zone is appropriate for areas with moderate access to parks, community
services and/or transit.
The intent of the R-3 residential medium density district is to provide for the
development of one- to five-household residential structures near service facilities within
the city. This purpose is accomplished by:
1. Providing for minimum lot sizes in developed areas consistent with the
established development patterns while providing greater flexibility for clustering
lots and mixing housing types in newly developed areas.
2. Providing for a variety of housing types, including single household dwellings,
two to four household dwellings, and townhouses to serve the varied needs of
households of different size, age and character, while reducing the adverse effect
of non-residential uses.
128
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 28 of 29
Use of this zone is appropriate for areas with good access to parks, community services
and/or transit.
Adopted Growth Policy Designation: The Future Land Use Map of the Bozeman
Community Plan designates the subject property to develop as “Residential.” The
“Residential” classification designates places where the primary activity is urban density
dwellings. Other uses which complement residences are also acceptable such as parks,
low intensity home based occupations, fire stations, churches, and schools. High
density residential areas should be established in close proximity to commercial centers
to facilitate the provision of services and employment opportunities to persons without
requiring the use of an automobile. Implementation of this category by residential zoning
should provide for and coordinate intensive residential uses in proximity to commercial
centers. The residential designation indicates that it is expected that development will
occur within municipal boundaries, which may require annexation prior to development.
The dwelling unit density expected within this classification varies between 6 and 32
dwellings per net acre. A higher density may be considered in some locations and
circumstances. A variety of housing types can be blended to achieve the desired
density. Large areas of single type housing are discouraged. In limited instances the
strong presence of constraints and natural features, such as floodplains, may cause an
area to be designated for development at a lower density than normally expected within
this category. All residential housing should be arranged with consideration of
compatibility with adjacent development, natural constraints, such as watercourses or
steep slopes, and in a fashion which advances the overall goals of the Bozeman growth
policy. The residential designation is intended to provide the primary locations for
additional housing within the planning area.
APPENDIX B – NOTICING AND PUBLIC COMMENT
Notice was provided at least 15 and not more than 45 days prior to the Planning Board
and City Commission public hearings. Per Article 38.220, Notice was provided by
posting the site, mailing by certified mail to adjacent property owners and by first class
mail to all other owners within 200 feet, and by legal advertisement publication in the
Bozeman Daily Chronicle. Content of the notice contained all elements required by
Article 38.220, BMC.
No public comment has been received.
APPENDIX C - OWNER INFORMATION
Owner: Norton Properties, LLC 63026 NE Lower Meadow Dr #200; Bend, OR 97701-
5877
Applicant: Kilday & Stratton, Inc., 2880 Technology Boulevard West, Suite 273,
Bozeman, MT 59718
129
18278 City Commission Staff Report – Norton Ranch Phase 5 Subdivision Page 29 of 29
Representative: C&H Engineering & Surveying, 1091 Stoneridge Drive, Bozeman, MT
59718
Report by: Sarah Rosenberg, AICP, Associate Planner
FISCAL EFFECTS
The development will generate the typical costs and revenues of residential
development.
ATTACHMENTS
The full application and file of record can be viewed at the Community Development
Department at 20 E. Olive Street, Bozeman, MT 59715.
Community Housing Program Manager Comments
Engineering memo, dated November 19, 2020
Application materials – Available through the Laserfiche archive linked agenda
materials.
130
MEMORANDUM
-------------------------------------------------------------------------------------------------------------------------------
TO: Sarah Rosenberg, Associate Planner
FROM: Griffin Nielsen, Staff Engineer
Lance Lehigh, Development Review Engineering Manager
Taylor Lonsdale, City Transportation Engineer
Shawn Kohtz, City Engineer
CC: Mitch Reister, Public Works Director
RE: Norton East Ranch Phase 5 Preliminary Plat App No.18278 – Code Requirement
No. 4 Extension of Laurel Parkway
DATE: November 19, 2020
-------------------------------------------------------------------------------------------------------------------------------
The following memo expands upon Code Requirement No. 4 regarding the completion of Laurel Parkway
with Phase 5A of the Norton East Ranch Development. The code section and requirement are referenced
below:
Bozeman Municipal Code (BMC) Section 38.400.010.A.: All streets must comply with the adopted
growth policy and/or transportation plan. The arrangement, type, extent, width, grade and location
of all streets must be considered in their relation to existing and planned streets, to topographical
conditions, to public convenience and safety, and to the proposed uses of the land to be served by
such streets. The design standards contained in these regulations apply to all construction,
reconstruction and paving of streets. Review authority for exceptions or modifications to this
section is specified in division 38.200.010.
2. Relation to developed areas. The developer must arrange the streets and alleys to
provide for the continuation of streets and alleys between adjacent developed
properties when such continuation is necessary for the convenient movement of traffic,
effective provision of emergency services and efficient provision of utilities.
Code Requirement No. 4: Bozeman Municipal Code (BMC) Section 38.400.010.A.2.: Laurel Parkway is
a collector street as identified in the City’s transportation master plan. Laurel Parkway must be fully
completed to ensure the convenient and reliable movement of traffic and effective access for
emergency services. Laurel Parkway must be constructed from Durston to West Babcock prior to final
plat approval of Phase 5A of the subdivision.
There are several reasons for staff interpretation of this code requirement to complete Laurel Parkway
with Phase 5A/Phase 1 of the proposed subdivision, which are summarized as follows.
131
Connectivity to Street Network
Transportation connectivity is significantly limited in the vicinity of the Norton Ranch Development.
Currently, only one major collector street (West Babcock) serves all of the existing first four phases (1-4)
of the Norton Ranch Development (Figure 1).
Figure 1. Existing Street Network in the Vicinity of the Norton Ranch Development
132
Collector and arterial streets serve as the backbone of the City’s transportation network and provide
mobility for vehicular, pedestrian, and multi-modal transportation. Collector and arterial streets are
designed to allow higher traffic volumes, while local streets provide direct access to a final destination.
The local street classification typically correlates with low traffic volume and speed conditions. Other than
West Babcock Street, all streets serving existing phases of the Norton Ranch Development are classified
as local streets.
As proposed by the applicant, the existing Norton Ranch Phases 1 through 4 as well as the proposed Phase
5A would be routed to a singular collector street (West Babcock Street). The applicant is proposing to
construct Laurel Parkway in two separate phases as outlined in Figure 2. The YELLOW section would be
constructed with Phase 5A, which is approximately 510 ft. The subsequent phase (5B) would complete
the remaining BLUE segment, which is an additional 825 ft. The total length of the entire segment is
approximately 1,335 ft or ¼ of a mile.
Figure 2. Applicant Proposed Construction Phasing of Laurel Parkway
133
Currently, there is no connectivity to the City’s arterial or collector street transportation system in three
(3) out of the (4) cardinal directions (west, south, and north). Table 1 indicates the number of dwelling
units in the Norton Ranch Development and associated traffic demands.
Table 1. Norton Ranch Development Dwelling Units and Traffic Demands
The proposed Norton Ranch Phase 5 subdivision will add approximately 138 units, 299 people, and 1,314
vehicles trips per day of which 54 units, 117 people, and 514 vehicles trips per day are included in Phase
5A or Phase 1 of the development.
Without the connection of Laurel Parkway the west leg of the intersection of Cottonwood and Babcock is
projected to experience delays of 33 -39 seconds/vehicle. The only other means of ingress/egress to the
existing phases as well as the proposed Phase 5A of the Norton Ranch Development is via Fallon Street
(classified as a local road) connection to Cottonwood Road (Arterial). Without direct connections to the
arterial and collector street network, drivers will use local streets as a “cut through” in order to reach their
destination. This often results in frustration of the residents on those local streets.
Figure 3 shows the larger transportation network, the various travel options that become available by
completing Laurel Parkway, and highlights several of the major travel destinations residents frequent in
the region. By completing the segment of Laurel Parkway between Babcock Street and Vaughn Drive per
the City’s Transportation Master Plan, two additional directions of travel from the Norton Ranch
Development (north and west) become available. Currently, Babcock Street terminates at the edge of the
Phase Dwelling Units Weekday Trip Ends**Acreage
Phase 1*82 781 21.4
Phase 2*30 286 6.7
Phase 2A*36 343 11
Phase 3A*48 457 11.4
Phase 3B*30 286 9.6
Phase 3C*30 286 6.3
Phase 4*152 1447 15.6
Phase 5A 54 514 6.9
Total 462 4398 88.9
Norton Ranch Development Dwelling Units and Traffic Demands
*Dwelling Unit Counts obtained from the applicants wastewater design report
** Calculated using the ITE Manual 9th Addition Single-Family Detached Housing (#210) Average Rate for Dwelling Units
134
Norton Ranch Development; therefore, westbound travel is severely limited. Opening the west direction
via Laurel Parkway to Durston Road will significantly reduce backtracking associated with routing traffic
to Cottonwood Road and then to Durston Road or Huffine Lane to travel west. A significant north/south
option of travel will also be opened for the entire Norton Ranch Development as well as development to
the north of Norton Ranch. This will allow traffic from Norton Ranch to directly access Durston Road and
Oak Street and subsequently improve options to and from the east. Additionally, this route option will
reduce backtracking associated with the Lakes at Valley West Subdivision.
Figure 3: Regional Development and Access
135
Accommodation of Multi-Modal Traffic
With the new high school, Sports Park, Meadowlark Elementary School, Petra Academy, and Heritage
Christian School, and upcoming commercial development associated with the Northwest Crossing the
demands will significantly increase for multi-modal transportation in this area. Without the Laurel
Parkway connection to the north, bikes and pedestrians must backtrack to the south from Phase 5A before
moving in the direction of their intended destination. Even small increases in travel distance discourage
bike and pedestrian modes of travel. Additionally, by completing the remaining segment (totaling 1,335-
feet) of Laurel Parkway, the Lakes at Valley West Subdivision will have an alternate and reduced route to
the Ferguson Farm commercial area, which includes the proposed Town and Country grocery store. It is
these critical community connectivity considerations that establish our requirements for constructing our
arterial and collector streets in the initial phases of development; each development adds to and
enhances our community and its transportation network. Figure 3 summarizes the proximity of multi-
model demands and needs of the transportation network. As such completion of the Laurel Parkway aligns
with Sections 4.2 and 4.5 of the Strategic Plan and Objectives T-2.1, T-2.3, and T-4.2 of the 2009
Community Growth Policy which have been considered during the review. Additionally with the adoption
of the 2020 Community Growth Policy completion will align with Goals DCD-3, EPO-3 and M-1.
Provision for Emergency Services
Emergency services access, response times, and alternate routes will significantly improve with the Laurel
Parkway connection, which is consistent with Goal 4 of the TMP. For example, under the current
condition, if West Babcock Street must be closed for utility excavation, construction work, street
maintenance, or a vehicle crash, emergency services access to the Norton Ranch Development is limited
to Fallon Street (a local street) without the Laurel Parkway connection.
Aligning with City Goals and Directives
The following provides a brief summary of the various City planning and policy related documents that
recognize the need for required improvements that are deemed necessary to provide adequate and
sufficient access for vehicular, pedestrian, and multi-modal transportation, in order to mitigate the
impacts of development and maintain a safe effective transportation network.
2009 Community Growth Policy
Chapter 11.3 Transportation Goals and Objective: Transportation System-Maintain and enhance the
functionality of the transportation system:
Objective T-1.3: All development activity shall comply with the right-of-way standards, road
locations, and other policies set forth in the transportation facility plan to ensure that an orderly,
efficient, effective transportation system is continued and to avoid future problems with
inadequate transportation services and options.
Objective T-1.4: Ensure that adequate interconnections are made throughout the transportation
system to ensure a variety of alternatives for trip routing and reduce total travel distance.
136
2020 Community Growth Policy
Theme 3: A city bolstered by downtown and complementary districts
Goal DCD-3: Ensure multimodal connectivity within the City.
o DCD-3.2 Identify missing links in the multimodal system, prioritize those most beneficial
to complete, and pursue funding for completion of those links.
o DCD-3.3 Identify major existing and future destinations for biking and walking to aid in
prioritization of route planning and completion.
o DCD-3.4 Support implementation of the Bozeman Transportation Master Plan strategies
Theme 4: A city influenced by our natural environment, parks, and open lands
Goal EPO-3: Address climate change in the City’s plans and operations.
o EPO-3.2 Ensure complete streets and identify long-term resources for the maintenance
of year round bike and multi-use paths to improve utilization and reduce annual per
capita vehicle miles traveled.
Theme 5: A city that prioritizes accessibility and mobility choices
Goal M-1: Ensure multimodal accessibility.
o M-1.4 Develop safe, connected, and complementary transportation networks for
pedestrians, bicyclists, and users of other personal mobility devices ( e-bikes, electric
scooters, powered wheelchairs, etc.).
o M-1.9 Prioritize and construct key bicycle infrastructure, to include wayfinding signage,
connections, and enhancements with emphasis on completing network connectivity.
Implementation: Short-term Action List
6. Identify missing links in the multimodal system, prioritize those most beneficial to complete,
and pursue funding for completion of those links as noted in objectives M-1.4, M-1.9, and M-1.11.
City 2017 Transportation Master Plan (TMP)
Goal 2: Improve the efficiency, performance and connectivity of a balanced transportation
system.
o A transportation system that performs well allows users to choose multiple
transportation modes and to move through those modes in a safe and efficient manner.
An efficient system allows people to move from place to place in as direct a route as
possible, allowing them to reduce the amount of time spent in travel, the distance that
must be traveled, and the amount of time spent in congested traffic. Connectivity allows
citizens to make route decisions and mode choices based on traffic and road conditions,
or desired destinations.
Goal 4: Provide a safe and secure transportation system.
o Most community planning efforts recognize the desire for a safe transportation system.
Community safety and security can be improved by transportation efforts in a number of
ways. Reducing crashes, improving the ability of emergency responders to quickly and reliably
respond to emergencies, and providing evacuation routes in the event of a natural disaster
137
will all assist to improving safety and security. Educational programs that help travelers
understand the particular safety concerns associated with various travel modes can also help
all users travel with increased confidence and security.
Goal 7: promote a financially sustainable transportation plan that is actively used to guide the
transportation decision-making process.
o Transportation facilities that provide options to the public, reduce the time spent
traveling, reduce fuel consumption, and make the best use of limited public funds for
infrastructure improvements are desirable. Not only are costs related to the cost of
building facilities, but there are also associated costs of time spent in vehicles.
Complete Streets Policy
Commission Resolution Number 4244 regarding complete streets policy directs staff to “enable
safe and convenient access to our transportation system for all users, of all ages and abilities,
including pedestrians, bicyclists, people with disabilities, transit riders, and motor vehicle drivers.”
City of Bozeman Strategic Plan
4.2 High Quality Urban Approach: Continue to support high-quality planning, ranging from
building design to neighborhood layouts, while pursuing urban approaches to issues such as
multimodal transportation, infill, density, connected trails and parks, and walkable
neighborhoods.
4.5 Housing and Transportation Choices: Vigorously encourage, through a wide variety of actions,
the development of sustainable and lasting housing options for underserved individuals and
families and improve mobility options that accommodate all travel modes.
138
MEMORANDUM ------------------------------------------------------------------------------------------------------------ TO: Sarah Rosenberg FROM: Tanya Andreasen, Community Housing Program Manager RE: Norton Ranch, Phase 5 Affordable Housing Plan
DATE: October 23, 2020 -----------------------------------------------------------------------------------------------------------
Recommendation: The Affordable Housing Plan is adequate for continued review. The Community Housing Program Manager recommends approval of the current application.
Discussion: The developer proposes to provide ten percent, or fourteen (14) detached 3-bedroom Lower Priced Homes (10% of total at 70% AMI) of the 138 total homes in the development as required by the City’s Affordable Housing Ordinance. The applicant proposes to provide the fourteen lower priced homes in Phase V, to be developed concurrently with 124 market rate homes. The lower priced and market rate homes will all have three (3) bedrooms, and will be built throughout the subdivision, as identified in the Affordable Housing Plan submitted June 10, 2020. The applicant will be seeking Impact Fee reimbursement from the Community Housing Fund for the qualifying Lower Priced Homes (up to fourteen homes). In addition, the applicant is requesting that down payment assistance for qualifying buyers under the City’s Affordable Housing Ordinance (up to $10,000 for each qualifying home buyer of a qualifying home). The review of the Affordable Housing Plan requires the review and recommendation of the citizen advisory board responsible for this issue; the Community Affordable Housing Advisory Board (CAHAB). The developer presented the Affordable Housing Plan to CAHAB on October 14th, 2020, and after reviewing and discussing the materials presented by the applicant, the staff memo, and hearing presentations from the applicant and staff, CAHAB recommended that the City Commission approve the Affordable Housing Plan for Norton Ranch East Phase V Subdivision.
RECOMMENDED CONDITIONS OF APPROVAL Please note that these conditions are in addition to any required code provisions identified in this report. These conditions are specific to the development.
139
1. The approved affordable housing plan must be recorded concurrent with the final plat and a reference to the recorded document must be provided on the conditions of approval page of the final plat. The reference on the conditions of approval sheet must be “This subdivision is subject to affordable housing requirements. The subdivision’s requirements and obligations can be found in the Norton Ranch East Subdivision, Phase V Affordable Housing Plan recorded as document no.___________ at the Gallatin County Clerk and Recorders Office.”
Section 3 – REQUIRED CODE PROVISIONS. All citations are to the Bozeman
Municipal Code (BMC). 2. BMC 38.380.100.A Affordable housing plan as binding agreement. An affordable housing plan approved by the city will be considered a binding contract between the developer and the developer's successors in interest to the lot or dwelling. Such plan will be included in a separate recorded written agreement between the developer and the city, or incorporated into another recorded document wherein the developer is required to implement the affordable housing plan. The affordable housing plan and associated written agreement must be recorded at the time of final plat approval. 3. BMC 38.380.100.E Approval of affordable housing plan. The affordable housing plan will be reviewed as part of the initial application approval process for the type of development proposed. A condition shall be attached to the approval of any subdivision plat or site plan to require recordation of the affordable housing plan or other separate agreement obligating the developer to meet the requirements of this article. Per this section see recommended condition number 1 related to affordable housing.
140
PhaseOpen Space (SF)Park (SF)Lots (SF)Total (SF)5A023,513277,119300,6325B16,714112,369254,020383,1035C00132,483132,4835D2,744245,50799,130347,381REMAINDER1,785,060001,785,060R.O.W.000506,018Total1,804,518381,389762,7523,454,677141
ΔΔΔΔ Δ
ΔΔ
Δ
ΔΔ ΔΔ ΔΔ
Δ
Δ
Δ142
Δ=Δ=143
144
AeccDbCogoPoint (AeccLand120)AeccDbCogoPoint (AeccLand120)w478047814782478347844785478647874788 4788478947854786478747884789479047914792479347944793479447964796479547944793479247914790479547944793479247914790478947844785478647874788478947904790 4788478747864793479247914790478947884787478647854788 478047804780
4785
4784478547864785478447834782
CONIFERSQTYBOTANICAL / COMMON NAMECONTCALSIZEMATURE SIZEDROUGHT TOLERANT13Picea pungens / Colorado SpruceB & B8`-10`50`-60`YesDECIDUOUS TREESQTYBOTANICAL / COMMON NAMECONTCALSIZEMATURE SIZEDROUGHT TOLERANT11Acer platanoides `Emerald Lustre` / Norway MapleB & B1.5"-2.0"50`-60`No3Acer rubrum `Northwood` / Northwood MapleB & B1.5"-2.0"40`-50`No9Gleditsia triacanthos `Skyline` / Skyline Honey LocustB & B1.5"-2.0"40`-50`Yes35Populus tremuloides / Quaking AspenB & B1.5"Cal35`-45`No10Populus tremuloides / Quaking AspenB & BClump35`-45`No21Populus x acuminata / Lanceleaf PoplarB & B1.5"-2.0"50`-60`No6Prunus maackii / Amur ChokecherryB & B1.5"-2.0"20-30`No9Tilia americana `Boulevard` / Boulevard LindenB & B1.5"-2.0"40`-50`No13Ulmus davidiana japonica `Discovery` / Discovery ElmB & B1.5"-2.0"40`-50`NoSHRUBSQTYBOTANICAL / COMMON NAMESIZEMATURE SIZEDROUGHT TOLERANT30Amelanchier alnifolia / Serviceberry5 gal10-15`Yes47Cornus stolonifera `Arctic Fire` / Arctic Fire Dogwood5 gal4`-5`No6Juniperus sabina `Buffalo` / Buffalo Juniper5 gal6-12"Yes18Ribes alpinum / Alpine Currant3 gal4`-5`Yes66Ribes aureum / Golden Currant5 gal5`-6`Yes22Salix bebbiana / Bebb's Willow5 gal10-15`No37Symphoricarpos albus / Common White Snowberry5 gal4`-5`YesGRASSESQTYBOTANICAL / COMMON NAMESIZEMATURE SIZEDROUGHT TOLERANT8Helictotrichon sempervirens `Blue Oats` / Blue Oat Grass1 galPLANT SCHEDULE PARK AND OPEN SPACEGENERAL NOTES1)ALL LANDSCAPED AREAS SHALL HAVE PERMANENT UNDERGROUND IRRIGATION INSTALLED TOENSURE A HEALTHY LANDSCAPE. 2) ALL TREES SHALL BE STAKED WITH WOOD STAKES (MIN OF 2 PER TREE) ANY TREE OR SHRUB PLANTED THAT IS NOT IN A LANDSCAPE BED SHALL HAVE A 3' DIA. 4" DEPTH ORGANIC MULCHRING AT THE BASE. 3) NO TREE SHALL BE PLANTED WITHIN 10' OF ANY FIRE HYDRANT, SEWER OR WATER LINE. 4) ALL STREET TREES SHALL BE APPROVED BY CITY FORESTER AND PLANTED SLIGHTLY HIGHER THAN GRADE AND WITH THE TREE COLLAR EXPOSED. THE HOLE EXCAVATED SHALL BE TWICE THE SIZE OF THE POT OR ROOT BALL OF THE TREE.5)ALL PLANTS SHALL BE GUARANTEED FOR ONE YEAR AFTER PROJECT COMPLETION.6)ALL LAWN AREAS SHALL BE SEEDED WITH LOCAL SEED7)ALL DISTURBED AREAS ON SITE SHALL BE RE-GRADED, ROCK HOUNDED AND SEEDEDTO PREVENT WEED GROWTH. TEMPORARY IRRIGATION MAY BE REQUIRED FOR SEEDRE-ESTABLISHMENT8)NO PLANT SUBSTITUTIONS WITHOUT WRITTEN APPROVAL FROM THE OWNER AND LANDSCAPEDESIGNER9)CONTRACTOR TO VERIFY PLANT QUANTITIES. IF THERE IS A DISCREPANCY BETWEEN THE PLANAND TABLE, THE PLAN SHALL DICTATE COUNT.10)ALL SHRUB BEDS SHALL BE LINED WITH PROFESSIONAL GRADE TYPAR WEED FABRIC ANDCOVERED WITH 3-4" OF 1 12" WASHED ROCK MATERIAL11)ALL PARK/OPEN SPACE SIGNAGE TO BE PER PARKS DIVISIONS SPECIFICATIONS ANDFURNISHED AND INSTALLED BY THE PARKS DIVISION.SYMBOL QTY DESCRIPTION18 MOSS ROCK BOULDERS-3' MIN. DIAM.1 RECTANGLE PICNIC TABLESEE SHEET L2014 OCTAGON PICNIC TABLESEE SHEET L2017 DOG WASTE STATIONSEE SHEET L2015 WASTE RECEPTACLESEE SHEET L2019 BENCHSEE SHEET L201PARK AMENITIESIRRIGATION GENERAL NOTES1) THIS IRRIGATION PLAN IS CONCEPTUAL IN NATURE AND FINAL DESIGN SHALL BE VERIFIED BY IRRIGATION CONTRACTOR TO INSURE PROPER INSTALLATION2) IRRIGATION SYSTEM SHALL BE DESIGNED AND INSTALLED BY A PROFESSIONAL IRRIGATION CONTRACTOR PER THE REQUIREMENTS BELOW.3) A BACKFLOW PREVENTER SHALL BE PROFESSIONALLY INSTALLED AS PER THE CITY OF BOZEMAN REQUIREMENTS.4) A PRESSURE RELEASE VALVE/REGULATOR MAY BE NEEDED DEPENDING ON THE PSI AT POC5) IRRIGATION POINT OF CONNECTION WILL BE FROM WELLS. PARK IRRIGATION SYSTEM AND WATER SOURCE IS TO BE SEPARATE FROM OPEN SPACE. FINAL WELL LOCATIONS TO BE DETERMINED WITH FINAL PLAT. IRRIGATION CONTROL CLOCKS SHALL BE MOUNTED IN CLOSE PROXIMITY TO WELL LOCATIONS.6) IRRIGATION CLOCK TO BE WEATHERMATIC SMARTLINE CONTROLLER OR APPROVED EQUAL7) IRRIGATION DESIGN ASSUMES 25-28GPM FROM WATER SOURCE8) CARE SHALL BE TAKEN TO ENSURE IRRIGATION SYSTEM IS INSTALLED PROPERLY TO MINIMIZE/ELIMINATE WATER WASTE DUE TO OVER SPRAY ONTO WALKS AND OTHER NON-PERMEABLE SURFACES.9) IRRIGATION CONTRACTOR SHALL INSTALL A RAINBIRD (OR SIMILAR) RAIN SENSOR THAT WILL AUTOMATICALLY TURN OFF THE SYSTEM DURING RAIN EVENTS10) MPR NOZZLES OR SIMILAR SHALL BE INSTALLED TO MAXIMIZE EFFICIENCY ON ALL TURF AREAS11) ALL TREES AND SHRUBS TO RECEIVE HIGH EFFICIENCY DRIP IRRIGATION. DRIP ZONES SHALL HAVE 5 GALLON EMITTERS TO TREES, 2 GALLON EMITTERS TO ALL SHRUBS AND 1 GALLON EMITTERS TO ALL PERENNIALS AND ORNAMENTAL GRASSES11) WETLAND MITIGATION PLANTS TO BE NON-IRRIGATED.12) THE SIZE OF EMITTER MAY BE REDUCED FOR HEAVY CLAY SOILS TO MINIMIZE OVER WATERING DEPENDING ON SOIL CONDITIONS.BOZEMAN U.D.O. REQUIREMENTS15 POINTS REQUIRED:~5 POINTS-EAST YARD LANDSCAPING OF OPEN SPACE. 5 PLANT GROUPS REQUIRED WITH 5 GROUPS PLUS ADDITIONALORNAMENTAL TREE SHOWN~5 POINTS-WEST YARD LANDSCAPING OF OPEN SPACE. 5 PLANT GROUPS REQUIRED WITH 5 GROUPS SHOWN PLUSADDITIONAL 5 SHRUBS, 10 NON-CANOPY TREES AND 1 LARGE EVERGREEN TREE.~2 POINTS FOR 1% OF LOT AREA COVERED BY PUBLICLY ACCESSIBLE PICNIC/BBQSEATING AREA AND RECREATION AREA~3 POINTS FOR MOSS ROCK BOULDERS INSTALLED LARGER THAN 3' DIAMETER.BOULEVARD TREES:~1 TREE SHOWN FOR EVERY 50 LINEAR FEET OF PARK STREET FRONTAGE50' WATERCOURSE SETBACK:~1,236 LF WATERCOURSE: 41 NATIVE RIPARIAN TREES AND 124 SHRUBS SHOWN IN ZONE 1 WITH A NATIVE SEED MIX~ZONE 2 PLANTED WITH UPLAND FESCUE SEED MIXPARKING LOT LANDSCAPING~16 PARKING SPACES. 1 REQUIRED TREE FOR 9 SPACES.1 LARGE CANOPY TREE SHOWN~10 POINTS FOR PARKING LOT LANDSCAPING. 1 PLANT GROUP SHOWN PLUS 1 NON CANOPY TREE AND ADDITIONAL SHRUB PLANTINGS.~4' SCREENING SHOWN ALONG ADJACENT RESIDENTIAL LOTWETLAND MITIGATION:SEE SHEETS L102 & L103OWNERNorton Properties, LLC63026 NE Lower Meadows Dr. #200Bend, OR 97701-5877IRRIGATION CALCULATIONSTHIS ESTIMATE ASSUMES THE SPRINKLER CONTROLLER IS PROGRAMMED CORRECTLY AND ASSUMESA 3 TIME A WEEK IRRIGATION SCHEDULE. 36,971 SQFT OF TURF AREA. ESTIMATED 88,730GALLONS PER MONTH OUT OF ALL SPRAY/LAWN ZONES. 12,708 GALLONS USED IN THE DRIP ZONESFOR THE TREES/SHRUBS AND GRASSES.TOTAL ESTIMATED 101,438 GALLONS PER MONTH USED4TRAIL TOTEM SIGNSEE SHEET L201 15PARK BOUNDARY SIGNSEE NOTES4TRAIL POST SIGNSEE SHEET L201SYMBOL QTY DESCRIPTIONPARK SIGNS1PARK NAME SIGNTO BE DETERMINEDSEED MIX QTY DESCRIPTION LAWN 60% Kentucky Bluegrass 25% Perennial Ryegrass 15% Creeping Red Fescue Circle S Seed: ABC Lawn Mix Drill seed 4-5lbs/1,000 Sq. Ft. Broadcast Seed 8-10lbs/1,000 Sq. Ft. SEED MIX 2 35% Durar Hard Fescue 35% Sheep Fescue 15% Turf-Type Tall Fescue 15% Canada Bluegrass Circle S Seed: Rough Mix Drill seed 10-15lbs/Acre Broadcast Seed 20-30lbs/Acre SEED MIX 3 25% Slender Wheatgrass 10% Western Wheatgrass 10% Thickspike Wheatgrass 13% Mountain Brome 15% Nevada Bluegrass 25% Bluebunch/Snake River Wheatgrass 2% Blue Flax Circle S Seed: Native Mix Drill seed 8-10lbs/Acre Broadcast Seed 16-20lbs/Acre WETLAND SEED MIX 40% Tall Fescue 30% Slender Wheatgrass 10% Garrison Creeping Foxtail 10% Alsike Clover 5% Western Wheatgrass 5% Tufted Hairgrass Circle S Seed: Wetland Pasture Mix Drill seed 4-5lbs/1,000 Sq. Ft. Broadcast Seed 8-10lbs/1,000 Sq. Ft.SEED MIX QTY DESCRIPTION33,254SF36,971SF32,233SF59,369SFUPDATED WETLAND DELINEATION AREA (2018)LAUR
E
L
P
A
R
K
W
A
Y BLUE LAGOON LANEBOOMTOWN RD.S. EL DORADO AVE.S. EL DORADO AVE.WESTGATE AVE.S. RELIANCE AVE.
GOOSEBERRY DR.W. BABCOCK STREETSEE SHEET L104SEE SHEET L101SEE SHEET L102SEE SHEET L101SEE SHEET L102SEE SHEET L102SEE SHEET L103NProject For:
Norton Ranch Phase 5 ParksOVERALLPARKPLANL1004/20/18For ReviewDate Issue3084 Thorpe RoadBelgrade, Montana 59714Ph 406.924.8038alyssa@redbarnmontana.comRETENTIONPONDPLAYGROUNDWETLANDOPEN SPACELINEAR PARKAND PATHWAYLINEAR PARKAND PATHWAYOPEN SPACE/PATHWAYPARK SPACEPARKINGLOTSEE SHEET L102SEE SHEET L10350'50'50'50'WATERCOURSESETBACKAAJKER CREEK
SCALE: 1"=30'-0"OPEN SPACE/PATHWAY4/27/18City Submittal4/27/18City Submittal8/13/19City Submittal9/17/19City Submittal50'WATERCOURSESETBACKW.C.ZONE 1W.C.ZONE 2W.C.ZONE 1W.C.ZONE 2VAUGHN DRIVEWOONERF
4/21/20City SubmittalPARKLAND DEDICATION TABLELINEAR OPENSPACE ANDPATHWAYTOTAL PARK AREA:1.769 ACRESAREA W/IN RETENTION POND:0.785 ACRESPARKLAND DEDICATION AREA:0.984 ACRESWETLAND CONSERVATION AREA PARK SPACETOTAL PARK AREA: 5.618 ACAREA W/IN WETLAND: 1.678 ACRESPARKLAND DEDICATIONAREA: 3.940 ACRESBozeman, MTTOTAL LINEAR PARKAREA:1.351 ACRESAREA W/IN WATERCOURSESETBACK: 1.1 ACRESPARKLAND DEDICATIONAREA: 0.251 ACRES145
50'50'w4780478147824783478447854786478547864787478847894780
47804780
47854785 47864785478447834782WATERCOURSE SETBACKZONE 1ZONE 2LAWNLAWNSEED MIX 2RETENTION PONDPOND BAYPOND BAYWETLAND SEED MIXLAWN10' CLASS 1 ASPHALT PATH6' CLASS 11 GRAVEL PATH6' CONCRETE PATHSEED MIX 3SEED MIX 2SEED MIX 3SEED MIX 2CLIMBINGBOULDERPROPOSEDIRRIGATIONWELLBENCH, TYP.DOG WASTESTATION, TYP.FOOT BRIDGE,TYP.BENCH, TYP.BENCH AND WASTERECEPTACLE, TYP.6' CLASS I1 GRAVEL PATHWATERCOURSESETBACK ZONE 1TREE AND SHRUBPLANTINGSEDGE OFSTREAMBANKEDGE OFSTREAMBANKPATH CONNECTION TO LAKES SUBDIVISION50' WATERCOURSESETBACKASPHALTPATH TOMATCHEXISTING.TRAIL TOTEMPARK BOUNDARYSIGN, TYP.BIKE RACKS. EL DORADO AVE.S. EL DORADO AVE.WESTGATE AVE.SEE SHEET L104SEE SHEET L102
NProject For:
Norton Ranch Phase 5 Parks
Bozeman, MTRETENTIONPOND PARKAND LINEARPARK PLANL1014/20/18For ReviewDate Issue3084 Thorpe RoadBelgrade, Montana 59714Ph 406.924.8038alyssa@redbarnmontana.comCLIMBING BOULDERMANUFACTURED BY:NICROS, INC.845 PHALEN BLVD.SAINT PAUL, MN 55106WWW.NICROS.COMPH: 1-800-699-1975CLIMBING BOULDER1L101AAJKER CREEK
SCALE: 1"=30'-0"4/27/18City Submittal8/13/19City Submittal9/17/19City Submittal4/21/20City Submittal146
AeccDbCogoPoint (A
e
c
c
L
a
n
d
12
0
)
AeccDbCogoP
o
i
n
t
(
A
ec
c
L
a
n
d
1
2
0)4780478147824783478447854787478
64786478547844785
WETLANDWETLAND CONSERVATION EASEMENTWETLAND CONSERVATION EASEMENTSEED MIX 2SEED MIX 2UNDISTURBEDWETLANDUNDISTURBEDWETLANDCONSERVATIONEASEMENT AREAORIGINALDELINEATEDWETLANDORIGINAL DELINEATEDWETLANDSEED MIX 26' CONCRETE PATH6' CONCRETE PATH6' CLASS I1 GRAVEL PATHPATH CONNECTION TO THE LAKES SUBDIVISION2018 WETLANDDELINEATION2018 WETLANDDELINEATIONRETENTION PONDTRAIL POST SIGNPARK BOUNDARYSIGN, TYP.DISTURBED AREASALONG ROADWAYTO BE SEEDED WITHNATIVE SEED MIXTRAIL TOTEMDOG WASTE STATIONDECIDUOUS TREESQTYBOTANICAL / COMMON NAMECONTCALSIZEMATURE SIZEDROUGHT TOLERANT24Populus balsamifera trichocarpa / Black Cottonwood10 gal50-100`No29Populus tremuloides / Quaking AspenB & B1.5"Cal35`-45`No16Populus tremuloides / Quaking AspenB & BClump35`-45`NoSHRUBSQTYBOTANICAL / COMMON NAMESIZEMATURE SIZEDROUGHT TOLERANT17Amelanchier alnifolia / Serviceberry5 gal10-15`Yes57Cornus sericea `Isanti` / Isanti Redosier Dogwood5 gal5`-6`No48Ribes aureum / Golden Currant5 gal5`-6`Yes33Salix bebbiana / Bebb's Willow5 gal10-15`No31Salix drummondiana / Drummond`s Willow5 gal6-12`No27Symphoricarpos albus / Common White Snowberry5 gal4`-5`YesPLANT SCHEDULE WETLAND MITIGATIONWETLAND DELINIATION:-SHRUBS AND TREE QUANTITIES HAVE BEEN DETERMINED SIMILAR TO THE WATERCOURSE SETBACK-1 TREE PER 30 LF AND 1 SHRUB PER 10 LF WITHIN A 30' ZONE ARE DISPERSED ACROSS THE WETLAND AREA814 LF: 27 TREES, 81 SHRUBS772 LF: 26 TREES, 77 SHRUBS390 LF: 13 TREES, 39 SHRUBS-ANY WETLAND AREAS DISTURBED BY CONSTRUCTION ARE TO BE SEEDED WITH WETLAND SEED MIX-ALL OTHER DISTURBED AREAS SUCH AS BY TRAIL CONSTRUCTION IN THE WETLAND CONSERVATION EASEMENT TOBE SEEDED WITH NATIVE SEED MIX (SEED MIX 3)-SEE SHEET L100 FOR PARK AND OPEN SPACE PLANT SCHEDULE***SMALLER CONTAINER SIZE MAY BE SUBSTITUTED FOR TREES AND SHRUBS. MINIMUM 1" CAL. OR 7 GALLONCONTAINER FOR TREES AND 2 GALLON CONTAINERS FOR SHRUBSSCALE: 1"=30'-0"S. EL DORADO AVE.WESTGATE AVE.SEE SHEET L101 S. RELIANCE AVE.
SEE SHEET L103 GOOSEBERRY DR.NProject For:
Norton Ranch Phase 5 Parks
Bozeman, MTOPEN SPACE&WETLANDSPARK PLANSL1024/20/18For ReviewDate Issue3084 Thorpe RoadBelgrade, Montana 59714Ph 406.924.8038alyssa@redbarnmontana.com4/27/18City Submittal8/13/19City Submittal9/17/19City SubmittalSEE SHEET L103VAUGHN DRIVE4/21/20City Submittal147
479047894788478947904790 47884785
WETL
A
N
D
C
O
N
S
E
R
V
A
T
I
O
N
E
A
S
E
M
E
N
T WETLAND CONSERVATION EASEMENTSEED MIX 2SEED MIX 3WETLANDUNDISTURBEDWETLANDCONSERVATIONEASEMENT AREALAWNORIGINALDELINEATEDWETLAND5' CONCRETE WALKWAY6' CLASS I1 GRAVEL PATH6' CLASS I1 GRAVEL PATHPLAY STRUCTUREGRAVELSEED MIX 32018 WETLANDDELINEATION2018 WETLANDDELINEATIONLAWNSNOWSTORAGETRAIL POSTSIGNPARK BOUNDARYSIGN, TYP.PARK BOUNDARYSIGN, TYP.DOG WASTE STATIONBIKE RACKDISTURBED AREASALONG ROADWAYTO BE SEEDED WITHNATIVE SEED MIXTRAIL TOTEMWETLAND AREASDISTURBED BYROADWAY TO BERESEEDED W/WETLAND SEED MIXPARKINGLOTPARK NAME SIGN, TBD.DECIDUOUS TREESQTYBOTANICAL / COMMON NAMECONTCALSIZEMATURE SIZEDROUGHT TOLERANT24Populus balsamifera trichocarpa / Black Cottonwood10 gal50-100`No29Populus tremuloides / Quaking AspenB & B1.5"Cal35`-45`No16Populus tremuloides / Quaking AspenB & BClump35`-45`NoSHRUBSQTYBOTANICAL / COMMON NAMESIZEMATURE SIZEDROUGHT TOLERANT17Amelanchier alnifolia / Serviceberry5 gal10-15`Yes57Cornus sericea `Isanti` / Isanti Redosier Dogwood5 gal5`-6`No48Ribes aureum / Golden Currant5 gal5`-6`Yes33Salix bebbiana / Bebb's Willow5 gal10-15`No31Salix drummondiana / Drummond`s Willow5 gal6-12`No27Symphoricarpos albus / Common White Snowberry5 gal4`-5`YesPLANT SCHEDULE WETLAND MITIGATIONSEED MIX QTY DESCRIPTION LAWN 60% Kentucky Bluegrass 25% Perennial Ryegrass 15% Creeping Red Fescue Circle S Seed: ABC Lawn Mix Drill seed 4-5lbs/1,000 Sq. Ft. Broadcast Seed 8-10lbs/1,000 Sq. Ft. SEED MIX 2 35% Durar Hard Fescue 35% Sheep Fescue 15% Turf-Type Tall Fescue 15% Canada Bluegrass Circle S Seed: Rough Mix Drill seed 10-15lbs/Acre Broadcast Seed 20-30lbs/Acre SEED MIX 3 25% Slender Wheatgrass 10% Western Wheatgrass 10% Thickspike Wheatgrass 13% Mountain Brome 15% Nevada Bluegrass 25% Bluebunch/Snake River Wheatgrass 2% Blue Flax Circle S Seed: Native Mix Drill seed 8-10lbs/Acre Broadcast Seed 16-20lbs/Acre WETLAND SEED MIX 40% Tall Fescue 30% Slender Wheatgrass 10% Garrison Creeping Foxtail 10% Alsike Clover 5% Western Wheatgrass 5% Tufted Hairgrass Circle S Seed: Wetland Pasture Mix Drill seed 4-5lbs/1,000 Sq. Ft. Broadcast Seed 8-10lbs/1,000 Sq. Ft.SEED MIX QTY DESCRIPTION33,254SF36,971SF32,233SF59,369SFUPDATED WETLAND DELINEATION AREA (2018)WETLAND DELINIATION:-SHRUBS AND TREE QUANTITIES HAVE BEEN DETERMINED SIMILAR TO THE WATERCOURSE SETBACK-1 TREE PER 30 LF AND 1 SHRUB PER 10 LF WITHIN A 30' ZONE ARE DISPERSED ACROSS THE WETLAND AREA814 LF: 27 TREES, 81 SHRUBS772 LF: 26 TREES, 77 SHRUBS390 LF: 13 TREES, 39 SHRUBS-ANY WETLAND AREAS DISTURBED BY CONSTRUCTION ARE TO BE SEEDED WITH WETLAND SEED MIX-ALL OTHER DISTURBED AREAS SUCH AS BY TRAIL CONSTRUCTION IN THE WETLAND CONSERVATION EASEMENT TOBE SEEDED WITH NATIVE SEED MIX (SEED MIX 3)-SEE SHEET L100 FOR PARK AND OPEN SPACE PLANT SCHEDULE***SMALLER CONTAINER SIZE MAY BE SUBSTITUTED FOR TREES AND SHRUBS. MINIMUM 1" CAL. OR 7 GALLONCONTAINER FOR TREES AND 2 GALLON CONTAINERS FOR SHRUBSGOOSEBERRY DR.
LAUR
E
L
P
A
R
K
W
A
Y
NProject For:
Norton Ranch Phase 5 Parks
Bozeman, MTPLAYGROUNDANDWETLANDSPARKL1034/20/18For ReviewDate Issue3084 Thorpe RoadBelgrade, Montana 59714Ph 406.924.8038alyssa@redbarnmontana.comSCALE: 1"=30'-0"MANUFACTURED BY:LANDSCAPE STRUCTURES601 7TH ST. SOUTH-PO BOX 198DELANO, MN 555328WWW.PLAYLSI.COMPH: 888-438-6574PLAYSENSE PLAY STRUCTUREDESIGN 402MODEL # 176165PLAN VIEWPLAY STRUCTURE1L1033D VIEWSEE SHEET L102SEE SHEET L1024/27/18City Submittal8/13/19City Submittal4/21/20City Submittal148
50'47874788 478847894790479147924793479447934790ZONE 1ZONE 210' CLASS 1 ASPHALT PATHWATERCOURSE SETBACK 10' CLASS 1 ASPHALT PATHSEED MIX 3SEED MIX 2DOG WASTESTATION, TYP.BENCH, TYP.WATERCOURSESETBACK ZONE 1TREE AND SHRUBPLANTINGSEDGE OFSTREAMBANKNO TREES SHOWNDUE TO POTENTIALROAD EXPANSION50'WATERCOURSESETBACKASPHALTPATH TOMATCHEXISTING.TRAIL POST SIGNTRAIL TOTEMWESTGATE AVE.BOOMTOWN RD.S.EL DORADO AVE.SEE SHEET L101SCALE: 1"=30'-0"NProject For:
Norton Ranch Phase 5 ParksLINEARPARK SPACEPLANL1044/20/18For ReviewDate Issue3084 Thorpe RoadBelgrade, Montana 59714Ph 406.924.8038alyssa@redbarnmontana.comAAJKER CREEK
Bozeman, MT4/27/18City Submittal8/13/19City Submittal9/17/19City Submittal4/21/20City Submittal149
STAKE WITH 2" WOOD TREESTAKES AND RUBBER STYLE TIES.PROVIDE SLACK IN LINE TIES.STAKES SHALL NOT PENETRATEROOT BALL.MULCH AS SPECIFIED. PULLMULCH AWAY FROM TRUNK.TREE IS TO BE PLANTED SLIGHTLY HIGHERTHAN GRADE WITH THE TREE COLLAREXPOSED1. CREATE A SAUCER AROUND TREES TO RETAIN IRRIGATION WATER.NOTES:USE PROPER PRUNINGTECHNIQUES TO REMOVE DEADOR BROKEN LIMBS, ANDCOMPETING APICAL LEADERSEXCAVATE HOLE:WIDTH = 3 x DIA. OF ROOTBALLDEPTH = HEIGHT OF ROOTBALL + 6" MIN.FINISH GRADEEDGINGAMENDED TOPSOIL BACKFILL.OVEREXCAVATE TREE WELL & PROVIDE 6"MIN. COMPACTED PLANTING SOILUNDER TREE BALL AS SHOWN1. SHRUBS TO BE PLANTED TO BEAR THE SAME RELATION TO FINISH GRADE ASORIGINALLY GROWN IN THE NURSERY.NOTES:EXCAVATED HOLE 2X DIAMETEROF ROOTBALLBACKFILL WITH AMENDED TOPSOILREMOVE ROOTCONTAINMENTMATERIALS IFPRESENTMULCH -PULL MULCHAWAY FROM STEM. MULCH3" MIN.CREATE SAUCERAROUND SHRUBPRUNE SHRUB TOREMOVE DEAD ORDAMAGED BRANCHES.U-RACK CLASSICPOWDER COATEDSURFACE MOUNT4-1/2"22.100(REF)36"(OAH)1.900 ||DIA(NOM)2-1/26"SLOPE NOT TO EXCEED 4:1NATIVE TREE AND SHRUB PLANTINGS ONUPPER EDGES OF GRADERIPARIAN SEED MIX IN BOTTOM ANDUP SIDES OF RETENTION PONDSEE PLANT LEGENDNATIVE SEED MIX ON UPPER EDGES OF GRADESEE PLANT LEGENDNProject For:
Norton Ranch Phase 5 ParksPARK &OPEN SPACEAMENITIES& DETAILSL2014/20/18For ReviewDate Issue3084 Thorpe RoadBelgrade, Montana 59714Ph 406.924.8038alyssa@redbarnmontana.comBENCH1L201OCTOGAN PICNIC BENCH2L201WASTE RECEPTACLE3L201DOG WASTE STATION8L201WABASH VALLEYMODEL # SGP686' SIGNATURE SERIES BENCHINGROUND MOUNT, BLUE,DIAMOND PATTERNWABASH VALLEYMODEL # SG145PSIGNATURE SERIES46" OCTAGON PICNIC TABLESURFACE MOUNT, GREEN,DIAMOND PATTERNWABASH VALLEYMODEL # LR350D AND #DT100N32 GALLON WASTE RECEPTACLEAND DOME TOP LIDGREEN, DIAMOND PATTERNSURFACE MOUNTDOG-ON-IT-PARKS#7408R COMPLETE DOGWASTE STATION, GREENBozeman, MT4/27/18City Submittal8/13/19City SubmittalTREE PLANTING DETAIL9L201SHRUB PLANTING DETAIL10L2019/17/19City SubmittalRECTANGLE PICNIC BENCH4L201WABASH VALLEYMODEL # SG106P6' SIGNATURE SERIESPICNIC TABLESURFACE MOUNT, GREEN,DIAMOND PATTERNBIKE RACK5L201TRAIL MARKER SIGN6L201TRAIL TOTEM7L201NOTES:1.SURFACE MOUNT TO CONCRETE PAD2.INSTALL PER MANUFACTURERS SPECIFICATIONS3.RACKS TO BE SPACED 3' O.C. SEE PLAN FOR LAYOUTCYCLESAFE: 888-950-6531MODEL # U/2 RACKSURFACE MOUNTPOWDER COATED BLACKNOTES:1.PARKS DIVISION TO PROVIDE AND INSTALL POSTSAND SIGNS.2.POSTS TO BE 8' TALL WITH BOTTOM 3' BURIED.3.POSTS TO BE PRESSURE TREATED WOOD, NOCONCRETE FOOTINGS.NOTES:1.PARKS DIVISION TO PROVIDE AND INSTALLPOSTS AND SIGNS.2.10" X 10" TOTEMS TO BE CHEMICALLY TREATED ON BOTTOM HALF PER PARKS DIVISION SPECS.4/21/20City SubmittalRETENTION POND SECTION11L201150