HomeMy WebLinkAbout10--Construction Timeline 10-12-2020
Construction Information and Timeline
Contractor:
R & R Taylor Construction Inc
1775 Love Ln, Bozeman, MT 59718
R&R Taylor is an established and reputable contractor in the Gallatin Valley that has successfully
completed a multitude of historic projects. They are used to working in the Downtown Corridor and are
experienced at minimizing construction impacts on neighbors.
Below is a list of historic projects they have completed:
• Montana Hall East End ADA Improvements – Montana State University
o https://www.bozemandailychronicle.com/news/montana_state_university/iconic-
montana-hall-finally-getting-an-elevator-to-meet-ada/article_1d1efa23-4694-56aa-
90ee-3bb0696188a2.html
• Story Mansion – Renovation of the interior and exterior of Story Mansion
o https://friendsofthestory.org/
• Bannack Hotel and out Buildings – Restored the Bannack Hotel to its original condition
o http://bannack.org/about-us
• Old Faithful Cabins – Fixed the exterior and restored the interior of all the cabins near the Old
Faithful
o https://www.yellowstonenationalparklodges.com/lodgings/cabin/old-faithful-lodge-
cabins/
• Hamilton Hall Montana State University
o https://www.montana.edu/calendar/locations.php?building=20&ref=map
• Powder Horn Building Renovation
o https://www.bozemandailychronicle.com/news/economy/schnee-s-and-powder-horn-
to-merge-retail-spaces-in-story-block-building/article_85594fd4-489f-11e1-9909-
0019bb2963f4.html
• Berg Law Firm Remodel – Currently Under Renovation fixing up the Exterior to the original look.
o https://www.berglilly.com/
• Donaldson Hall – Havre MT
o https://www.msun.edu/aboutmsun/history/donaldson.htm
2 of 2
Timeline:
Construction will take approximately 8-14 months and will begin as soon as April 2021