Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
015 A301 EXTERIOR ELEVATIONS 4-PLEX 8-21-20
T.O. FIRST 0' -0" T.O. SECOND 10' -1 3/4" T.O.W. FIRST 9' -1 1/8" T.O.W. SECOND 19' -2 7/8" VINYL WINDOW (BLACK) ARCHITECTURAL GRADE ASPHALT SHINGLES (DK. GRAY) RAINSCREEN (SEMI -TRANSPARENT BROWN) CONT. RIDGE VENT T.O. ROOF 30' -8" 2 A400 10 12 10 12 10 12 10 12 LAP SIDING (WHITE) RAINSCREEN (SEMI -TRANSPARENT BROWN) LAP SIDING (WHITE) LAP SIDING (WHITE) STEEL RAILING (BLACK) E 211 E F F FF E111 E E 223 E E123 E T.O. FIRST 0' -0" T.O. SECOND 10' -1 3/4" T.O. FND. 0' -0" T.O.W. FIRST 9' -1 1/8" T.O.W. SECOND 19' -2 7/8" OPEN OPEN VINYL WINDOW (BLACK) LAP SIDING (WHITE) ARCHITECTURAL GRADE ASPHALT SHINGLES (DK. GRAY) RAINSCREEN (SEMI -TRANSPARENT BROWN) CONT. RIDGE VENT T.O. ROOF 30' -8" 3 A400 CONT. RIDGE VENT 1 A400 6 12 6 12 ELEC. METERS GAS METERS A D A D G G G G B B TRANSPARENCY CALCULATIONS ALONG SOUTHBRIDGE TOTAL FACADE: 2064 S.F. TOTAL TRANS.: 660 S.F. PERCENT TRANS. 32% ALONG SOUTH 19TH TOTAL FACADE: 3224 S.F. TOTAL TRANS.: 904 S.F. PERCENT TRANS.: 28% STATUS: JOB NO.: CHECKED: DRAWN: Copyright © 2020 71 9 W . M E N D E N H A L L S T . BO Z E M A N M O N T A N A 5 9 7 1 5 PH O N E : 4 0 6 - 5 5 6 - 8 0 8 0 FA X : 4 0 6 - 5 8 5 - 1 6 7 7 JE S S E @ J D S A R C H I T E C T S B O Z E M A N . C O M JD S A R C H I T E C T S B O Z E M A N . C O M SO U T H B R I D G E D R I V E & S O U T H 1 9 T H A V E . BO Z E M A N , M O N T A N A 8/21/2020 Author Checker 19-072 PRELIMINARY A301 SO U T H B R I D G E L I V I N G - 4 P L E X EXTERIOR ELEVATIONS 1/4" = 1'-0" A301 1 SOUTH ELEVATION 1/4" = 1'-0" A301 2 WEST ELEVATION ARCTIC WHITE SEMI -TRANSPARENT BROWN RAINSCREEN CHARCOAL SHINGLES GRAY R E V I S I O N S C H E D U L E N O : D E S C R I P T I O N : D A T E : B Y :