Loading...
HomeMy WebLinkAbout030-Cottonwood_Ida--L1.01-Take-Off Plan-2019.01.25SP1 Submittal 01-17-2019 12 - 2 0 - 2 0 1 8 TAKE-OFF PLAN L1.01 1” = 20’-0” 1” = 20’-0” 1” = 20’-0” TAKE-OFF PLAN 1. Landscape Area: 25,150 SF 2. Hardscape Area: 33,100 SF • City Standard Concrete: 8,275 SF • Integral Color Concrete Paving: 6,620 SF • Stone Paving: 14,520 SF • Concrete Unit Pavers: 3,685 SF Total Site Area: 58,250 SF 1. Reclaimed Sidewalk: 142’-2”LF (4” wide) 2. Gabion Benches: 190’-9” LF (18” wide, cobble reclaimed onsite) 3. C.I.P. Benches: 90’-10” LF (18” wide, Finish: Light Sandblast) Total Bench Length: 423’-9” LF 1. Concrete: 201’-7” LF (8” wide) 2. Concrete: 33’-6” LF (18” wide) Total Wall Length: 235’-1” LF