Loading...
HomeMy WebLinkAbout043 C&I--L4.01-Landscape Stormwater Plan 4-18-19Final PUD Submittal 04-18-2019 03 - 0 4 - 2 0 1 9 1” = 20’-0” STORMWATER PLAN STORM- WATER PLAN L4.01 1” = 20’-0” EVA Passage Pervious Pavers: 6,100 SF French Drain System: 140 SF (at grade) (See Civil Drawings) Subsurface Chamber: 2,500 SF (See Civil Drawings) Total Area Provided: 8,740 SF OVERLAND FLOW ASPEN ST. COTTONWOOD ST. ID A S T .