HomeMy WebLinkAboutAppendix N NorthWestern Energy Letter of Encroachment Cottonwood-Ida 2-5-2018 NorthWesteni Derek Westveer ion 121 East Griffin Drive
New Construction P.O.Box 490
Engineer Bozeman,MT 59771-0490
Office:(406)582-4627
Enerffv Cell:(406)581-3987
Fax:(406)585-9634
February 5th, 2019
To whom it concerns,
NorthWestern Energy has discussed the encroachment issue for building 1 & 6 along East Aspen for the
Cottonwood & Ida project on 1-29-2019 with Erik Nelson, ThinkTank, in our office here on 121 E Griffin Drive,
Bozeman, Montana 59715. We the utility understand that the 15 foot 6 inch high by 2 foot 6 inch wide
encroachment(s)affects the 10 foot utility easement along the north side of the property.
After discussion with Erik, we have no issue with allowing this encroachment to occur. The current and future
utility plan is for an all underground installation. Should the dimensions of the encroachment and or locations
change, this letter no longer is valid by NorthWestern Energy agreeing to any encroachment(s). In addition, we
are one of many utilities that could potentially be in this easement. All other relevant utilities must be contacted
separately for approval.
Sincerely,
fu
Derek Westveer
New Construction Engineer
Northwestern Energy
Cell:406-581-3987
Office:406-582-4627