HomeMy WebLinkAboutApp. G. - Master Park Plan Write-Up 08-20-2020Norton Ranch Subdivision, Phase 5A
Master Park Plan
August 2020
Prepared For:
Norton Properties, LLC
63026 NE Lower Meadow Drive #200
Bend, OR 97701-5877
Prepared By:
With:
C&H Engineering and Surveying
Norton Ranch Subdivision, Phase 5 August 2020
Park Master Plan
50'
50'WATERCO
U
RSE SETBACK
ZONE 1ZONE 2
ZONE 1ZONE 2
50'
LAWN
LAWN
SEED MIX 2
RETENTION POND
POND BAY POND BAY
WETLAND
WETLAND CONSERVATION EASEMENTWETLAND C
O
N
S
E
R
VATION EASEMENTWETLAND CONSERVATIO
N
E
A
S
E
M
E
N
Tw
SEED MIX 2 SEED MIX 2
SEED MIX 2
SEED MIX 2
6' CLASS 11 GRAVEL PATH
6' CLASS 11 GRAVEL PATH
5' CONCRETE WALKWAY
SEED MIX 3SEED MIX 2
SEED MIX 3SEED MIX 2
SEED MIX 3SEED MIX 2
CLIMBINGBOULDER
IRRIGATIONWELL
WETLAND
6' CLASS 11 GRAVEL PATH
BENCH, TYP.
DOG WASTESTATION, TYP.
BBQ
FOOT BRIDGE
WETLAND SEED MIX
DOG WASTESTATION, TYP.
BENCH, TYP.
LAWN
BENCH AND WASTERECEPTACLE, TYP.
6' CLASS I1 GRAVEL PATH
PICNIC AREA
WATERCOURSESETBACK ZONE 1TREE AND SHRUBPLANTINGS
6' CLASS I1 GRAVEL PATH
UNDISTURBEDWETLANDCONSERVATIONEASEMENT AREA
UNDISTURBEDWETLANDCONSERVATIONEASEMENT AREA
WATERCOURSESETBACK ZONE 1TREE AND SHRUBPLANTINGS
LAWN
EDGE OFSTREAMBANK
EDGE OFSTREAMBANK
EDGE OFSTREAMBANK
NO TREES SHOWNDUE TO POTENTIALROAD EXPANSION
PATH CONNECTION TOTHE LAKES SUBDIVISION PATH CONNECTION TO THE LAKES SUBDIVISION
6' CLASS I1 GRAVEL PATHPLAY STRUCTURE
GRAVEL
10' CLASS 1 ASPHALT PATH
10' CLA
S
S
1
A
S
P
H
ALT PATH
WATERCOURSE SETBACK
PATH CONNECTION TO LAKES SUBDIVISION
50' WATERCOURSESETBACK
DELINEATEDWETLAND
DELINEATEDWETLAND
10' CLASS 1 ASPHALT PATH50'WATERCOURSESETBACK
N
Project Location
Norton Ranch Phase 5 is located north of West Babcock Street and south of the Lakes Subdivision, currently
under development. Farmland borders the west edge of the subdivision with Aajker Creek running parallel just
outside of the Norton Ranch property line. The east edge of the development is bordered by existing wetlands
to be protected and farmland. Laurel Parkway Road will be extended from West Babcock north to The Lakes
Subdivision.
Vicinity Map
THE LAKES SUBDIVISION EXISTING
PLAYGROUND
EXISTING
NORTON RANCHPLAYGROUND
NORTON RANCH
NEIGHBORHOODCENTER
WEST BABCOCK ST.
2
PROJECT
LOCATION
Norton Ranch Subdivision, Phase 5 August 2020
Park Master Plan
Project Scope
The Norton Ranch Phase 5 Master Park Plan is comprised of a variety of park and open space including a
linear lark with multi-use pathway and large wetland conservation area.
Parkland Goals:
The parkland goals have been developed to conform with the City of Bozeman’s long range park plan:
• Provide access to parkland from all residential lots and surrounding neighborhoods
• Provide parking for visitors
• Provide areas for socialization, active and passive recreation and play opportunities for children
• Minimize impact to existing Wetlands and watercourse as well as retaining native and natural
drainage corridors
• Provide connections to link Norton Ranch Phase 5 with outerlying subdivisions both existing
and proposed or under development.
• Utilize and enhance retention ponds as an amenity
• Minimize turf areas for water conservation
Parkland Components:
• Wetland Conservation area- A large portion of land at the northeast corner of the site is
protected and undeveloped by a conservation easement. A Class II gravel path will provide
access along the west edge of the wetlands. Wetlands west of Laurel Parkway have been mitigated with
native trees and shrubs.
• Playground- A play structure and small parking lot is proposed near the intersection of Laurel Parkway and
Boomtown Road.
• Retention Pond and Park-At the northwest corner of the park both active and passive
recreation is provided with lawn space, shade trees, walking paths, a climbing boulder and
picnic space. The retention pond is enhanced with groupings of native trees, shrubs and
boulders for naturalization.
• Linear Park and Pathway-A Class I asphalt path runs north to south providing a connection
between Norton Ranch South and The Lakes Subdivision. A majority of the linear park is
within the 50’ watercourse setback and will include native tree and shrub plantings as well as native grass.
• Open Space- Open space running west to east will be planted with a low maintenance grass
mix and a concrete pathway will provide pedestrian access.
3
Norton Ranch Subdivision, Phase 5 August 2020
Park Master Plan
Dedicated Parkland Table
4Phase Block Lot ZoningNet Res. Acreage (ac)Zoning Denisty for Parkland (DU/ac)# Dwelling Units (Zoning)# Dwelling Units (Actual)Parkland Requirement Based on Zoning (Acres)Parkland Requirement Based on Actual (Acres)CIL Park Requirement (Acres)Dedicated Parkland (Acres)Required Parkland (Acres)Overall Parkland (Acres)1 N/A PARKR‐4N/AN/AN/A0N/A0.0007.107.107.101 11R‐4N/AN/AN/A4N/A0.1200.00‐0.126.981 21R‐4N/AN/AN/A12N/A0.3600.00‐0.366.621 22R‐4N/AN/AN/A16N/A0.4800.00‐0.486.141 31R‐4N/AN/AN/A20N/A0.6000.00‐0.605.541 4 1 to 16 R‐4N/AN/AN/A16N/A0.4800.00‐0.485.061 5 1 to 10 R‐4N/AN/AN/A10N/A0.3000.00‐0.304.761 6 1 to 9 R‐4N/AN/AN/A9N/A0.2700.00‐0.274.492 1 1 to 10 R‐4N/AN/AN/A10N/A0.3000.00‐0.304.192 2 1 to 20 R‐4N/AN/AN/A20N/A0.6000.00‐0.603.592A N/A PARKR‐4N/AN/AN/A0N/A0.0001.001.004.592A 1 1 to 9 R‐4N/AN/AN/A9N/A0.2700.00‐0.274.322A 2 1 to 9 R‐4N/AN/AN/A9N/A0.2700.00‐0.274.052A 31R‐4N/AN/AN/A4N/A0.1200.00‐0.123.932A 32R‐4N/AN/AN/A4N/A0.1200.00‐0.123.812A 41R‐4N/AN/AN/A4N/A0.1200.00‐0.123.692A 42R‐4N/AN/AN/A4N/A0.1200.00‐0.123.572A 43R‐4N/AN/AN/A4N/A0.1200.00‐0.123.452A 44R‐4N/AN/AN/A4N/A0.1200.00‐0.123.332A 45R‐4N/AN/AN/A4N/A0.1200.00‐0.123.213A N/A PARKR‐3N/AN/AN/A0N/A0.0000.330.333.543A 1 1 to 7 R‐3N/AN/AN/A7N/A0.2100.00‐0.213.333A 18R‐30.14281N/A0.03N/A00.00‐0.033.293A 2 1 to 12 R‐3N/AN/AN/A12N/A0.3600.00‐0.362.933A 31R‐30.12581N/A0.03N/A00.00‐0.032.903A 3 2 to 8 R‐3N/AN/AN/A7N/A0.2100.00‐0.212.693A 4 1 to 12 R‐3N/AN/AN/A12N/A0.3600.00‐0.362.333A 57R‐3N/AN/AN/A1N/A0.0300.00‐0.032.303A 7 7 to 12 R‐3N/AN/AN/A6N/A0.1800.00‐0.182.123A 81R‐3N/AN/AN/A1N/A0.0300.00‐0.032.093B N/A PARKR‐3N/AN/AN/A0N/A0.0001.911.914.013B 5 1 to 6 R‐3N/AN/AN/A6N/A0.1800.00‐0.183.833B 6 1 to 6 R‐30.79386N/A0.19N/A00.00‐0.193.643B 6 7 to 12 R‐3N/AN/AN/A6N/A0.1800.00‐0.183.463B 7 1 to 6 R‐3N/AN/AN/A6N/A0.1800.00‐0.183.283B 8 2 to 7 R‐3N/AN/AN/A6N/A0.1800.00‐0.183.103C 3 9 to 16 R‐3N/AN/AN/A8N/A0.2400.00‐0.242.863C 8 8 to 14 R‐3N/AN/AN/A7N/A0.2100.00‐0.212.653C 9 1 to 7 R‐3N/AN/AN/A7N/A0.2100.00‐0.212.443C 10 1 to 8 R‐3N/AN/AN/A8N/A0.2400.00‐0.242.204 15 PARK R‐ON/A8N/A0N/A0.0000.820.823.02Apartments 4 11 1 to 4 R‐45.478844N/A1.31N/A00.00‐1.311.71Townhomes 4 12 1 to 9 R‐40.68986N/A0.17N/A00.00‐0.171.544 13 1 to 3 R‐O2.853823N/A0.68N/A00.00‐0.680.864 14 1 and 2 R‐O2.099817N/A0.50N/A00.00‐0.500.355A N/A WETLAND PARK R‐3N/A0N/A0N/A0.0003.943.944.295A N/A PARKR‐2N/A0N/A0N/A0.0000.980.985.275A N/A LINEAR PARK R‐2N/A0N/A0N/A0.0000.250.255.525A ALL ALLR‐25.974636N/A1.08N/A00.00‐1.084.205A ALL ALLR‐30.07681N/A0.02N/A00.00‐0.024.185B ALL ALLR‐23.635622N/A0.65N/A00.00‐0.653.525C ALL ALLR‐33.507828N/A0.84N/A00.00‐0.842.685D ALL ALLR‐21.47769N/A0.27N/A00.00‐0.272.425D ALL ALLR‐32.906823N/A0.70N/A00.00‐0.701.72Totals2636.487.890.0016.341.971.97EXCESS PARKLAND (after Phase 3C)1.19 acresEXCESS PARKLAND (after Phase 3B)2.20 acres EXCESS PARKLAND (after Ph. 4 Apartments and 9 Townhome Lots)1.54 acresEXCESS PARKLAND (after Phase 4)0.35 acresEXCESS PARKLAND (after Phase 5)1.97 acres
Norton Ranch Subdivision, Phase 5 August 2020
Park Master Plan
Parkland Amenities and Furnishings
Multiple benches are provided along the linear park, around the play spaces and at the retention pond for rest-
ing spots. Picnic tables are also located around play equipment. Waste receptacles are placed in high use areas
and along the linear path next to benches. Dog waste stations will be provided at key trail intersections and ends of trails for pet owner convenience. All site furnishings are to match the existing Norton Ranch develop-
ments with the same manufacturer, color and finishes.
The installation of additional furnishings, waste receptacles and dog waste stations not shown would be the
responsibility of the HOA, city of Bozeman or such other entity established at a later date to construct and build such improvements.
Site Furnishings Images
The Complete Dog Waste Station offers a dispenser, 11 gallon waste receptacle, a heavy duty, powdered coated steel post, 400 single pull style bags, 50 can liners, two keys and a sign. The dispenser and sign are screen printed for durability and the locks are keyed alike for easy maintenance and refills.
Top and Side Views:
7408S
COMPLETE
DOG WASTE
STATION –
ONEPUL™
A
Commercial grade,
powder coated
aluminum dispenser,
sign and receptacle
Color Options:
Green or Black
Square or Round 11
gallon receptacle
Dimensions:
72”H x 11.25”W
DOG-ON-IT-PARKS
4818 Evergreen Way Ste 250 Everett, WA 98203 P: 877-348-3647
www.dog-on-it-parks.com
Refer to installation manual for
more detailed specifications
Copyright 2016
5
Norton Ranch Subdivision, Phase 5 August 2020
Park Master Plan
Vegetation and Landscaping
All vegetation shall be quality nursery stock free from disease or damage. Species have been selected that are
hardy and suitable to our local climate.
Trees
A variety of canopy trees for shade, ornamental trees and evergreen trees are planned for visual appeal and
diversity of species throughout the development. All trees are subject to approval by the City of Bozeman
Forester. Tree sizes are to meet City of Bozeman size requirements and be varied for visual interest.
Recommended Tree List
Emerald Lustre Norway MapleNorthwood Maple
Skyline Honey Locust
Amur Chokecherry
Boulevard Linden
Discovery Elm
For Riparian and Watercourse Areas:
Quaking Aspen
Lanceleaf Poplar
Black Cottonwood
Shrubs
Shrubs used within the watercourse setback will be native species suited to riparian conditions to enhance the
existing streamway vegetation. A variety of species are used in natural groupings for visual interest. Native riparian shrubs are also to be used at the perimeter of the retention pond. The City Forester or planning depart-
ment will approve final selection for all woody plant material.
Recommended Shrub List (Riparian and Watercourse Areas)
Serviceberry
Golden Currant
Bebb’s Willow
Common White SnowberryRed Twig Dogwood
Grasses
Final grass seed mixes will be dictated by the construction documents. High Traffic park space areas and boule-
vard strips will have a bluegrass/fescue mix. Zone 1 of the watercourse setback will have a native seed mix and detention areas will be seeded with a riparian mix tolerant of wet conditions. All other areas will receive a very
low maintenance fescue mix to reduce irrigation. All areas disturbed by construction re to be properly prepared
and seeded.
6
Norton Ranch Subdivision, Phase 5 August 2020
Park Master Plan
Recommended Seed Mixes
ABC Lawn Mix -Circle S Seeds
Native Mix-Circle S Seeds
Wetland Pasture Mix-Circle S Seeds
Rough Mix-Circle S Seeds
Irrigation
All irrigation is to be off of wells within Norton Ranch. Park irrigation system and water source to be
separate from open space irrigation. Parkland lawn areas and boulevard strips are to receive spray/rotor
irrigation. Where applicable, MPR Nozzles or similar shall be installed to maximize efficiency at lawn areas.
All trees and shrubs are to receive high efficiency emitter drip irrigation. Rain sensors and a smart controller are
to be installed to eliminate water waste. Upon completion of installation, all warranty and maintenance infor-
mation, as well as well logs and pump warranties and information, if applicable, and an “as- built” map shall be
supplied to the City of Bozeman Parks Division and HOA.
Trails
The asphalt trail within the linear park shall be a Class 1 path at 120 inches in width. All other paths are to be
a Gravel Class 2 path at 72 inches in width. The trail through Open Space 5A, 5B & 5C is to be concrete.
Trail bed must be excavated a minimum of 6 inches deep, prior to installation of asphalt or gravel. All existing
organic material shall be completely removed from the proposed trail location and sub grade sterilized. Trail
must meet the original surface along both edges with a cross slope of 2% to provide for water drainage and meet
ADA requirements. Where terrain allows, slope of trail should not exceed 20:1 with a cross slope no greater
than 50:1 (2%) to provide for ADA accessibility. All damage to surrounding features and/or vegetation shall be
reclaimed immediately. Encroaching weeds, due to trail construction, shall be treated and controlled for a mini-
mum of 2 years after trail section is completed. All trails are to meet City of Bozeman Engineering Department
trail standards and specifications.
Trail Images
Class I Asphalt Path
7
Norton Ranch Subdivision, Phase 5 August 2020
Park Master Plan
Class II Gravel or Natural Fines Path
8
Norton Ranch Subdivision, Phase 5 August 2020
Park Master Plan
Class II Gravel or Natural Fines Path
9
Trail Details
Class I Asphalt Path
Norton Ranch Subdivision, Phase 5 August 2020
Park Master Plan
Playgrounds
Playgrounds shall be installed on Park land managed by the HOA/City of Bozeman. All playgrounds must
be approved by a Certified Playground Safety Inspector (CPSI) and meet ASTM F1487-01, CPSC and ADA
guidelines and specifications. Playgrounds shall be age appropriate, for area served, and be signed accordingly.
There shall be an adequate use zone area around equipment, approved material in use zone, which meets impact
attenuation criteria as specified in ASTM 1292, and adequate drainage. Use zones are to have a concrete border
to contain material. All installation plans, materials list, construction guidelines, maintenance information and
manufacturer’s name shall be supplied to the HOA/City of Bozeman’s Parks Division, upon completion of play-
ground installation. All work will be overseen and approved by a CPSI. No wooden structures will be approved.
Two playgrounds are located in Norton Ranch Phase 5. A 5-12 year old play structure with multiple play com-
ponents is proposed at the Southeast corner of the site with parking lot access as well as trail and sidewalk con-
nections for pedestrian access. A climbing boulder is also proposed for alternative play at the Northwest corner
of the site.
Existing playgrounds both north and south of Norton Ranch Phase 5 are also accessible by trail connections and
within walking or biking distance.
Playground Details
10
Norton Ranch Subdivision, Phase 5 August 2020
Park Master Plan
Playground Details
11
Norton Ranch Subdivision, Phase 5 August 2020
Park Master Plan
Maintenance
Responsible Party
The Declarant will be responsible for maintaining pathways, open space and parkland until 50 percent of the
lots are sold. At such time, the Association will take over maintenance.
The Association shall enter into an annual contract with a certified landscape contractor for upkeep and
maintenance. The Association will be responsible for park maintenance until such time a City Wide Park Main-
tenance district is created. The association shall be responsible for the maintenance of all open space/parks,
paths and trails, and adjacent sidewalks and landscaping in street boulevards. Maintenance will also include care
and replacement of playground equipment (CPSI approved) and/or site furnishings, replacement of dog waste
station bags and emptying of refuse containers. Any and all work and/or park fixtures must meet standards set
by the City Parks Division.
Trees and Shrubs
The trees shall be staked for the first 2 years to help stabilize, after 2 years stakes and fencing must be removed
to allow natural growth habit. Maintenance duties to be performed will consist of spring and fall clean up, care
and replacement of dead trees and/or shrubs. All tree trimming and pruning must be performed by a certified
arborist as outlined in City Ordinance 12.30.040 in coordination with Forestry Division. All trees on public
property are subject to City of Bozeman permits and ordinances.
Trails
Trails will be inspected regularly and receive routine patching and surface maintenance to prevent erosion or
unsafe conditions. Weeds on or near the trails well be controlled following City of Bozeman standards, set by
the City Parks Division, and using industry standards or as part of a weed control plan.
Turf Care
Native grass and areas should be mowed 1-2 times per year depending on rainfall levels The first mowing
should occur at the end of May, and the second time should take place around mid July, with the final mowing
in Mid October.
Kentucky bluegrass lawn areas should be maintained between 2”-4 1/2” and should receive approximately 12”
water between June 1st and late September. This translates to about 1” water per week for lawn areas. Mowing
will not be done during extremely wet periods or when sub-grade is saturated or with standing water. Estab-
lished lawns can receive a deep, but less frequent watering in order to conserve and not over water.
12
Norton Ranch Subdivision, Phase 5 August 2020
Park Master Plan
Noxious Weed Control
A weed control program will be developed that conforms to the requirements of the City of Bozeman, Gallatin
County Weed Control Board Supervisor and NRCS. This program will consist of an annual visit in June to spot
spray where necessary, including trails and sidewalks. Weeds will be sprayed by a licensed contractor, accord-
ing to industry and local standards, on a regular basis, using appropriate applications and products. The utmost
care shall be taken due to the proximity to wetlands and watercourse. The City of Bozeman shall be notified of
any and all applications of pesticides and/or herbicide on public lands. Signs shall be posted prior to application
in appropriate and noticeable locations identifying the product applied and the date applied. Signs will remain
in place for a minimum of two days after treatment. Records shall be maintained in accordance with State of
Montana Pesticide Act, Administrative Rule 4.10.207 and copies submitted to the City of Bozeman Parks Divi-
sion.
Fertilization
Fertilization should be minimized to prevent unnecessarily high amounts of nutrients running off into streams
and wetlands on and off the site. No fertilizer should be applied within 50ft of streams or wetlands to further
minimize the potential for contamination through run-off. Trees and shrubs inside the 50ft buffer should be
monitored and if fertilization is necessary, capsule fertilizer should be used.
Lawn, trees and shrubs outside the 50’ watercourse setback should be fertilized as needed.
Irrigation
The irrigation system should be charged in April, after the ground thaws and plants start growing. The
manual drain valves should be turned to the closed position and well pump power switch turned on. The
controller should be programmed for the anticipated water requirements for the current month. All heads should
be checked for breakage and proper coverage and checked on a monthly basis for necessary adjustments. Drip
emitters should be periodically checked and the system should be regularly monitored for line breaks, head
breakage and vandalism.
Head replacement should be done with the same brand to ensure efficient coverage for the shall working pres-
sure and dispersal at an equal precipitation rate. The height of heads should be checked to avoid damage from
mowers or maintenance equipment.
Winterization should take place during the last week of October. Power to the well pump should be shut off and
all manual drain valves opened. To flush out the lines, a high power air pump shall be connected to the quick
coupler valves and air should be run through the system. Each valve zone should be opened and closed until all
water is completely flushed out, then the controller should be turned off and water lift off until spring. Any nec-
essary watering during the winter months should be done with a tank to prevent damage to the irrigation system.
Refuse
Refuse within the parks and open space will be collected weekly by a service retained by the Neighborhood
Association or the party responsible for maintenance.
13
Norton Ranch Subdivision, Phase 5 August 2020
Park Master Plan
Cost Estimate-Based on 2020 Installation and Material Costs
Installation and Phasing
Owner or Developer is to be responsible for all park items on cost estimate. Phase 1 of the park spaces will be
the creation of Park Easements. The construction and installation of the park will coincide with the Subdivision
Plat Phasing Plan.