Loading...
HomeMy WebLinkAboutApp. G. - Phase 5 Park Exhibit 08-20-2020 PARKLAND EXHIBIT NORTON RANCH SUBDIVISION, PHASE 5 PHASE 5 PARK TOTAL AREA = 1.769 AC M AREA W/IN STORM POND = 0.785 AC LEGEND `° PARKLAND DEDICATION AREA = 0.984 AC N N O O PHASE 5 DEDICATED PARKLAND LO N PHASE 5 PARKLAND WITHIN STORMWATER PONDS/WETLANDS/ WATERCOURSE SETBACK N PHASE 5 PARK TOTAL AREA = 5.636 AC AREA W/IN WETLAND = 1.678 AC PARKLAND DEDICATION AREA = 3.940 AC PHASE 5 LINEAR PARKS • TOTAL AREA = 1.351 AC AREA W/IN WATERCOURSE SETBACK = 1.100 AC PARKLAND DEDICATION AREA = 0.251 AC Scale In Feet 400 0 400 120 0 120 Scale In Meters oil EL� Engineering and Surveying Inc. 1091 Stoneridge Drive•Bozeman, MT 59718 Phone(406)587-1115•Fax(406)587-9768 www.chengineers.com•info@chengineers.com Sheet 1 Of 1 #161141