HomeMy WebLinkAboutApp. G. - Phase 5 Park Exhibit 08-20-2020 PARKLAND EXHIBIT
NORTON RANCH SUBDIVISION, PHASE 5
PHASE 5 PARK
TOTAL AREA = 1.769 AC
M AREA W/IN STORM POND = 0.785 AC
LEGEND `° PARKLAND DEDICATION AREA = 0.984 AC
N
N
O
O
PHASE 5 DEDICATED PARKLAND LO
N
PHASE 5 PARKLAND WITHIN
STORMWATER PONDS/WETLANDS/
WATERCOURSE SETBACK
N
PHASE 5 PARK
TOTAL AREA = 5.636 AC
AREA W/IN WETLAND = 1.678 AC
PARKLAND DEDICATION AREA = 3.940 AC
PHASE 5 LINEAR PARKS •
TOTAL AREA = 1.351 AC
AREA W/IN WATERCOURSE SETBACK = 1.100 AC
PARKLAND DEDICATION AREA = 0.251 AC
Scale In Feet
400 0 400
120 0 120
Scale In Meters
oil
EL�
Engineering and Surveying Inc.
1091 Stoneridge Drive•Bozeman, MT 59718
Phone(406)587-1115•Fax(406)587-9768
www.chengineers.com•info@chengineers.com Sheet 1 Of 1 #161141