HomeMy WebLinkAbout20- Amendment 4 to PSA - HDR Engineering, Inc. - Davis Lane Lift Station and Norton Sewer ProjectFOURTH AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT THIS FOURTH AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT FOR Davis Lane Lift Station and Norton Sewer Project dated February 25, 2019 (the "Agreement") is made and entered into this 9th day of September , 2020, by and between the CITY OF BOZEMAN, MONTANA, a self governing municipal corporation organized and existing under its Charter and the laws of the State of Montana, 121 North Rouse Street, Bozeman, Montana, with a mailing address of PO Box 1230, Bozeman, MT 59771, hereinafter referred to as "City," HDR Engineering, Inc., hereinafter referred to as "Contractor." In consideration of the mutual covenants and agreements herein contained, the receipt and sufficiency whereof being hereby acknowledged, the parties hereto agree to amend the Agreement as follows: 1. Scope of Services. Section 2 of the Agreement is revised to include the attached Exhibit A. 2. Payment. Section 4 of the Agreement is revised to include the amount specified in the attached Exhibit B. The Construction and Administration is to be time and materials not to exceed per the attachment. Original Fee: Amendment 01: Amendment 02: Amendment 03: Amendment 04: Total: $ 841,714.00 $ 39,834.00 $ 61,300.00 $ 885,800.00 $ 6.395.00 S 1,835,043.00 3. Agreement still valid. All remaining terms and provisions of the Agreement remain valid. * * * * END OF AGREEMENT EXCEPT FOR SIGNATURES * * * * Fourth Amendment to Professional Services Agreement for Davis Lane Lift Station and Norton Sewer Project FY 2019 — FY 2020 Page 1 of 2 IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and year first above written. CITY OF BOZEMAN, MONTANA 77)&By Je ich, City Manager APPROVED AS TO FORM By #K I <) Greg Sullivan, Bozeman City Attorney HDR ENGINEERING, INC. By Pri Name: Jared R. Harris Title: Vice President Fourth Amendment to Professional Services Agreement for Davis Lane Lift Station and Norton Sewer Project FY 2019 — FY 2020 Page 2 of 2 Exhibit A Davis Lane Lift Station Amendment No. 4 Scope of Services Task 100. Baxter Lane Sewer Deepening Objective: Provide a revised design per direction from the City of Bozeman and Morrison Maierle to accommodate sanitary sewer service to the west on Baxter Lane. Coordinate with DEQ and City of Bozeman to permit the design changes. Coordinate with COP Construction on design changes, contract documents, and construction materials. Subtasks: 101 Review for Potential Conflict. Review the existing as-builts in Baxter Lane for potential conflicts with public utilities. Review survey information, including locates and potholes, for potential conflicts. 102 Not Used. 103 Redesign of Plans. Sanderson Stewart will update sanitary sewer plan and profiles (C4.0 — C4.1) between stations 0+00 to 9+58.37. The redesign will be based on maintaining the invert elevations at MH1 in Baxter Lane and M114 in Equestrian Lane, shifting the alignment of main in Baxter Lane to align with the centerline of the roadway, and deepening the sanitary sewer at MH1A as much as possible. Direction on the realignment of the sanitary sewer main in Baxter Lane has been provided by Morrison Maierle and the City of Bozeman. 104 Design Drop Manhole & Update Specifications. In order to deepen the sanitary sewer in Baxter Lane to the depths requested by Morrison Maierle, a new drop manhole (MH1A) is proposed. This may require an additional detail and additional information in the Special Provisions. 105 Permit Plans (DEQ and City of Bozeman). Coordination with DEQ and the City of Bozeman to permit the redesigned plans, if necessary. This shall include minor revisions to the engineering report, if required. This item shall not include significant modifications to DEQ permitting material or preparation of deviations. 106 Review Shop Submittals. Review of revised or new submittals, including modifications to MH2 and MI -13 and new MH1A (drop manhole). Review of additional submittals may be required. 107 Coordinate with COP Construction and Review Change Order. The modifications will result in a change of scope to COP Constructions contract 1 of 2 work. Sanderson Stewart will assist in preparation of a change order to COP Construction's contract as well as coordinate with COP Construction, HDR, and the City of Bozeman on the change order. 2of2 m :3 no o O U J a � O 0 co Il ' 0 N Ufl LO — QD co CO LO ti UO I- rn N N in 0) M LO a) M cn LU U) z w w X o W U v O O U(") Cc) I- 0) L) U) N O M N— ri CO (,4 a) m Q � ' Cp UC) Lo I- N M M co c� a � O F - z O U m LI) cn c 0 r S L) U) (D C a� Y U O d C/).� r C G> W C Q _) 7 N C Q U - a CL 0) y M E O c 3 0 U 'a fn O C U) L _7 d Q C O '3 U C C L N J U 3 °ui cn d iC X > ,r O tq > O M 0 0 0 0 0 N O m ofzp�OdOfU fA Co Y C N co T Un o f - Y 0 0 0 O O O O t6 H O 0 O 0 0 O 0 0 O 0 0 3331V10 (V cryco� O O O m rc S3SN3dX3 S1NV1lnSN000n 0 0 0 0 0 0 0 0 0 0 0 333 N08V IVIOI M oo o o HOIV'dlSINIWOVlO3f02id 0 0 n I N33NION3 d3V1S 0 0 II NOAgAms djV1S 0 0 o HOJ.3AunS ONVI '30'd J aoIN3S 0 0 c 0 A � N ' (/1 Q, (OOVO) 1213N`JIS30 O O o I2i33NIJN3103f02Jd o u ', 0 o u o c O o I H33NION3 aOIN3 N N N N N N N N N 0 O 0 U lVdIONINd W O O N N Ol � C m v R d E v r° G37 m c � C O u S o 0 C o n .c c E N ca d 2 N m m O J o 2 v � c O No in o otiv 1°U y N (L N c <J t da E O Eoo `m y mw DrFCI ma o c a �Du) 3 w o oo L « m o a m m O O c 83 d Ir lir K U 0 0 o 0 0 0'tl v w �O u v or m y o a` a` a` o