Loading...
HomeMy WebLinkAbout11-10-20 City Commission Packet Materials - C13. Amend 2 to PSA w Sanderson Stewart for Griffin Dr Reconcstruction Proj Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Taylor Lonsdale, Engineer III Shawn Kohtz, City Engineer SUBJECT: Authorize the City Manager to sign amendment No. 2 to a professional services agreement with Sanderson Stewart for the Griffin Drive Reconstruction Project to include additional surveying related to a gas main. MEETING DATE: November 3, 2020 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign amendment No. 2 to a professional services agreement with Sanderson Stewart for the Griffin Drive Reconstruction Project to include additional surveying related to a gas main. BACKGROUND: Sanderson Stewart was selected to complete the design work for the Griffin Drive corridor through the City’s professional services procurement process. Sanderson Stewart has completed the pre-design work for this project and is under way with final design. Based on that design effort and coordination with Northwestern Energy it is advised that we survey the elevation of a gas main that runs under much of Griffin Drive to ensure that we will maintain adequate clearance from the gas main. The proposed amendment adds the work required for this survey effort to Sanderson Stewart’s professional services contract. The proposed scope and fee have been reviewed by the City Engineering Department and are commensurate with the work involved. A detailed breakdown of the services provided under this agreement are included in the attached scope and fee schedule. 138 UNRESOLVED ISSUES: None ALTERNATIVES: Disapprove FISCAL EFFECTS: The cost of these services total $22,825.00 which is commensurate with the work involved. This work will be paid for from the Street Impact Fee Fund, Project Number SIF133. Attachments: Professional Services Agreement Amendment #2, Scope of Services & Fee Schedule Report compiled on: 10/20/20 139 Second Amendment to Professional Services Agreement for Griffin Drive Reconstruction Project Page 1 of 2 SECOND AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT THIS SECOND AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT FOR Griffin Drive Reconstruction Project dated October 28, 2019 (the “Agreement”) is made and entered into this _____ day of ____________, 2020, by and between the CITY OF BOZEMAN, MONTANA, a self-governing municipal corporation organized and existing under its Charter and the laws of the State of Montana, 121 North Rouse Street, Bozeman, Montana, with a mailing address of PO Box 1230, Bozeman, MT 59771, hereinafter referred to as “City,” Sanderson Stewart, hereinafter referred to as “Contractor.” In consideration of the mutual covenants and agreements herein contained, the receipt and sufficiency whereof being hereby acknowledged, the parties hereto agree to amend the Agreement as follows: 1. Scope of services, rate schedules, and budget for design services are outlined in Attachment “Exhibit A - Scope of Work.” 2. Agreement still valid. All remaining terms and provisions of the Agreement remain valid. **** END OF AGREEMENT EXCEPT FOR SIGNATURES **** 140 Second Amendment to Professional Services Agreement for Griffin Drive Reconstruction Project Page 2 of 2 IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and year first above written. CITY OF BOZEMAN, MONTANA SANDERSON STEWART By________________________________ By_____________________________ Jeff Mihelich, City Manager Print Name: Danielle Scharf, P.E. Title: Principal APPROVED AS TO FORM By_______________________________ Greg Sullivan, Bozeman City Attorney 141 Exhibit A Griffin Drive Improvements Scope of Work – Utility Potholes 10/7/20 Sanderson Stewart is pleased to provide this scope of work to complete utility potholes for the Griffin Drive Improvements project. This project phase will complete utility potholes to determine the depth of the existing 12-inch NorthWestern Energy gas pipeline that runs under Griffin Drive. The depths will be used to refine the design to avoid conflict with the gas main where feasible. Project Scope: Phase 1 - Utility Potholes This phase of the project will include project management, survey and drafting of the pothole locations and depths to be completed by Sanderson Stewart. Survey tasks will consist of marking the pothole locations prior to potholing and surveying the top of pipe elevation at each pothole location once the pipe is exposed. The drafting will consist of importing the new survey data into current base drawings and establishing an alignment for the gas main so that it can be reflected on profiles and cross-sections. The potholing will be conducted by Knife River – Belgrade in accordance with the attached proposal. Knife River’s services will include cutting the existing asphalt, potholing the main with a vacuum truck in the locations identified by Sanderson Stewart, backfilling and patching the asphalt. Traffic control is also included in Knife River’s scope and fee. 142 Griffin Drive Improvements - Design 19078.01 Labor Category Total Plan Hours Total Plan Bill Amt Phase: Gas Main Potholes Task: Project Management and Coordination Principal 4.00 820.00 Project Engineer II 4.00 500.00 Task: Survey Staff Surveyor II 16.00 1,680.00 Task: Update Base Drawings Designer I 6.00 570.00 Subtotal 30.00 3,570.00 Expenses Knife River 19,255.00 Total for Gas Main Potholes 30.00 22,825.00 Total for Griffin Drive Gas Main Photholes 30.00 22,825.00 v7.6.752 (EPOTRATZ) - - Page 1 of 1 143 EQUAL OPPORTUNITY EMPLOYER www.kniferiver.com Intermountain Region-Belgrade Division P.O. Box 9 Belgrade, MT 59714 (406) 388-6832 (406) 388-8347 Fax Sanderson Stewart September 30th, 2020 1610 Ellis Street Suite 2B Bozeman, MT 59715 RE: West Griffin Drive – 7th to Rouse Gas Main Potholing Dear Danielle, Per your request Knife River – Belgrade is supplying the following pricing for potholing the existing gas main along West Griffin Drive per the plan sheets provided via e-mail on 9/23/2020. 10 Potholes: $13,245.00 LS 20 Potholes: $19,255.00 LS Notes: -Traffic control provided by Mountain West Holding Company and will consist of a shoulder closure and traffic lane shift. No flagging is included. -For either option potholing will be divided into two sections. 7th to the Railroad tracks and Rouse to the Railroad tracks. -One 2’x2’ hole will be cut into the existing asphalt, gas main potholed, elevation / coordinates recorded, backfilled with crushed fines and then patched back with up to 4” of hot-mix asphalt. -Anticipated duration for either option is 2 days. -Pothole locations to be laid out by others. -All other items of work are excluded. Sincerely, Josh Walter Project Manager / Estimator Knife River - Belgrade 144