Loading...
HomeMy WebLinkAboutFY22 Street Maintenance Projects3 3 3 1 3 2 2 2 2 Master Plan ID Location Matrix Score BABAB Score PTSC Score TOTAL Cost Description Notes new matrix score public input schools conn. - existing conn. - proposed network gaps conn. - activity centers street paving projects ease of implementation Equity/Transit BB-10 Yellowstone Ave: W. Oak - Valley Commons 25 6 31 $ 26,000.00 Bicycle Boulevard Markings and signs only 0 BB-12 Garfield St: 6th Ave - Black Ave 24 2 26 $ 9,000.00 Bicycle Boulevard Markings and signs only 0 BB-13 N. 20th: N. 22nd Ave - Main St 27 6 27 $ 12,000.00 Bicycle Boulevard 2020 CS 0 BB-2 Black Ave: Tamarack - Carol Place 28 2 30 $ 42,000.00 Bicycle Boulevard FY2020, College to cul-de-sac; markings and signs only 0 BL-2 W. Grant St: 6th - Willson 32 2 34 $ 8,000.00 Bicycle Lanes Striping only, 2018? 0 BL-21 E. Babcock: Grand - Wallace 25 2 27 $ 282,000.00 Bicycle Lanes remove parking and add protected bike lane 0 SP-31 W. Main (north side): Babcock - N. 20th 22 6 28 $ 34,560.00 widen sidewalk on the north side to create SUP 0 SP-32 W. Main (south side): Babcock - N. 23rd 22 6 28 $ 15,552.00 widen sidewalk on the south side to create SUP 0 SPOT-12 W. Oak & Hunter's Way 0 0 $ 60,000.00 Add RRFBs to recently improved crossing RRFBs were originally include in TA project. 0 SPOT-28 Breeze Ln & Buckrake Ave 0 0 $ 9,000.00 Add ramps, realign trail, crosswalk striping partnership with GVLT and Parks and Rec 0 SPOT-37 W. Oak @ Gallatin Regional/Oak Springs Parks 0 0 $ 60,000.00 Add RRFB to existing crossing RRFB 0 SPOT-44 Cattail St & Davis Lane (connects to CJ Middle School)0 0 $ 40,000.00 improve crossing with RRFB, improved markings and ramps Ped xing and RRFB 0 N 19th Ave Path: north of Rawhide Ridge 0 0 $ 48,070.00 reconstruct existing path improve drainage and grading 0 N 19th Ave Path: UPS 0 0 $ 26,125.00 infill missing path Easement needed, wetlands 0 Cottonwood and Annie (Gallatin High)0 0 $ 45,000.00 Add RRFB to existing crossing 0 0 0 0 0 0 0 0 0 0 0 0 0 add projects here previously scored by BABAB score calculated from input scores Multiplier Potential Bike Ped Funding projects for FY22 Fill in scores in the grey with 2, 1, or 0 based on Ranking Criteria 1