HomeMy WebLinkAbout22 Timber Ridge -Geotechnical Report 5-6-20 Rawhide
EngineeringInc.
6871 King Avenue West,Suite G1 K,Billings,MT 59106(406)969-5305
GEOTECHNICAL INVESTIGATION REPORT
TIMBER RIDGE APARTMENTS
2725 TSCHACHE LANE
BOZEMAK MONTANA
PREPARED FOR:
Mr. Chad Householder
Summit Housing Group, Inc.
283 West Front Street, Suite 1
Missoula, MT 59802
Rawhide Engineering,Inc. December 11,2019
RRawhide
E En�lineerin l Inc.
December 11, 2019
Summit Housing Group, Inc.
283 West Front Street, Suite 1
Missoula, MT 59802
SUBJECT: Geotechnical Investigation Report
Timber Ridge Apartments
2725 Tschache Lane
Bozeman, Montana
Dear Mr. Householder:
This report presents the results of our geotechnical investigation for the Timber Ridge
Apartments Project. The site location and test pit locations are shown on the Vicinity/Site Map
shown on Plate 1 at the end of this report. The projects consists of one new apartment building
and the associated driveways/parking lot and recommendations for utility installation.
Our recommendations contained in this report are based on exploratory test pits, laboratory
testing, engineering analysis and preparation of this report. The recommendations required to
design commercial foundations, asphalt parking section design and construction, and utility
installation are contained in the attached report. These conclusions and recommendations,
along with restrictions and limitations on these conclusions, are discussed in the attached
report.
We appreciate this opportunity to be of service to you, and look forward to future endeavors. If
you have any questions regarding this report or need additional inforrnatipn or services, please
feel free to call the undersigned. oNr...
ROBERT WAYNE
Sincerely, KUKES
RAWHIDE ENGINEERING, INC. a
10
Jason A. Frank Rob -E.
Principal Principal"
Enclosures: Report (1 hard copy, 1 pdf)
Rawhide Engineering, Inc. December 11,2019
TABLE OF CONTENTS
PAGE
INTRODUCTION ...........................................................................................................................I
ProjectDescription..............................................................................................................1
Scopeof Service.................................................................................................................1
Authorization ......................................................................................................................1
Professional Statements and Limitations............................................................................1
PROPOSEDCONSTRUCTION......................................................................................................2
FIELDINVESTIGATION .................................................................................................................2
LABORATORYTESTING ..............................................................................................................3
MoistureContent Tests........................................................................................................3
SoilClassification Tests.......................................................................................................3
SITE CONDITIONS.........................................................................................................................4
SUBSURFACE SOILS AND GROUNDWATER.........................................................................4
RECOMMENDATIONS ...................................................................................................................4
Excavations ......................................................................................................................4
Material .................................................................................................................5
Placement and Compaction ....................................................................................5
FOUNDATIONS........................................................................................................................6
Conventional Spread Footings............................................................................................6
StructuralFill................................................................................. ........7
Compaction Requirements...................................................................................................7
CONCRETESLAB-ON-GRADE.....................................................................................................7
PAVEMENTSECTIONS.....................................................................................8
Subgrade and Aggregate Base...........................................................................................8
Asphalt Concrete Pavement..........................:......................................................................9
SITEDRAINAGE.............................................................................................................................9
APPENDICES
A Plates
December 11, 2019
Rawhide Engineering,Inc.
GEOTECHNICAL INVESTIGATION REPORT
TIMBER RIDGE APARTMENTS
2725 TSCHACHE LANE
BOZEMAN, MONTANA
INTRODUCTION
Project Description
This project will consist of one new apartment building which will be a 3 story wood framed
structure with a concrete slab-on-grade. The building will be approximately 13,000 f12 with the
associated parking lot and utility installation located at 2725 Tschache Lane in Bozeman,
Montana. The site is currently undeveloped commercial property covered with some vegetation
and fill soils.
Scope of Services
Our scope of services for this project consisted of the following:
1. Excavating 4 exploratory test pits to depths ranging from 8 to 8.5 feet below
existing site grades. Rawhide also performed several borings on this site for a
previous apartment building.
2. Laboratory testing to determine the characteristics of the site soils for use in
engineering design.
3. Engineering analysis to aid in the design of structure foundations, utility
installation and asphalt pavement structural sections.
4. Provide information as to the existing groundwater conditions at the time of our
exploration.
5. Provide recommendations for earthwork and construction on the site.
This study did not include evaluations of site seismicity, liquefaction, faulting, or other potential
geologic or environmental hazards. This study did not include a groundwater study or the
design of a dewatering system.
Authorization
Authorization to proceed with our work on this project was provided on November 25, 2019.
Rawhide Engineering, Inc. 1 December 11, 2019
Professional Statements and Limitations
Recommendations presented in this report are governed by the physical properties of the soils
encountered in the exploratory test pits, laboratory testing, current groundwater conditions, the
project layout and design data described in the following proposed construction section.
The recommendations presented in this report are based on exploratory test pit locations shown
on the site map. Variations in soils may exist between the explored locations and the nature
and extent of soil variations may not be evident until construction occurs. If subsurface
conditions other than those described in this report are encountered and if project design and
layout is substantially altered from the information in this report, Rawhide Engineering should be
notified so that recommendations can be reviewed and amended, if necessary.
This report has been prepared for design purposes for our client and specifically for this project
in accordance with the generally accepted standards of practice at the time the report was
written. No warranty, either expressed or implied, are intended or made.
Other standards or documents referenced in any given standard cited in this report, or otherwise
relied upon by the authors of this report, are only mentioned in the given standard; they are not
incorporated into it or "included by reference," as that latter term is used relative to contracts or
other matters of law.
PROPOSED CONSTRUCTION
It is our understanding that this project will include the construction of a 3 story apartment
building which will be wood framed. The building will be 13,000 ft2 in plan view. The building
will have conventional concrete stem wall foundations. The project will also have utility
installation and the associated driveways/parking areas. Rawhide Engineering has estimated
that the structural loads for these structures will have continuous footings loads of 2 to 3 kips
per lineal foot and maximum interior column loads of 50 kips for long term loading conditions.
This project will also include the construction of utilities to service the building and an asphalt
parking lot.
FIELD INVESTIGATION
In order to determine and evaluate the subsurface conditions across the site, 4 exploratory test
pits were completed using an excavator provided by Rawhide Engineering. Test pit depths
ranged from 8 to 8.5 feet below the existing ground surface. Rawhide Engineering also had
borings on this site from the previous apartment on this site. The location of the test pits
shown on the Vicinity/Site Map were provided by Rawhide Engineering based on the
information provided. This location should be considered accurate only to the degree implied by
the method used.
Rawhide Engineering, Inc. 2 December 11, 2019
The field investigation was under the direct control of an experienced member of our
geotechnical staff who logged the soil conditions for each test pit. Samples were obtained from
driving a 2-inch Standard Penetration Sampler 18 inches using a 140 pound hammer falling 30
inches. The blow counts recorded on the test pit logs were determined by counting the number
of blows for the last 12 inches of the drive sample. The blow counts used in this report were
from previous work on the same site. Bulk auger cuttings were also obtained for further
testing. The SPT and bulk samples were examined by field personnel, logged and sealed to
prevent moisture loss prior to laboratory testing. After completion, the groundwater level in the
test pit was recorded and the test pits were backfilled using drill cuttings.
The test pit logs included at the end of this report are labelled TP-1 through TP-4. A test pit log
legend and a description of the Unified Soil Classification System used to identify the soils is
included with the test pit logs.
LABORATORY TESTING
A laboratory testing program was utilized to provide the necessary data for engineering analysis
of this project. The testing was used to evaluate the index and engineering properties
specifically for the conditions encountered during our field exploration. The following program
was used for this project.
Moisture Content Tests—ASTM D2216
Moisture content tests were conducted on selected samples obtained from the site. These tests
were used to aid in identifying the current soil conditions and aid in classifying the soils.
Moisture content tests are shown on the test pit logs.
Soil Classification Tests—ASTM D422, D1140, D4318, D2487 and D2488
In order to classify the soils according to the Unified Classification System, soil gradations and
Atterberg Limits test were conducted on selected samples. The results of this testing is shown
below and on the test pit logs.
Rawhide Engineering, Inc. 3 December 11,2019
Gradations and Atterberg Limits Tests
Percent Passing
Sieve Size TP-2 @ 2.0—4.0'
No. 4 100
No. 10 100
No. 20 98
No. 40 96
No. 80 92
No. 200 81
Plastic Index 5.3
Unified Classification Silty Clay with Sand (CL-ML)
SITE CONDITIONS
The site is located at 2725 Tschache Lane. The site is currently undeveloped commercial land
which slopes gently to the north. A total relief of 1 to 2 feet is currently present across the site.
The site is bordered by developed and undeveloped commercial and residential property.
Drainage on the site consists of infiltration and runoff to the north.
SUBSURFACE SOILS AND GROUNDWATER
The soil conditions encountered on the site generally consist of a layer of fill) with some
vegetation extending to a depth of 1.0 feet below the existing surface. The fill consists of clay,
silt, sand and cobbles. Beneath the fill layer we encountered silty clay with sand to depths
ranging from 4.5 to 5.0 feet below existing site grades. The silty clay with sand soils were
medium stiff near the surface and became soft at depths below 3 feet. The silty clay with sand
soils have a low plastic index and a high potential for consolidation, especially below 3 feet.
Beneath the fine grained soil layer we encountered gravel with clayey sand to the depths
explored of 8 to 8.5 feet below existing site grades. The gravel with clayey sand was dense and
has a low plastic index to granular non-plastic. Groundwater was encountered in test pits at
depths ranging from 4.8 to 5.5 feet (at the gravel interface) below existing site grades and is
may impact utility installation. The groundwater levels were measured in December 2019
and may change with seasonal precipitation and irrigation practices.
Rawhide Engineering, Inc. 4 December 11, 2019
RECOMMENDATIONS
Prior to construction, surface fill soils should be removed from the site or stockpiled for use in
non-structural areas. It appears about 1.0 feet can be used as a reasonable estimate for
average depth of stripping. All trash and vegetation should be removed from the site if they are
present. Excavations resulting from removal operations should be cleaned of all loose material
and widened as necessary to permit access to compaction equipment.
Excavations
The contractor is ultimately responsible for the safety of workers and should strictly observe
federal and local OSHA requirements for excavation shoring and safety. All temporary slopes
should comply with OSHA requirements for Type A soils. During wet weather, runoff water
should be prevented from entering excavations.
It appears that excavation for footings and utility trenches can be readily made with either a
conventional backhoe or excavator in the native soil materials. We expect the walls of the
footing trenches in the near surface fine grained soils to stand near vertically without significant
sloughing. If trenches are extended deeper than five feet or are allowed to dry out, the
excavations may become unstable and should be evaluated to verify their stability prior to
occupation by construction personnel. Shoring or sloping of any deep trench walls may be
necessary to protect personnel and provide temporary stability. All excavations should comply
with current OSHA safety requirements for Type A soils. (Federal Register 29 CFR, Part 1926).
The groundwater levels are currently 4.8 to 5.5 feet below the current site grade. If the
site is not raised, the utility installation may require a dewatering plan. Our scope of
service did not include a groundwater study or the design of a dewatering system. If
dewater is required, the system should be designed by a competent person with
experience designing dewatering systems and there effects on adjacent structures.
Backfills for trenches or other excavations within pavement areas should be compacted in six to
eight inch layers with mechanical tampers. Jetting and flooding should not be permitted. We
recommend all backfill be compacted to a minimum compaction of 97% of the maximum dry
density as determined by ASTM D698. The moisture content of compacted backfill soils should
be within 2% of the optimum. Poor compaction in utility trench backfill may cause excessive
settlements resulting in damage to the pavement structural section or other overlying
improvements. Compaction of trench backfill outside of improvement areas should be a
minimum of 90% relative compaction.
Material - Pipe bedding shall be defined as all material within six inches of the perimeter
of the pipe. Backfill shall be classified as all material within the remainder of the trench.
Material for use as bedding shall consist of clean, granular materials, and shall conform
Rawhide Engineering, Inc. 5 December 11,2019
to requirements for bedding material listed in Section 02221 of the Standard
Specifications.
Placement and Compaction - Pipe bedding shall be placed in thin layers not exceeding
eight inches in loose thickness, and conditioned to the proper moisture content for
compaction.
All other trench backfill shall be placed in thin layers not exceeding eight inches in loose
thickness, conditioned to the proper moisture content, and compacted as required for
adjacent fill. If not specified, backfill should be compacted to at least 97% relative
compaction in areas under structures, utilities, roadways, parking areas, concrete
flatwork, and to 90% relative compaction in undeveloped areas.
Foundations
At the time of this report, it is assumed that the building will have conventional shallow stem wall
foundations. Due to the high potential for consolidation in the silty clay with sand soils, the
exterior continuous and interior load bearing footings should be over excavated down to the
native gravel layer located 4.5 to 5 feet below existing site grades and backfilled with compacted
structural fill to the bottom of footing elevations. Utilizing the structural loads provided and an
allowable bearing pressure of 4,000 pounds per square for compacted structural fill over laying
the native gravel, a settlement of 1/2 inch was estimated.
Structural fill under foundations shall be placed in layers, moisture conditioned, and compacted
to 98% of ASTM D698. Exterior continuous foundations should be embedded a minimum of 4.0
feet below lowest adjacent exterior finish grade for frost protection and confinement. Interior
footings should be bottomed at least 12 inches below lowest adjacent finish grade for
confinement. Wall foundation dimensions should satisfy the requirements listed in the latest
edition of the International Commercial Code. Reinforcing steel requirements for foundations
should be provided by the design engineer.
The allowable bearing pressures, indicated above, are net values, therefore, the weight of the
foundation and backfill may be neglected when computing dead loads. Allowable bearing
pressures may be increased by one-third for short-term loading such as wind or seismic.
Resistance to lateral loads in the upper silty clay with sand soils may be calculated using an
allowable passive equivalent fluid unit weight of 230 pounds per cubic foot and an allowable
coefficient of friction of 0.38 applied to vertical dead loads. Both passive and frictional
resistances may be assumed to act concurrently. An allowable active equivalent fluid pressure
of 38 pounds per cubic foot may be used.
The International Building Code (IBC) site class for this project is Class C.
Rawhide Engineering, Inc. 6 December 11, 2019
Structural Fill
Structural fill will be used beneath the entire building envelope and should consist of dense
gravel with sand and conforming to the following gradation and plastic index.
Sieve Size Percent Passing
3 Inch 100%
No. 4 25-65%
No. 200 <20%
Plastic Index 12 or less
All structural fill shall be placed in eight inch loose lifts and uniformly moisture conditioned to
within +/-2% of optimum moisture content. The contractor shall provide and use sufficient
equipment of a type and weight suitable for the conditions encountered in the field. The
equipment shall be capable of obtaining the required compaction in all areas, including those
that are inaccessible to ordinary rolling equipment.
Compaction Requirements
The following table lists the compaction requirements for structural fill, foundation backfill, utility
trench backfill and street subgrade preparation.
COMPACTION REQUIREMENTS
Structural Fill Beneath Foundations 98% of ASTM D698
Backfill Against Foundations 95% of ASTM D698
Utility Trench Backfill 97% of ASTM D698
Subgrade for Paved Parking Areas 95% of ASTM D698
Concrete Slab-on-Grade Construction
Prior to constructing concrete slabs, the upper six inches of slab subgrade should be scarified,
moisture conditioned to within 2% of optimum, and uniformly compacted to at least 95% of
maximum dry density as determined by ASTM D698. Scarification and compaction will not be
required if floor slabs are to be placed directly on undisturbed compacted structural fill.
All concrete floor slabs should have a minimum thickness of four inches. Slab thickness and
structural reinforcing requirements within the slab should be determined by the design engineer.
At least one foot of crushed base aggregate should be placed beneath slab-on-grade floors to
provide uniform support. The aggregate base should be compacted to a minimum of 95%
relative compaction.
Rawhide Engineering, Inc. 7 December 11,2019
We recommend that the base course be placed within three to five days (depending on the time
of year) after moisture conditioning and compaction of the subgrade soil. The subgrade should
be protected against drying until the concrete slab is placed.
In floor slab areas where moisture sensitive floor coverings are planned, an impermeable
membrane (e.g. 10-mil thick polyethylene) should be placed over the base course to reduce the
migration of moisture vapor through the concrete slabs. The impermeable membrane should be
installed as required by the flooring manufacturer. Current literature from the American
Concrete Institute and the Portland Cement Association recommend that impermeable
membrane is placed on top of the base course immediately below the concrete slab.
Pavement Sections
The recommended pavement structural section for the project presented below was calculated
using the AASHTO pavement design procedure. Traffic loading information was not available at
the issue of this report. If traffic loading information becomes available or if loading is
anticipated to exceed assumed loading conditions, alternative pavement structural sections
should be determined based on the provided loading information. In our analysis, we have
assumed light-duty loading conditions of 90,000 18-kip equivalent single axle load (18-kip
ESAL) for the lifetime of the pavement for the parking areas. A CBR value of 4.5 was used for
design of the pavement section.
PAVEMENT STRUCTURAL SECTIONS
Traffic Condition Recommended Minimum Structural Section
Light Duty Asphalt Section 3 inches of Asphaltic Concrete, 4 inches of 1 %" Crushed
Base Course and 8 inches of 6" minus pitrun gravels
Aggregate base course thickness may be reduced in each alternate pavement structural section
by approximately 20% with the use of geotextile fabric meeting AASHTO M 288-2000 class 1
requirements. If this alternative is selected, we can provide addition pavement structural
sections.
It should be noted that the subgrade soils are likely to be prone to frost action during the winter
and saturation during the wet spring months. The primary impact of frost action and subgrade
saturation is the loss of subgrade and aggregate base strength. Pavement life will be increased
if efforts are made to reduce the accumulation of excess moisture in the subgrade soils.
Subgrade and Aggregate Base
Subgrade Preparation -After completion of the utility trench backfill and prior to
placement of aggregate base, the upper six inches of subgrade soil shall be
Rawhide Engineering, Inc. 8 December 11,2019
uniformly compacted to at least 95% relative compaction. This may require
scarifying, moisture conditioning, and compacting in both cut and fill areas.
Aggregate Base - Aggregate materials shall meet the requirements of the
appropriate sections of the "Standard Specifications" for 1 '/2 Minus Crushed
Base Rock. The aggregate base materials must be approved by the
Geotechnical Engineer prior to use.
After the subgrade is properly prepared, the aggregate base shall be placed in
layers, moisture conditioned as necessary, and compacted by rolling to at least
95% relative compaction. The compaction thickness of aggregate base shall be
as shown on the approved plans.
Asphalt Concrete Pavement
Materials - Aggregate materials for asphalt concrete in light and heavy traffic
areas shall conform to the requirements listed for Type B bituminous aggregates
of the "Standard Specifications." Asphalt concrete mixes shall utilize asphalt
cement meeting the requirements of Section 02510 of "Standard Specifications".
The mix design shall be based on the Marshall Method.
Placement and Compaction - The asphalt concrete material and placement
procedures shall conform to appropriate sections of the "Standard
Specifications." The asphalt concrete material shall be compacted to a minimum
of 93% of the Theoretical Maximum Rice Specific Gravity.
Site Drainage
Final elevations at the site should be planned so that drainage is directed away from all
foundations and concrete slabs. Parking areas should be designed to drain surface water off
the sight and away from structures. In accordance with the International Commercial Code,
downspouts with 6 foot extensions should be used. Positive drainage away from all foundations
should have 6 inches of fall in the first 10 feet away from the foundations. If sufficient room is
not available to construct the 10 foot slope, drainage swales should be constructed as far from
the foundations as possible.
Rawhide Engineering, Inc. 9 December 11,2019
I
APPENDIX A
Plates
Site / Vicinity Map
rim
4574�
�R
tr
�9� ttg J 11
i• -
TURBULENCE-LACL
6 onsveot spaces
N-3
o•o•o e•••o
TP-4 •• •
C4 f r •
8 �' • _
'ram; CRO.V
4• Cq
1�1 - p• 4
TP-1
It activity area
TSCHACHE LANE
TEST PIT LOG LOGGED BY: J. Frank
PROJECT: Timber Ridge Apartments DRILL METHOD: Excavator
2725 Tschache Lane DRILLER: Duneman Const.
R Rawhide CLIENT: Summit Housing Group DATE: 12/4/19
E Engineering Inc. LOCATION: Bozeman, Montana ELEVATION:
SAMPLES LABORATORY TESTING
�_ TEST PIT NUMBER: 1 N o ^ o
V
OCn
v cc
s MATERIAL DESCRIPTION AND COMMENTS 3 c
FILL Fill -Clay, Silt, Sand with Gravels/Cobbles and Vegetation -
1 Dark Brown, Moist, Medium Stiff
2 CL-ML Silty Clay with Sand - Brown, Moist, Medium Stiff to Soft,
Low/Moderate Plastic Index
3
4
5 Groundwater Level at 5.1 Feet
6 GP Gravel and Cobbles with Clayey Sand - Brown/Gray.
Moist to Wet, Dense, Low Plastic Index
7
8 Test Pit Ends at Approximately 8.0 Feet Depth
9 Groundwater Was Encountered at 5.1 Feet
10
11
12
13
14
15
16
17
18
19
20
6871 King Ave. West, Suite G1 K, Billings, MT 59106 (406) 969-5305 Fax:(406) 969-5307
TEST PIT LOG LOGGED BY: J. Frank
��141 1b. PROJECT: Timber Ridge Apartments DRILL METHOD: Excavator
2725 Tschache Lane DRILLER: Duneman Const.
R Rawhide CLIENT: Summit Housing Group DATE: 12/4/19
E Engineering Inc. LOCATION: Bozeman, Montana ELEVATION:
SAMPLES LABORATORY TESTING
ell
TEST PIT NUMBER: 2 N o ..
o
Cz u
u
c rCZ
VR
`" = MATERIAL DESCRIPTION AND COMMENTS U 3 G
FILL Fill -Clay, Silt, Sand with Gravels/Cobbles and Vegetation -
1 Dark Brown, Moist, Medium Stiff
2 CL-ML Silty Clay with Sand - Brown, Moist, Medium Stiff to Soft,
Low/Moderate Plastic Index
3 F 26.1 5.3 81.1 2.0
4
5 Groundwater Level at 5.3 Feet
6 GP Gravel and Cobbles with Clayey Sand - Brown/Gray.
Moist to Wet, Dense, Low Plastic Index
7
8
9 Test Pit Ends at Approximately 8.5 Feet Depth
Groundwater Was Encountered at 5.3 Feet
10
11
12
13
14
15
16
17
18
19
20
6871 King Ave. West, Suite G1 K, Billings, MT 59106 (406) 969-5305 Fax:(406) 969-5307
TEST PIT LOG LOGGED BY: J. Frank
PROJECT: Timber Ridge Apartments DRILL METHOD: Excavator
2725 Tschache Lane DRILLER: Duneman Const.
R Rawhide CLIENT: Summit Housing Group DATE: 12/4/19
E Engineerinq Inc. LOCATION: Bozeman, Montana ELEVATION:
SAMPLES _ LABORATORY TESTING
TEST PIT NUMBER: 3
f MATERIAL DESCRIPTION AND COMMENTS 3 —
FILL Fill - Clay, Silt, Sand with Gravels and Vegetation -
1 Dark Brown, Moist, Medium Stiff
2 CL-ML Silty Clay with Sand - Brown. Moist, Medium Stiff to Soft,
3 Low/Moderate Plastic Index
4 Groundwater Level at 4.8 Feet
5 GP Gravel and Cobbles with Clayey Sand - Brown/Gray,
6 Moist to Wet. Dense, Low Plastic Index
7
8 Test Pit Ends at Approximately 8.0 Feet Depth
9 Groundwater Was Encountered at 4.8 Feet
10
11
12
13
14
15
16
17
18
19
20
6871 King Ave. West, Suite G1 K, Billings, MT 59106 (406) 969-5305 Fax:(406) 969-5307
TEST PIT LOG LOGGED BY: J. Frank
lb- PROJECT: Timber Ridge Apartments DRILL METHOD: Excavator
R! 2725 Tschache Lane DRILLER: Duneman Const.
ERawhide CLIENT: Summit Housing Group DATE: 12/4/19
Ei:gineering Inc. LOCATION: Bozeman, Montana ELEVATION:
SAMPLES _ LABORATORY TESTING
_ - y TEST PIT NUMBER: 4 o ..
Ci u G Ui. v
O
n `" MATERIAL DESCRIPTION AND COMMENTS 3 —
=: FILL Fill -Clay, Silt, Sand with Some Gravels and Vegetation -
1 = Dark Brown, Moist, Medium Stiff
2 CL-ML Silty Clay with Sand - Brown, Moist, Medium Stiff to Soft,
3 Low/Moderate Plastic Index
4
5 Groundwater Level at 5.5 Feet
6 GP Gravel and Cobbles with Clayey Sand - Brown/Gray.
Moist to Wet, Dense, Low Plastic Index
7
8 Test Pit Ends at Approximately 8.0 Feet Depth
9 Groundwater Was Encountered at 5.5 Feet
10
11
12
13
14
15
16
17
18
19
20
6871 King Ave. West, Suite G1K, Billings, MT 59106 (406) 969-5305 Fax:(406) 969-5307
TEST PIT LOG LEGEND
MATERIAL DESCRIPTION
Soil Pattern USCS Symbol USCS Classification
-- ---- FILL Artificial Fill
GP or GW Poorly/Well graded GRAVEL
GM Silty GRAVEL
GC Clayey GRAVEL
GP-GM Poorly graded GRAVEL with Silt
GP-GC Poorly graded GRAVEL with Clay
SP or SW Poorly/Well graded SAND
SM Silty SAND
Sc Clayey SAND
SP-SM Poorly graded SAND with Silt
SP-SC Poorly graded SAND with Clay
SC-SM Silty Clayey SAND
ML SILT
MH Elastic SILT
CL-ML Silty CLAY
CL Lean CLAY
CH Fat CLAY
PCEM PARTIALLY CEMENTED
CEM CEMENTED
BDR BEDROCK
CONSISTENCY
Cohesionless Soils Cohesive Soils Cementation
VL Very Loose So Soft MH Moderately Hard
L Loose F Firm H Hard
MD Medium Dense S Stiff VH Very Hard
D Dense VS Very Stiff
VD Very Dense
SAMPLING
SPT
Shelby Tube
NR No Recovery
Bulk Sample
�7 Water Table
RRawhide
E Engineering Inc.
UNIFIED SOIL CLASSIFICATION SYSTEM
Critorla for Assigning Group Symbols and Group Names Usinn Laboratory Tests' Soil Classification
Group
symbol Group Name'
Coarse Grained Solis Gvdvels Clean Gravers Cu 24 and I s Cc s 3' GW Wallgmded g-aY6'
More than 50%of ccarse Less than S%fines` Cu<4 and/or 1>Cc>31 GP P d g eel rave"
None than SOX retained fraction retained on Poorly
No.200 sieve No.4 sieve Gravels w o Faws Fines classify as ML or MH GM Silty gravVr "
Moro than 12%fines Fines classify as Cl.or CH GC Clayey gravel",
Sands Clean Sands Ci"6 and 1 s Cc s 3' SW We4rsded sand•
50%or more of coarse Less man 5%fines' Ou<6 and/or 1>Cc>3` SIP Poorly graded sand
fraction passes
No.4 sicvo Sands wlth Fires Fines casslfy as 6t:or AIH SM S;ay santisw
Moro than 12%6nese Fines Classify as CL or CH SC Clayey sand"
Fine-Grained Solis Sits and Clays Inorganic PI>7 and profs on or above'A'File' CL Lean clad"'
50%or mote passes the Lq"Emit less than 50 PI-c 4 of plots below A'kW ML SW'""
No.200 shove
organic Liquid limit-oven dried 40.75 OL Organic clay"""
Liquid My*-not dried organic s01'4i'°
&I's and Clays kvirpnic PI plots on or above',-line CH Fat day—
Liquid limit 50 or more PI plots below','Ono MH Elastic Ste`0
organic Liquid Ilr.3-oven dried <0.75 OH Orpanlo cw"L,
Liquid Omit-not dried Organic WWI
H!gh'y organic so_s Prknwiy organic matter.dark In color,and organic odor PT Pea,
"Based on the material passing the 3,4n.(75-ram)sieve Hif fines are o•ganlc,add 1Mth organic fees'to group name.
°If field sample contaned cobbles a boulders.c.both,add Wth cobbles 1 If soli contains t 15%gravel,add'wth gravel'to group name.
or boulders.or both'to group name. J If Afterberg:rr is plot in shaded area.so i is a CL-ML.silty day.
cr,mvwh wAth S In 171L hire nwrl„'ra r41al cyrnANc• GW-CJA vmr orarinrl Kit coil oonteins 16 to 12M plus No.-'00,add'with send'or with
gravel with silL GW-GC well-graded travel with day.GP-GM poorly gravel:whichever is predorr.'nant.
graded gravel with silt.GP-GC poorty graded gravel with day. t If soil contains;-.,30%plus No 200 predomrsandy sand.add
°Sands with 5 to 12%fines requ'e dual symbols: SW-SM%,*1•graded 'sandy*to group name.
sand w3h silt.SW-SC vmll-gradod sand Wth day,SP-Sf.1 poorty graded u
sand wth silt.SP-SC poorly graded sand with day If contains:3 plus No.200,predominanCy gravel,
add'graveve d to group name.
r (13.) API t 4 and pats on or above'A'One.
Cu=OWD•o Ce=
Do x Ow ° PI<4 0'plots below I:no.
°If so!l contains 2 15%sand,add Wth sand'to group name. PPI plots on cr aba+o'A'line.
°If fines classify as CLA1L,use dust symbol GC-GIJ•or SC-SM. ° PI pots be!cw'A'line.
ao
For classification of fine-grained
soils and fine-grained fraction
50 of coarse•gralnrd soils —Joe
Equation W W•I-w �•' �T\7
Horizontal at PI-4 to LL-25S.
W 40 tncr.PI-0.73(LL•20) aG+
Q Eq:taaon of V•11m G�
z Voikal at Li..16 to PI•.7.
3o tsen PI-0-9(LL-tn
20
a MHorOH
w ,
4 - I` r MLorOL
0
0 10 16 20 30 40 so 6o 70 so go 1ao 110
LIQUID LIMIT(ILL)
mb-
RE Rawhide
�� Engineering Inc.