Loading...
HomeMy WebLinkAbout19 Revised Storm Report 9-15-20 STORMWATER DESIGN REPORT FOR: TIMBER RIDGE APARTMENTS BOZEMAN, MT Prepared By: Madison Engineering 895 Technology Blvd Ste 203 Bozeman, MT 59718 (406) 586-0262 REVISED SEPTEMBER 2020 TIMBER RIDGE APARTMENTS SITE PLAN STORMWATER DESIGN REPORT A. Introduction The proposed development for the Timber Ridge Apartments Site Plan will be constructed at 2769 Tschache Ln in Bozeman, MT. The site development consists of one apartment building with 30 apartment units and associated infrastructure. The following references were used in the preparation of this report: a. COB Design Standards and Specifications Policy, 2004 (DSSP). Addendum #7 b. COB Modifications to Montana Public Works Standard Specifications (MPWSS) B. Stormwater Management The site is located on Lot 5A of Block 8 of West Winds Subdivision PH 2A & 2B. It is bordered by two public streets, Tschache Ln and Turbulence Ln, a private drive, and existing homes and fence. Site access is provided by the private drive, which was constructed with the “Stoneridge” Apartments on Lot 5B adjacent to the west of the proposed site. Stormwater infrastructure was previously developed for the private drive, as well as the adjacent lots and city streets. The proposed stormwater management system consists of on- site curb and cutter, grass swales, a retention pond, and a buried gravel infiltrator. Runoff is directed from the site into the curb and gutter via grass swales and overland sheet drainage. The runoff then exits the curb at a curb cut into a gravel drainage swale that directs the flow into the retention pond. Runoff also enters the retention pond via the grass swale. The pond includes an infiltration mechanism, a 5’ radius gravel infiltrator that is excavated to native gravels, lined with separation fabric, and filled with drain rock. In addition to the pond, a buried gravel infiltration and retention system is proposed for the southernmost wall of the apartment complex. The proposed design reduces the post-development to less than the pre-development runoff rate. Stormwater run-off was calculated based on the Rational Method and the retention systems were sized per the City of Bozeman’s design standards for a storm intensity of 10- year frequency and a 2-hour duration. The required retention pond storage volume is 2,274 cf. At a 1.5’ depth, the proposed retention pond has a capacity of 2,288 cf. The required gravel infiltration and retention system storage volume is 357 cf, which does not include infiltration rates. The area used to calculate drainage volumes does not include the private drive, since that was accounted for with the “Stoneridge Apartments” project adjacent to the proposed development. Stormwater conveyance structures were sized to convey the 25 year, 2-hour storm. The curb and gutter and proposed drainage swales have adequate capacity to convey the flows. The stormwater basins and areas are displayed in the attached Drainage Exhibit. The stormwater basin, runoff, retention, and conveyance calculations are included in the appendix. A stormwater maintenance plan is included in the appendix. C. Soil Conditions and Groundwater Information A geotechnical investigation was performed for the site by Rawhide Engineering Inc. The investigation consisted of four test pits. Paraphrasing the report, the site consists of a layer of fill with silty clay with sand extending to a depth of 1 ft below the ground surface. A native silty sand was then encountered below the fill ranging from 4.5 ft to 5 ft below the existing surface. Then, a layer of gravel and cobbles with clayey sand was encountered beneath the silty sand to a depth of 8 ft to 8.5 ft below the existing surface. Groundwater was encountered in the test pits at depths ranging from 4.8 ft to 5.5 ft below existing grade, generally at the gravel interface. The proposed retention pond was designed to have the bottom of the pond elevation above the observed groundwater surface. The observed groundwater elevation in Test Pit #4 was 5.5 ft below the existing surface. The pond bottom elevation is approximately 1.5 ft below existing grade at the lowest point, putting the bottom of the pond about 4 ft above the observed groundwater elevation. The proposed buried gravel infiltration system was designed to have the bottom of stormwater retention volume above the observed groundwater depth. The proposed finished grade above the infiltration system is about 0.5’ above the existing grade. Groundwater was observed in Test Pit #1 at 5.1’ below the existing ground surface. The infiltration system storage has a maximum depth of 4’ below finished grade, putting the bottom of the storage volume 1.6’ above the observed groundwater level. Seasonal high groundwater fluctuations can be estimated via a comparison of groundwater monitoring data for a nearby project about 1 mile to the north, the Palisades Condominiums, located near the corner of Catamount St and Warbler Way. Groundwater monitoring was conducted in the spring and summer of 2020, and groundwater fluctuated less than a foot over the recorded measurements. It is anticipated that groundwater will fluctuate similarly at the Timber Ridge Site, within a foot above the observed measurements of the Geotechnical report. The Palisades Condominium groundwater monitoring information is included in the Appendix. D. Treatment and 0.5” Storm Requirement Basins 1, 2, & 3 flow into retention and infiltration facilities sized to totally retain the 10 year-2 hour storm, which has an intensity of 0.41 in/hr, exceeding the 0.5” volume. The 0.5” storm retention or treatment is not necessary for Basin 4, since Basin 4 is totally a landscaped area. Appendices A. Stormwater Calculations B. Stormwater Maintenance Plan C. Drainage Exhibit & Grading Plan D. Palisades Groundwater Monitoring for Comparison Appendix A: Stormwater Calculations 25-year Flows for Sizing of Conveyance Structures: Drainage Basin No. Total Area (SF) IMPERVIOUS (SF) C = 0.9 ROOF (SF) C=0.9 LANDSCAPED (SF) C = 0.2 Weighted C Basin Length (ft) Slope % Tc (min) Cf = 1.1 i 25-yr (in/hr) Q 25 (cfs) Existing 75501 0 0 75501 0.20 350 1 31 1.20 0.41 1 50414 20956 6457 23001 0.58 350 1 5 3.83 2.57 2 9281 0 3725 5546 0.48 250 1 5 3.83 0.39 3 9947 864 3867 5216 0.53 100 2 5 3.83 0.47 4 5859 0 0 5859 0.20 100 2 5 3.83 0.10 Subtotal 75501 21820 14049 33763 Manual estimates 10-year Flows for Pre and Post Development Runoff Calculations: Drainage Basin No. Tc (min) Cf = 1.0 i 10-yr (in/hr) Q 10 (cfs) Existing 31 0.97 0.34 4 5 3.22 0.09 Pre-development Runoff Rate 0.337 cfs Post-development Runoff Rate 0.09 cfs Note: Basins 1 and 2 runoff is totally retained in the retention pond, Basin 3 is retained in the infiltration chamber, Basin 4 sheet flows off-site and into the existing curb and gutter on Tschache Lane. Therefore the Post-development runoff is only Basin 4. Timber Ridge Apartments Peak flow calculations Drainage Areas Page 1 of 1 Allowable Pavement Encroachment Given: T =9 feet (max per city) W =1.5 feet Ts =7.5 feet Sw =0.0625 ft/ft Sx =0.03 ft/ft a =0.59 inches d =3.24 inches n =0.015 Sw/Sx =2.08 T/W =6 Capacity for Gutter equations: Where: Qs = Discharge within the Roadway above the depressed section (cfs) Qw = Discharge within the depressed (gutter) section (cfs) Cf = 0.56 for English units Sx = Pavement cross slope (ft/ft) Ts = Width of flow in the roadway above depressed section So = Gutter longitudinal slope (ft/ft) Sw = Gutter depression cross slope (ft/ft) T = Spread (ft) W = Width of gutter depression (ft) Capacity solution Gutter Capacity - Drainage Basin 1 So =0.0050 *Minimum project slope of 0.5% Qs =1.65 cfs Eo =0.42 cfs Q =2.86 cfs A =1.215 sf V =2.35 ft/s BASIN Gutter Capacity (cfs) 25 Yr Design Flow (cfs) Capacity greater than 25- yr flow? 1 2.86 2.57 Yes Summary Gutter Capacity Calculations The gutter capacity is adequate for each drainage area. Timber Ridge Apartments SWQQQ QEQoW 0 S E1 QQ 2 1 O3 8 S3 5 X f S STSn CQ   1 8/3 XW XWo 11T/W /SS1 /SS1E             Page 1 of 1 Right Side Slope X:1 4.0 Left Side Slope X:1 27.0 *side slope at project minimum Channel Bottom Width 0.0 ft Flow depth 0.3 ft *depth of swale at project minimum Wetted Perimeter 9.34 ft Width 9.3 ft Flow Area 1.4 sf Hydraulic Radius 0.15 ft Manning's Roughness 0.025 Slope 0.004 *running slope at project minimum Average Velocity 1.06 ft/s Flow (mannings eqn) 1.48 cfs Proposed Swale Capacity = 1.48 cfs *calculated at project minimums Basin 2 Swale Inflow = 0.39 cfs Basin 3 Swale Inflow = 0.47 cfs Verdict? OK Timber Ridge Apartments Swale Capacity Calculations Timber Ridge Basins 1 & 2 - Retention Pond Stormwater Total Retention Calculations 9/15/2020 Calculation of Required Volume for Storm Detention Pond (Reference: Bozeman Stormwater Master Plan - 1982) Design Rainfall Freq. 10 year (see page III - 5 of master plan) IDF coefficient a 0.64 IDF coefficient b IDF coefficient n 0.65 Post-development Calculations - Includes Basins 1 & 2 Areas (ft2):Landscaping 28,547 0.20 Roof Area 10,182 0.90 Impervious 20,956 0.90 Total: 59,685 Weighted C: 0.57 Retention Pond Calculations: Q = CIA C = 0.57 (post-development) I = 0.41 in/hr (10-yr, 2-hr storm) A = 1.37 acres Q =0.32 cfs required retention storage (ft3) =2,274 ft3 Volume held between contours: Cumulative Contour Area (ft2) Delta V (ft3) Volume (ft3) 4732.00 80 4732.5 1,483 391 391 4733.0 1,881 841 1,232 4733.50 2,344 1,056 2,288 Design storage at 1.5' depth (ft3) =2,288 *Excludes shared access road as that area was accounted for in the neighboring Stoneridge Apartments project Retention pond COB.xls Timber Ridge Basin 3 - Buried Gravel Infiltrator Stormwater Total Retention Calculations 9/15/2020 Calculation of Required Volume for Infiltration Chambers (Reference: Bozeman Stormwater Master Plan - 1982) Design Rainfall Freq. 10 year (see page III - 5 of master plan) IDF coefficient a 0.64 IDF coefficient b IDF coefficient n 0.65 Post-development Calculations, Includes Basin 3 C Areas (ft2):Landscaping 5,216 0.20 Roof Area 3,867 0.90 Impervious 864 0.90 Total: 9,947 Weighted C: 0.53 Retention Chamber Calculations: Q = CIA C = 0.53 (post-development) I = 0.41 in/hr (10-yr, 2-hr storm) A = 0.23 acres Q =0.05 cfs required retention storage (ft3) =357 ft3 Chamber Volume: Chamber is a circle D= 6 in A= 0.20 sf Length of chamber L= 60 ft Vchamber= 12 cf Gravel Volume: Length= 64 ft Depth= 3.5 ft Width= 4 ft porosity 40 % Vgravel= 347 cf *subtracts Vchamber Design Volume at 3.5' depth=358 cf Please note that the above volume is conservative as it does not account for the rate of infiltration of runoff into the ground Appendix B: Stormwater Maintenance Plan Timber Ridge Apartments Storm Water Maintenance Plan Owner’s responsibility for routine inspection and maintenance 1. Perform quarterly inspection of and keep the curb and gutter, curb cut, curb chase, and round rock drainage swale areas free of leaves, rocks, sediment, and other debris. 2. Re-sod or seed damaged or maintained areas immediately. 3. Retention Pond: Perform yearly inspection of the retention pond and remove sediment if it accumulates to 3” above design grade. Keep the pond free of trash and other debris. 4. Buried Gravel Infiltration System: The buried gravel infiltration system maintenance is to include a quarterly inspection during the first year of operation and a yearly inspection thereafter. The area drain inlets can be used to pump water into the system and re-suspend accumulated sediment so that it may be pumped out. Flush and pump as inspection deems necessary. 5. Stormwater facilities shall be maintained by the owner or other responsible party in a condition so that the facilities will function as designed. 6. Waste shall be disposed of from maintenance of facilities in accordance with applicable federal, state and local laws and regulations. 7. The owner or other responsible party shall create and maintain records of installation and maintenance and repair for the life of the development and shall be made available to the engineering department upon request. 8. Owner to maintain and fund Operation and Maintenance of facilities. Owner, Timber Ridge Apartments Appendix C: Drainage Exhibit & Grading Plan WV LP TURBULENCE LANE TSCHACHE LANE FINISH FLOOR ELEVATION 4738.15 BASIN 2 IMPERVIOUS = 0 SF ROOF = 3,735 SF LANDSCAPING = 5,546 SF TOTAL = 9,281 SF BASIN 1 IMPERVIOUS = 20,956 SF ROOF = 6,457 SF LANDSCAPING = 23,001 SF TOTAL = 50,414 SF BASIN 3 IMPERVIOUS = 864 SF ROOF = 3,867 SF LANDSCAPING = 5,216 SF TOTAL = 9,947 SF BASIN 4 IMPERVIOUS = 0 SF ROOF = 0 SF LANDSCAPING = 5,859 SF TOTAL = 5,859 SF 1 inch = 0 SCALE 50' 100'25'50' SD1.0MADISON ENGINEERING 895 TECHNOLOGY BLVD, STE 203, BOZEMAN, MT 59718 PHONE (406) 586-0262 TIMBER RIDGE APARTMENTS STORM WATER DRAINAGE EXHIBIT POST-DEV. DRAINAGE AREA DELINEATION BOZEMAN, MT LEGEND WV FINISH FLOOR ELEVATION 4738.15 WV FINISH FLOOR ELEVATION 4738.15 SHEET MA D I S O N E N G I N E E R I N G 89 5 T E C H N O L O G Y B L V D S T E 2 0 3 BO Z E M A N , M T 5 9 7 1 8 (4 0 6 ) 5 8 6 - 0 2 6 2 1" = 0 SCALE 20 401020 TIMBER RIDGE GRADING PLAN C1.2 TI M B E R R I D G E GR A D I N G A N D D R A I N A G E P L A N 27 6 9 T S C H A C H E GRADING CONTOURSGRADING SPOT GRADES AND NOTES