Loading...
HomeMy WebLinkAboutResolution 5221 Authorizing Funding from the Trails, Open Space and Parks Bond Fund for the West Side Pathways and Trails Connection Project RESOLUTION 5221 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, TO AUTHORIZE FUNDING FROM THE TRAILS, OPEN SPACE AND PARKS BOND FUND FOR THE WEST SIDE PATHWAYS AND TRAILS CONNECTION PROJECT WHEREAS, in Resolution No. 4386 the City Commission committed to the designation of an advisory board or committee to review and make recommendations to the Commission on proposals for use of Trails, Open Space, and Parks Bond Fund (TOP Bond Fund) as said fund was approved by the voters of the City of Bozeman on November 6, 2012; and WHEREAS, on April 15, 2013 the Bozeman City Commission appointed the Trails, Open Space and Parks Committee (TOP Committee) to assist the City Commission with the duties stated within Resolution No. 4386; and WHEREAS, on August 20, 2020 the TOP Committee reviewed and scored the West Side Pathways and Trails Connection Project (the “Project”) utilizing the City Commission approved evaluation criteria established within Resolution No. 4471 and found that the Project collectively scored on average more than five affirmative evaluations on the Rough Cut Matrix and over 60% of the total points possible on each of the Community Benefit Matrix and the Prevailing Characteristics Parks Matrix; and WHEREAS, community need for this critical east-west trail connection has increased due to the opening of Gallatin High School, Bozeman Sports Park, Story Mill Park and the Trail to the M and Drinking Horse and increased development in the northwest quadrant; and WHEREAS, this project aligns and is consistent with goals set forth in the City of Bozeman Parks, Recreation Open Space and Trails (PROST) plan; and WHEREAS, this Project fulfills goals set forth in the Bozeman Community Plan by connecting the community using trails; and DocuSign Envelope ID: F2F1E865-715D-46C8-AEBA-59EFB95BF184 WHEREAS, the TOP Bond Fund will provide approximately 27% of the project costs due to additional fundraising efforts by community partners and other City of Bozeman parks, transportation and urban renewal funding. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana: Section 1 Funding / Authority. The Commission hereby authorizes additional funding in the amount of $99,612.51 from the current balance of the Trails, Open Space and Parks Bond fund for the Gallatin Valley Land Trust West Side Pathways and Trails Connection. Section 2 Findings. The Commission hereby concurs with the determinations of the TOP Committee for the Project and finds the Project meets or exceeds the requirements for the TOP Bond Fund as established in Resolution No. 4471. The Commission also finds that the Project included in this Resolution fulfills the intent, findings, policy, and purposes of the Open Space Land and Voluntary Conservation Easement Act (Title 76, Chpt. 6, MCA) (the Act). Section 3 Project. The primary goals of the project are: • Complete connections between existing trails along and feeding into the primary Project routes; • Repair trails within and feeding into the primary Project routes; • Improve the safety of trails at vehicular intersections; • Establish and install a replicable wayfinding package; and • Use trail counters to measure the impact of improvements and other conditions on trail use. Section 4 Title and Administration. The City of Bozeman will own, manage and maintain the completed Project and any and all site amenities associated with the project except as established by agreements with MDT or other landowners. The completed Project will be managed and maintained by the City of Bozeman Parks and Recreation, and Public Works Departments. The City may enter into contracts with other persons or entities for development or management of any aspect of developing the Project. DocuSign Envelope ID: F2F1E865-715D-46C8-AEBA-59EFB95BF184 Section 5 Funding. The total cost of the project is $345,000. The Gallatin Valley Land Trust has committed to providing matching funding and in-kind contribution in the amount to be determined in a Memorandum of Understanding between the City and the applicants. The Gallatin Valley Land Trust’s commitment will be memorialized in a binding agreement to be approved by the City Commission prior to expenditure of any funds under this Resolution as stated in section one above. Section 6 TOP Committee Evaluation. A majority of the TOP Committee approves the use of TOP Bond funds for the Project. The TOP Committee scores are as follows: TOP – Rough Cut Matrix: West Side Pathways and Trails Connection Project Member 1 Member 2 Member 3 Member 4 Average Score Guiding Docs Resolution 4386 1 1 1 1 PROST Plan 1 1 1 1 Community Plan 1 1 1 1 Balance Project balances types of parks, trails, os in and around Bozeman 1 1 1 1 Maintenance Feasible 1 1 1 1 Opportunity Long-term investment 1 1 1 1 Partnership opportunity 1 1 1 1 Leverage bond funds 0 1 1 1 TOTAL 7 8 8 8 7.75 TOP – Community Benefit Matrix: West Side Pathways and Trails Connection Project Member 1 Member 2 Member 3 Member 4 Member 5 Average Score Variety 5 5 3 4 5 Distribution 5 4 3 5 4 Enhancement 5 5 4 5 5 Balance 5 3 4 4 3 Leverage 4 4 3 5 5 Connections 5 4 5 5 5 TOTAL 29 25 22 28 27 131 Percentage of Possible 150 87.33 DocuSign Envelope ID: F2F1E865-715D-46C8-AEBA-59EFB95BF184 TOP – Prevailing Characteristics Matrix: West Side Pathways and Trails Connection Project Member 1 - score Member 2 - score Member 3 - score Member 4 - score Member 5 - score TOTAL ID'd in the PROST or judged beneficial 25 25 20 25 25 Trail would link important destinations 25 20 20 20 20 Trail would become a rec/transp complement 20 12 20 20 20 aesthetic, cultural, historical or nr values 15 9 6 15 12 minimal negative impacts 15 15 15 15 15 TOTAL 100 81 81 95 92 449.0 PERCENT of possible 300 points 89.80 PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 13th day of October, 2020. ___________________________________ CYNTHIA L. ANDRUS Mayor ATTEST: ________________________________________ MIKE MAAS City Clerk APPROVED AS TO FORM: ___________________________________ GREG SULLIVAN City Attorney DocuSign Envelope ID: F2F1E865-715D-46C8-AEBA-59EFB95BF184