HomeMy WebLinkAbout03 - Design Report - The Village Downtown - Stormwater c.,.� C� $0cd 2
t J(d
STORM WATER MANAGEMENT
DESIGN REPORT
"THE VILLAGE DOWNTOWN"
Prepared for:
Delaney & Company Inc.
101 East Main, Bozeman, MT 59715
Prepared by:
C & H]Engineering and Surveying, Inc.
205 Edelweiss
Bozeman, MT 59718
(406) 587-1115
Project Number: 02026.3
December, 2003
STORM WATER MANAGEMENT
Summary
STORM WATER run-off from the public right-of-way will be directed to two storm water
detention areas. One of these areas will be located on Lot#2 adjacent to Mill Creek(Detention
Pond #1). This area will detain storm water run off from the public right-of-way and a portion of
Lot#1 and #2. The other detention area will be constructed on Lot#4 east of the cul-de-sac
adjacent to the emergency access road and easement(Detention Pond#2). This area will detain
storm water run off from the public right-of-way and a portion of Lots #3, #4 and 45. The
drainage areas contributing to each of the storage areas are highlighted on the overall
grading/drainage plan enclosed in Appendix A.
The storm water runoff rate was calculated with the rational formula as shown. A runoff
coefficient (C) of 0.90 applicable to hard surfaces, a runoff coefficient(C) of 0.85 for house
development, and a runoff coefficient of 0.30 for residential lawns/landscaping was used for the
system. For portions of the drainage areas found on individual lots without building layouts a
runoff coefficient of 0.50 was used. This is the runoff coefficient recommended in the City of
Bozeman Storm water Master Plan for high density residential areas. For portions of the drainage
areas in which building layouts are predetermined(on Lots 1 &2) the runoff coefficient was
calculated as follows:
Individual Lots
Impervious Area(C=0.90) =410 ft2
Roof Area(C=0.85) =2,556 ft2
Grass and Landscaping(C=0.30) = 1,714 ft2
Total =4,680 ft2
Mean C = [(0.90x410 ft2)+(O.g5x2,556 ft2)+(0.30x1,714)]/4,680 ft2 = 0.67
Design Report-Page I of 10
Detention Area#1
Detention Area#1 handles the runoff generated from Drainage Area#1 and#3. Please see the
grading and drainage plan (Appendix A).
The storm water runoff surface areas for Drainage Area#1 were calculated as follows:
CONTRIBUTING AREAS
Impervious Area(C=0.90) = 55,333 ft2
Grass and Landscaping(C=0.30) =49,564 ft2
Lot Area(C=0.67) = 60,840 ft2
Total = 165,737 ft2
=3.8048 acres
The storm water runoff surface areas for Drainage Area#3 were calculated as follows:
CONTRIBUTING AREAS
Impervious Area(C=0.90) =9,896 ft2
Grass and Landscaping(C=0.30) =48,436 ft2
Lot Area(C=0.67) =30,420 ft2
Total =88,752 ft2
=2.0375 acres
Mean C= [(0.90x65,229 ft2)+(0.3008,000 ft2)+(0.67x91,260))/254,489 ft'- = 0.59
Overland travel time is based upon the length of time it would take a drop of water to travel from
the furthest point in the drainage area to Detention Area#1. In this case the furthest point is the
high point located in the center of the subdivision. The time of concentration is calculated on
Figure I-1 in Appendix A. The travel time is calculated to be 30.5 minutes, or 0.5083 hours.
Using the formula for the 10 year storm event a storm intensity and flow is calculated in the
following formulas:
Design Report-Page 2 of 10
I,o =0.64X-_65 = 0.64 (0.5083)-65 = 0.9935 in/hr
The storage basin located in the detention structure can have a release rate of pre-development
flow. The C coefficient for predevelopment is 0.20 and the release rate is calculated as follows:
Qlo= CIA = 0.20 (0.9935 in/hr)(5.8423)= 1.16 cfs *111, Release rate
The maximum required storage is calculated below by varying the storm duration and holding the
release rate at 1.16 cfs and using a C of 0.59.
Detentioni Pond #1
c = 0.59
A= 5.8423acres
release = 1.16cfs
Storm Storm Runoff Release Required
length(min)len th hrs Intensity Q future Volume Volume Storage
28 0.466667 1.05033 3.620441 6082.34 1948.8 4133.54
29 0.483333 1.026643 3.538795 6157.504 2018.4 4139.104
30 0.5 1.004268 3.461667 6231.001 2088 4143.001
31 0.516667 0.98309 3.388668 6302.923 2157.6 4145.323
32 0.533333 0.96301 3.319454 6373.352 2227.2 4146.15
33 0.55 0.94394 3.253719 6442.364 2296.8 4145.564
34 0.566667 0.9258 3.191191 6510.031 2366.4 4143.631
35 0.583333 0.908519 3.131626 6576.415 2436 4140.415
36 0.6 0.892035 3.074805 6641.578 2505.6 4135.978
37 0.616667 0.876289 3.020529 6705.575 2575.2 4130.375
Detention Pond#1 will be constructed to a depth of 1.5 feet with a mid-depth surface area of
2,770 square feet. With 4:1 side slopes the detention pond will contain a volume of 4,155 cubic
feet.
OUTLET CONTROL STRUCTURE SIZING
The outlet control structure for Detention Pond#1 needs to limit the release rate to the
predevelopment runoff rate of 1.16.cfs. The slot width is sized using the following equation:
Q= CLH3iz
Where:Q=Discharge(efs)
C =Weir Coefficient=3.33
L=Horizontal Length (feet)
Design Report-Page 3 of 10
H=Head (feet)
For the outlet control structure detailed in Appendix B.
L= (L 16 cfs)/(3.33 x 1.5"') = 0.155 feet= 1.86 inches
The weir needs to be 1.86" wide in order to limit the release rate to 1.16 cfs.
STORM SEWER INFRASTRUCTURE
15" RCP crossing Village Boulevard
This pipe carries the storm water flowing down the south side of Village Boulevard under the road
towards detention pond#1(%2 of Drainage Area#1).
Furthest point in drainage area=lots adjacent to high point on Village Boulevard
Size of Drainage Area = 82,868 ft' = 1.9024 acres
Mean C = 0.64
Time of Concentration
Overland flow(100 ft @ 1.0%, C=0.30)= 13.5 min.(see Figure I-1, Appendix A)
Gutter flow(697 ft @ 0.90% avg.slope)
V= (1.486/n)R"'S'/2 (n=0.013, A=1.24 ft, P=9.23, R2/1=0.2623,
S'/2=0.0949)
`J=2.85 ft/s
T= 697 ft/2.85 ft/s/60s/min =4.08 min
Total Time of Concentration = 17.58 minutes(0.293 hours)
For a 25-year storm event I25 =0.78X-.64 =0.78(0.293)-.64= 1.7112 in/hr
Q25 =CIA= 0.64(1.7112 in/hr)(1.9024 acres) =2.08 cfs
Calculations are enclosed in Appendix A for a 15" PVC pipe at 0.40% slope. The 15-inch
pipe will flow at a depth of 7.58 inches with a velocity of 3.34 ft/sec.
18" RCP from Village Boulevard to Detention Area
This pipe carries the storm water from all of Drainage Area#1(3.8048 acres). The time of
concentration for all of Drainage Area#1 is identical to the time of concentration for the south half
Design Report-Page 4 of 10
of the drainage area calculated above.
Total Time of Concentration = 17.58 minutes(0.293 hours)
For a 25-year storm event Its= 0.78X-•64=0.78(0.293)-.64= 1.7112 in/hr
Q25 =CIA=0.64(1.7112 in/hr)(3.8048 acres) =4.17 cfs
Calculations are enclosed in Appendix A for an 18"PVC pipe at 0.50% slope. The 18-
inch pipe will flow at a depth of 9.65 inches with a velocity of 4.32 ft/sec.
Swale from Private Road to Detention Area#1
The swale constructed from the private road on the north side of Village Boulevard to Detention
Area#1 must be large enough to handle the runoff generated.by all of Drainage Area'#3.
Furthest point in drainage area= eastern end of Drainage Area#3
Size of Drainage Area = 88,752 ft2=2.0375 acres
Mean C =0.49
Time of Concentration
Overland flow(500 ft @ 1.25%,C=0.30)=31.5 min.(see Figure I-1, Appendix A)
=0.525 hours
For a 25-year storm event I25=0.78X--"=0.78(0.525)-.14= 1.178 in/hr
Q25=CIA= 0.49(1.l 78.int )(2.0375 acres) = 1.18 cfs
Calculations are enclosed in Appendix A for swale I' deep with a P wide bottom and 4:1
side slopes. The swale will flow at a depth of-74U inches with a velocity of 3.34 ft/sec.
Detention Area #2
Detention Area#2 handles the runoff generated from Drainage Area#2 and#7. Please see the
grading and drainage plan (Appendix A).
The storm water runoff surface areas for Drainage Area#2 were calculated as follows:
CONTRIBUTING AREAS
i
Impervious Area(C=0.90) =99,136 ft2
Grass and Landscaping(C=0.30) =70,277 ft2
Design Report-Page 5 of 10
Lot Area(C=0.67) =32,760 ft2
Future Lot Area(C=0.50) =25,382 ft2
Total =227,555 ft2
= 5.2239 acres
The storm water runoff surface areas for Drainage Area#7 were calculated as follows:
CONTRIBUTING AREAS
Future Lot Area(C=0.50) = 109,498 ft2
=2.5137 acres
Mean C = [(0.90x99,136 ft2)+(0.30x70,277 ft2)+(0.67x32,760)+(0.50x134,880)j/337,053 ft2
=0.59
Overland travel time is based upon the length of time it would take a drop of water to travel from
the furthest point in the drainage area to Detention Area#2. In this case the furthest point is the
high point located in the center of the subdivision. The time of concentration is calculated on
Figure I-1 in Appendix A. The travel time is calculated to be 35 minutes, or 0.5833 hours.
Using the formula for the 10 year storm duration a storm intensity and flow is calculated in the
following formulas:
I10 =0.64X--65 = 0.64 (0.5833)-.61=0.9085 in/hr
The storage basin located in the detention structure can have a release rate of pre-development
flow. The C coefficient for this is 0.20 and the release rate is shown in the following:
For pre-development, the C coefficient=0.20
Q,o= CIA=0.20 (0.9085 in/1-ir)(7.7377) = 1.40 efs *111, Release rate
The maximum required storage is calculated below by varying the storm duration and holding the
Design Report-Page 6 of 10
release rate at 1.40 cfs and using a C of 0.59.
Detention Pond #2
c = 0.59
A = 7.7377acres
release = 1.4cfs
Storm Storm Runoff Release Required
lenoth(min)len th hrs Intensity Q future Volume Volume Storage
34 0.566667 0.9258 4.2265 8622.06 2856 5766.06
35 0.583333 0.908519 4.14761 8709.982 2940 5769.982
36 0.6 0.892035 4.072354 8796.285 3024 5772.285
37 0.616667 0.876289 4.00047 8881 044 3108 5773 04
38 0.633333 0.86123 3.931722 8964.327 3192 5772.327
39 0.65 0.846811 3.865896 9046.197 3276 5770.197
40 0,666667 0.832989 3.802797 9126.714 3360 5766.714
41 0.683333 0.819726 3.742249 9205.932 3444 5761.932
42 0.7 0.806986 3,684089 9283.905 3528 5755.905
43 0.716667 0.794738 3.628171 9360.68 3612 5748.68
Detention Pond#2 will be constructed to a depth of 1.5 feet with a mid-depth surface area of
3,850 square feet. With 4:1 side slopes the detention pond will contain a volume of 5,775 cubic
feet.
OUTLET CONTROL STRUCTURE SIZING
The outlet control structure for Detention Pond#2 needs to limit the release rate to the
predevelopment runoff rate of 1.40 cfs. The slot width is sized using the following equation:
Q = CLH3i2
Where:Q=Discharge(cfs)
C=Weir Coefficient= 3.33
L=Horizontal Length(feet)
H=Head (feet)
For the outlet control structure detailed in Appendix B.
L=(1.40 cfs)/(3.33 x 1.53r2) = 0.187 feet=2.24 inches
The weir needs to be 2.24" wide in order to limit the release rate to 1.40 cfs.
Design Report-Page 7 of 10
STORM SEWER INFRASTRUCTURE
18" PVC from east end of Village Boulevard to Detention Area #2
This pipe carries the storm water from the eastern half of Village Boulevard(Drainage Area#2).
Furthest point in drainage area=lots adjacent to high point on Village Boulevard
Size of Drainage Area =227,555 ft2= 5.2239 acres
Mean C = 0.64
Time of Concentration
Overland flow(100 ft @ 1.0%, C=0.30)= 13.5 min.(see Figure I-1, Appendix A)
Gutter flow(300 ft @ 1.50% avg.slope)
V=(1.486/n)R213S'l2 (n=0.013; A=1.24 ft, P=9.23, R2/3=0.2623,
S 1/2=0.1225)
V=3.67 ft/s
T=300 ft/3.67 ft/s/60s/min = 1.36 min
Gutter flow(660 ft @ 4.7% avg.slope)
V= (1.486/n)R2/3S'/2 (n=0.013, A=1.24 ft, P=9.23, R2/3=0.2623,
S'/2=0.2168)
V=6.5 ft/s
T= 660 ft/6.5 ft/s/60s/min = 1.69 min
Total Time of Concentration = 16.55 minutes(0.2758 hours)
For a 25-year storm event I25 = 0.78X-.G4=0.78(0.2758)-G4= 1.78 in/hr
Q25 = CIA= 0.64(1.78 in/hr)(5.2239 acres) = 5.95 cfs
Calculations are enclosed in Appendix A for a 18" PVC pipe at 0.50% slope. The 18-inch
pipe will flow at a depth of 12.19 inches with a velocity of 4.67 ft/sec.
Retention Pond#3
Retention Pond#3 handles the runoff from Drainage Area#4
Design Report-Page 8 of 10
CONTRIBUTING AREAS
Future Lot Development(C=0.50) =213,501 ft2
=4.9013 acres
For a 10-yr 2-hr storm event:
V= CdA
V=0.50 x 0.068 ft x 213,501 ft2 =7,259 ft' =volume to be retained
The proposed pond has a mid-depth surface area of 4,840 ft2. At a depth of 1.50 feet, the
pond has a storage volume of 7,260 ft'.
Retention Pond #4
Retention Pond#4 handles the runoff from Drainage Area#5
Impervious Area(C=0.90) =9,506 ft2
Grass and Landscaping(C=0.30) =40,780 ft2
Lot Area(C=0.67) =25,614 ft2
Total =75,900 ft2
= 1.7424 acres
Mean C = [(0.90x 9,506ft2)+(0.30x40,780 ft2)+(0.67x25,614)]/75,900 ft2 = 0.50
For a 10-yr 2-hr storm event:
V= CdA
V= 0.50 x 0.068 ft x 75,900 ft2=2,581 ft' =volume to be retained
The proposed pond has a mid-depth surface area of 1,622 ft2. At a depth of 1.50 feet, the
pond has a storage volume of 2,433 ft'.
Design Report-Page 9 of 10
Retention Pond #5
Retention Pond#5 handles the runoff from Drainage Area#6
CONTRIBUTING AREAS
Future Lot Area(C=0.50) = 134,483 ft'
=3.0873 acres
For a 10-yr 2-hr storm event:
V=CdA
V = 0.50 x 0.068 ft x 134,483 ft' =4,572 ft' =volume to'be retained
The proposed pond has a raid-depth surface area of 3,050 ft2. At a depth of 1.50 feet, the
pond has a storage volume of 4,575 ft3.
CAPACITY OF CURB & GUTTER
The curb section with the largest contributing area is located at the east end of Village Boulevard.
Each curb carries %2 of the drainage from Drainage Area#2 with a minimum slope of 1.23%.
The capacity of the curb and gutter at 1.23% slope with a depth of water 0.15'below top of curb is
calculated as follows:
Q=(1.486/n)AR2i3S1/2
n= 0.013 for Concrete
A= 1.24 ft2
P = 9.23 ft
R=A/P = 1,24/9.23 =0.1343 ft
R2/3 =0.2623 .ft
S = 0.0123 ft/ft
SI/2= 0.1109 ft/ft
Q=(1.486/0.013)(1.24)(0.2623)(0.1109)=4.12 cfs.
The maximum flowrate for all of Drainage Area#2, for a 25-year event, was previously calculated
to be 5.95 cfs. The flow within each curb section is equal to 5.95cfs/2 or 2.98 cfs.
2.98 cfs < 4.12 cfs — Gutter capacity is adequate
02026.3/office/design report
Design Report Page 10 of 10
APPENDIX A
♦JI♦� \
C
i
It
1 \ \•l� , \ \\\\ F /
♦` 1 1 t A
NO
jJ
AuI
tn� �II 3¢ ✓ley✓/+®�' ®!p y�oe �.�, !�i1 /%"s� '\ \\
III 8s°+®�\
II \\ \�
iAi
1200 I 140
I I
I I I I I
I I I I I 120
Li
I I t o I I I I I I I I
I II 11 I I I IIIIIII uj
800 ! I I I i I I I I ( I I I i I CO s
II II I III II �
I ! I l I I I I I I I I I I I I z
booLu
I Iui
z
o
LL-
40o
`'
j7-
< .
� � I � I I I I i I-- ' 1 ► I I
I I ► I I I I I !,� I I Q
0o 9 I I I I I I I. �" I J I I X >
20
� � ' � i I I ! ! I ► I � I I
i l l I I I I I 0
FIGURE I-1 TIME OF CONCENTRATION (Rational Formula)
2Do
v
1200 140
P I( I
1000 I i ° 10
° I I I I I I 120
i o I II 1Y I I
W
600 1 i ) I i 100 z
Z
LLJ
LLJ
1 i I11I
600 I I I I �o z
W
U
" I I I i o
i G i o
Q 4 00 -) I I I I I s0
i o
Z J
a I _ I I I I LJ
200 40 0o s
1 I XI ► I
i
I �
0 I I I - 20
I
i
FIGURE I-I TIME OF CONCENTRATION (Rational Formula)
26
15" PVC crossing village Boulevard
Manning Pipe Calculator
Given Input Data:
shape. . . . . . . . . . . . . . . . . . . . . . . . . . . Circular
solving for . . . . . . . . . . . . . . . . . . . . . Depth of Flow
Diameter . . . . . . . . . . . . . . . . . . . . . . . . 15.0000 in
Flowrate . . . . . . . . . . . . . . . . . . . . . . . . 2.0800 cfs
slope . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0040 ft/ft
Manning's n . . . . . . . . . . . . . . . . . . . . . 0.0130
Computed Results:
Depth . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.5804 in
Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2272 ft2
wetted Area 0.6220 ft2
wetted Perimeter . . . . . . . . . . . . . . . . 23.7228 in
Perimeter. . . . . . . . . . . . . . . . . . . . . . 47.1239 in
Velocity . . . . . . . . . . . . . . . . . . . . . . . . 3.3442 fps
Hydraulic -Radius 3.7754 in
Percent Full . . . . . . . . . . . . . . . . . . . . 50.5361
Full flow Flowrate . . . . . . . . . . . . . . 4.0855 cfs
Full flow velocity . . . . . . . . . . . . . . 3.3292 fps
Critical information
Critical depth . . . . . . . . . . . . . . . . . . 6.9013 in
Critical slope . . . . . . . . . . . . . . . . . . 0.0055 ft/ft
Critical velocity . . . . . . . . . . . . . . . 3.7730 fps
Critical area . . . . . . . . . . . . . . . . . . . 0.5513 ft2
Critical perimeter . . . . . . . . . . . . . . 22.3632 in
Critical hydraulic radius . . . . . . . 3.5498 in
Critical top width . . . . . . . . . . . . . . 14.9521 in
specific energy 0.8055 ft
Minimum energy . . . . . . . . . . . . . . . . . . 0.8627 ft
Froude number 0.8358
Flow condition . . . . . . . . . . . . . subcritical
18" PVC from village Boulevard to Detention Area #1
Manning Pipe Calculator
Given Input Data:
shape . . . . . . . . . . . . . . . . . . . . . . . Circular
solving for . . . . . . . . . . . . . . . . . . . . . Depth of Flow
Diameter . . . . . . . . . . . . . . . . . . . . . . . . 18.0000 in
Flowrate . . . . . . . . . . . . . . . . . . . . . . . . 4.1700 cfs
slope . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0050 ft/ft
manning's n . . . . . . . . . . . . . . . . . . . . . 0.0130
computed Results:
Depth . . . . . . . . . . . . . . . . . . . . . . . . . . . 9.6462 in
Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.7671 ft2
wetted Area 0.9643 ft2
wetted Perimeter 29.5678 in
.Perimeter 56.5487 in
velocity . 4.3245 fps
Hydraulic Radius . . . . . . . . . . . . . . 4.6962 in
Percent Full . . . . . . . . . . . . . . . . . . . . 53.5898
Full flow Flowrate . . . . . . . . . . . . . . 7.4277 cfs
Full flow velocity . . . . . . . . . . . . . . 4.2032 fps
Critical Information
Critical depth . . . . . . . . . . . . . . . . . . 9.3909 in
Critical slope . . . . . . . . . . . . . . . . . . 0.0055 ft/ft
Critical velocity . . . . . . . . . . . . . . . 4.4722 fps
Critical area . . . . . . . . . . . . . . . . . . . 0.9324 ft2
Critical perimeter . . . . . . . . . . . . . . 29.0562 in
Critical hydraulic radius . . . . . . . 4.6211 in
Critical top width . . . . . . . . . . . . . . 18.0000 in
specific energy . . . . . . . . . . . . . . . . . 1.0944 ft
Minimum energy . . . . . . . . . . . . . . . . . . 1.1739 ft
Froude number ' . . . . . . . . . . . . . . . 0.9509
FTow"condition .. . . . . . . . . . . . . . . . . . subcritical
1200 140
I I
I I (
1000 11 I I ° I o I I I I 120
+ I w I o� I
i
o I I
so o 1 I I I I I 1- I I oo z
_ I �
z
I I 1 1 i I I a
600 I I I
1 I I i ao W
i I I z
z
_ o
} 400 I I 1 1 1 I I 60
►-
- '
Z
a
o o
40 G
I I I i l l
0 I i
20
I � �
� I I
I I ( 0
FIGURE I-I TIME OF CONCENTRATION (Rational Formula)
26
Swale from Drainage Area #3 to Detention Pond #1
Channel Calculator
Given Input Data:
shape . . . . . . . . . . . . . . . . . . . . . . . . . . . Trapezoidal
solving for . . . . . . . . . . . . . . . . . . . . . Depth of Flow
Flowrate . . . . . . . . . . . . . . . . . . . . . . . . 1.1800 cfs
Slope . . . . . . . . . . . . . . . . . . . . . . . . 0.0050 ft/ft
Manning's n . . . . . . . . . . . . . . . . . . . . . 0.0350
Height . . . . . . . . . . . . . . . . . . . . . 12.0000 in
Bottom width . . . . . . . . . . . . . . . . . . . . 12.0000 in
Left slope . . . . . . . . . . . . . . . . . . . . . . 0.2500 ft/ft (v/H)
Right slope . . . . . . . . . . . . . . . . . . . . . 0.2500 ft/ft (v/H)
Computed Results:
Depth 4.7409 in
velocity . . . . . . . . . . . . . . . . . . . . . 1.1575 fps
Full Flowrate . . . . . . . . . . . . . . . . . . . 9.9635 cfs
Flow area 1.0194 ft2
Flow perimeter . . ... . . . . . . . . . . . . . . 51.0941 in
Hydraulic radius . . . . . . . . . . . . . . . . 2.8730 in
Top width . . . . . . . . . . . . . . . . . . . . . . . 49.9269 in
Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.0000 ft2
Perimeter . . . . . . . . . . . . . . . . . . . . 110.9545 in
Percent full . . . . . . . . . . . . . . . . . . . . 39.5072
Critical Information
Critical depth . . . . . . . . . . . . . . . . . . 3.0298 in
critical slope . . . . . . . . . . . . . . . . . 0.0332 ft/ft
Critical velocity . . . . . . . . . . . . . . . 2.3252 fps
critical area . . . . . . . . . . . . . . . . . . . 0.5075 ft2
critical perimeter . . . . . . . . . . . . . . 36.9844 in
Critical hydraulic radius . . . . . . . 1.9759 in
Critical top width . . 36.2385 in
Specific *energy . . ... . . . . . . . . ... . . ` 0.4159 ft
Minimum energy . . . . . . . . . . . . . . . . . . 0.3787 ft
Froude number . . . . . . . . . . . . . . . . . . . 0.4123
Flow condition . . . . . . . . . . . . . . . . . . Subcritical
� r
f
( LI
1200
140
1000
0
� ° I 120
lu o\
O
Boo
&0
z
Li
Li T
600
so
LIJ
o 0
G
J ` ti
uj 400 I � I I � � � I 60 0
o
z
'20�J 1--` I J i + J� r'r r' I i L
OI 40 0 v
f 20
I
0
FIGURE I-1 TIME OF CONCENTRATION (Rational Formula)
26
18" PVC from east end of village Boulevard to Detention Area #2
Manning Pipe Calculator
Given Input Data:
shape . . . . . . . . . . . . . . . . . . . . . . . . . . . Circular
Solving for . . . . . . . . . . . . . . . . . . . . . Depth of Flow
Diameter 18.0000 in
Flowrate . . . . . . . . . . . . . . . . . . . . . . . . 5.9500 cfs
Slope . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0050 ft/ft
Mann-ing`s n . . . . . . . . . . . . . . . . . . . . . 0.0130
computed Results:
Depth 12.1903 in
Area . . . . . . . . . . . . . . . . . . . . . . . . . . 1.7671 ft2
wetted Area . . . . . . . . . . . . . . . . ... . . . 1.2738 ft2
wetted Perimeter 34.7968 in
Perimeter . . . . . . . . . . . . . . . . . . . . . . . 56.5487 in
velocity 4.6709 fps
Hydraulic Radius . . . . 5.2716 in
Percent Full 67.7240
Full flow Flowrate . . . . . . . . . . . . . . 7.4277 cfs
Full flow velocity 4.2032 fps
Critical Information
Critical depth . . . . . . . . . . . . . . . . . . 11.3857 in
Critical slope . . . . . . . . . . . . . . . . . 0.0060 ft/ft
Critical velocity . . . . . . . . . . . . . . . 5.0347 fps
Critical area . . . . . . . . . . . . . . . . . . . 1.1818 ft2
Critical perimeter 33.0458 in
Critical hydraulic radius . . . . . . . 5.1498 in
Critical top width . . . . . . . . . . . . . . 18.0000 in
Specific energy . . . . . . . . . . . . . . . . . 1.3485 ft
Minimum energy . . . . . . . . . . . . . . . . . . 1.4232 ft
Froude number . . . . . . . . . . . . . . . . . . . 0.8992
Flow condition . . . . . subcritical
0
v,
p �
a �
y
zd II
_ c;o
p II
ti
w
ti
.-3
i
i