Loading...
HomeMy WebLinkAbout006 - 100720 - A2-2 - SECOND FLOOR PLAN & ROOF PLAN2 A NOTE: 1.GUTTERS @ ALL EAVES. COLOR TO MATCH METAL ROOFING 2.DOWNSPOUTS TO DISCHARGE 3' FROM HOUSE OR AS RECOMMENDED BY GEO -TECHNICAL ENGINEER 3. ROOF PENETRATIONS TO BE SLEEVED WITH METAL OR PAINTED TO MATCH THE ROOF THEY PENETRATE. 4. G.C. TO DETERMINE FINAL LOCATIONS OF DOWNSPOUTS 5. ICE & WATER SHIELD TYP TO EXTEND AT ROOF EDGE TO 24" PAST INSIDE F.O.FRMG B C D 1 3 4 1" / 1 2 " 2" / 12" 2" / 1 2 " 7" / 1 2 " 7" / 1 2 " CLCL 1' - 6" 9' - 6" 1' - 6" 1' - 6" 26' - 0" 1' - 6" 1' - 6 " 14 ' - 0 " 1' - 6 " 17 ' - 0 " 3' - 0 " 30 ' - 6 " 2' - 0 " 35 ' - 6 " 27' - 0" 1' - 6" 24' - 0" 1' - 6" C L C L 1' - 6 " 18 ' - 6 1 / 2 " 1' - 6 " 21 ' - 6 1 / 2 " 3' - 0 " 30 ' - 6 " 33 ' - 6 " 2 C D 1 3 26' - 0" 14 ' - 0 " 5 1 / 2 " 3' - 1 " 3 1 / 2 " 4' - 2 " 5 1 / 2 " 5' - 1 " 12' - 6" 3' - 1" 5 1/2" 9' - 6" 13' - 0" 13' - 0" BATH RM 202 BEDROOM 201 Q DN 2' 8" X 6' 8" DRAWN BY: PR O J E C T # : RE V DE S C DA T E PH A S E PR E SD DD CD DA T E 1 2 3 4 A2-2 10.07.20 SE C O N D F L O O R P L A N & R O O F PL A N GU L B R A N S O N J O H N S O N A D U 41 6 S 6 T H A V E BO Z E M A N , M T 5 9 7 1 5 NC O A S E T --- Author - - - - - - - - 1/4" = 1'-0" A2-2 2 ROOF PLAN Roof Schedule Family and Type Area Basic Roof: 1x6 1/2" SOFFIT 149 SF Basic Roof: ASPHALT, 1/2" DKG 571 SF Basic Roof: DK MTL, 1/2" DKG 183 SF Basic Roof: DK MTL, 5/8" DKG, 2X4 TRUSS, 1/2" PLYWD 4 914 SF Grand total: 4 1817 SF NET SQUARE FOOTAGE Name Area HEATED SPACE 146 SF GARAGE 506 SF ADU SECOND FLOOR 289 SF ADU MAIN FLOOR 310 SF Grand total 1250 SF 1/4" = 1'-0" A2-2 1 2-SECOND FLOOR PLAN