HomeMy WebLinkAbout006 - 100720 - A2-2 - SECOND FLOOR PLAN & ROOF PLAN2
A
NOTE:
1.GUTTERS @ ALL EAVES. COLOR TO MATCH METAL ROOFING
2.DOWNSPOUTS TO DISCHARGE 3' FROM HOUSE OR AS RECOMMENDED BY GEO -TECHNICAL
ENGINEER
3. ROOF PENETRATIONS TO BE SLEEVED WITH METAL OR PAINTED TO MATCH THE ROOF THEY
PENETRATE.
4. G.C. TO DETERMINE FINAL LOCATIONS OF DOWNSPOUTS
5. ICE & WATER SHIELD TYP TO EXTEND AT ROOF EDGE TO 24" PAST INSIDE F.O.FRMG
B
C
D
1 3 4
1"
/
1
2
"
2" / 12"
2"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
CLCL
1' - 6" 9' - 6" 1' - 6"
1' - 6" 26' - 0" 1' - 6"
1'
-
6
"
14
'
-
0
"
1'
-
6
"
17
'
-
0
"
3'
-
0
"
30
'
-
6
"
2'
-
0
"
35
'
-
6
"
27' - 0"
1' - 6" 24' - 0" 1' - 6"
C L
C L
1'
-
6
"
18
'
-
6
1
/
2
"
1'
-
6
"
21
'
-
6
1
/
2
"
3'
-
0
"
30
'
-
6
"
33
'
-
6
"
2
C
D
1 3
26' - 0"
14
'
-
0
"
5
1
/
2
"
3'
-
1
"
3
1
/
2
"
4'
-
2
"
5
1
/
2
"
5'
-
1
"
12' - 6" 3' - 1" 5 1/2" 9' - 6"
13' - 0" 13' - 0"
BATH RM
202
BEDROOM
201 Q
DN
2' 8" X 6' 8"
DRAWN BY:
PR
O
J
E
C
T
#
:
RE
V
DE
S
C
DA
T
E
PH
A
S
E
PR
E
SD DD CD
DA
T
E
1 2 3 4
A2-2
10.07.20
SE
C
O
N
D
F
L
O
O
R
P
L
A
N
&
R
O
O
F
PL
A
N
GU
L
B
R
A
N
S
O
N
J
O
H
N
S
O
N
A
D
U
41
6
S
6
T
H
A
V
E
BO
Z
E
M
A
N
,
M
T
5
9
7
1
5
NC
O
A
S
E
T
---
Author
-
-
-
-
-
-
-
-
1/4" = 1'-0" A2-2
2 ROOF PLAN
Roof Schedule
Family and Type Area
Basic Roof: 1x6 1/2" SOFFIT 149 SF
Basic Roof: ASPHALT, 1/2" DKG 571 SF
Basic Roof: DK MTL, 1/2" DKG 183 SF
Basic Roof: DK MTL, 5/8" DKG, 2X4 TRUSS,
1/2" PLYWD 4
914 SF
Grand total: 4 1817 SF
NET SQUARE FOOTAGE
Name Area
HEATED SPACE 146 SF
GARAGE 506 SF
ADU SECOND FLOOR 289 SF
ADU MAIN FLOOR 310 SF
Grand total 1250 SF
1/4" = 1'-0" A2-2
1 2-SECOND FLOOR PLAN