HomeMy WebLinkAbout1_Storm_Drainage_Plan_pg 1-55_03-07-2018
STORM DRAINAGE PLAN
For Icon Apartment Homes at Ferguson Farm
Bozeman, Montana
prepared for:
Braxton & Klein Capital Partners, LLC
PO Box 11890
Bozeman, Montana
prepared by:
Sanderson Stewart
106 E. Babcock
Bozeman, MT 59715
March 2018
July 25, 2017
Updated March 7, 2018
Project No. 17007.02
STORM DRAINAGE PLAN
FOR
ICON APARTMENT HOMES AT FERGUSON FARM
BOZEMAN, MONTANA
OVERVIEW NARRATIVE
The purpose of this drainage plan is to quantify storm drainage improvements required for the
proposed Icon Apartment Homes at Ferguson Farm at 4605 West Babcock Road in Bozeman,
Montana. The site is located south of W. Babcock Street, west of Resort Drive, north of Fallon Street
and east of South Cottonwood Road. The approximately 20-acre lot will include 18 apartment
buildings, one clubhouse and pool and one maintenance building with a dog washing station. The 18
apartment buildings include a total of 336 units made up of one, two and three bedroom apartments.
Site improvements for the buildings will include drive aisles, sidewalks, parking lots and open space.
Two public easement access roads, Stafford Avenue and Palisade Drive, and one public city park will
be constructed as part of the proposed apartment community project.
Generally, the stormwater runoff within the apartment complex will be mitigated using pervious
pavers, manufactured ADS chamber systems and dry wells. The pervious pavers will treat the water
quality (the first 0.5-inch of runoff) and the water quantity volume (25-year storm event for all
durations). All infiltration systems for the apartment complex have been designed to infiltrate and
retain the 25-year storm event.
The site currently retains 6,037 CF in an existing detention pond near the southwest corner of the site.
The 6,037 CF is the cumulative volume of the runoff from the northern side of Fallon’s roadway
crown and the deficient runoff from the Ferguson Farm subdivision from the south.
Fallon Street, North of the roadway crown = 10-year, 2-hour runoff volume = 1,350 CF
Ferguson Farm’s Deficient volume = 4,687 CF
Total Runoff Volume = 6,037 CF
V:17007_02_Storm_Drainage_Plan_030716_SC 2 (03/07/18) SN/jil
This deficient runoff will be retained in an ADS chamber system (Chamber E) near the southwest
corner of the site that is detached from the Icon Apartment Homes stormwater system. And the
runoff from Fallon Street will be in Chamber A located at the northeast corner of the Stafford Avenue
and Palisades Drive intersection.
Runoff from Fallon Street and the portion of Stafford Avenue south of Palisade Drive and Palisade
Drive west of the crosswalk and south of the center roadway crown will be captured in storm drain
inlets and conveyed into an underground ADS chamber system (Chamber A) located at the northeast
corner of the Stafford Avenue and Palisade Drive intersection. Runoff from a portion of Stafford
Avenue north of Palisade Drive and Palisade Drive west of the crosswalk and north of the center
roadway crown is captured in inlets and conveyed to a chamber system (Chamber F) in the southwest
corner of the intersection of Stafford Avenue and West Babcock Street. Runoff from the east portion
Palisade Drive will be captured in storm drain inlets and retained in an underground ADS chamber
system (Chamber C) under Palisade Drive. Runoff from the northern portion of Resort Drive will be
captured and retained in an underground ADS chamber system. The southern portion Resort Drive
is captured in an existing inlet and conveyed to the development to the east. There is not an increase
in impervious cover or runoff to this existing inlet.
The stormwater system is designed to convey and infiltrate the peak flows from the 25-year storm
event. This is done in order to meet both the water quality and conveyance storm events described in
The City of Bozeman Design Standards and Specifications Policy , dated March 2004. In the scenario where the
area receives a larger storm event, the site has been designed to allow for large flows to spill over into
the adjacent roadways.
This report presents a summary of calculations performed to quantify the stormwater runoff for the
improved site. All design criteria and calculations are in accordance with The City of Bozeman Design
Standards and Specifications Policy , dated March 2004. The site stormwater improvements have been
designed with the intent to meet the current City of Bozeman drainage regulations for the entire site
to the extent feasible.
Specific site information and criteria are described below:
I. Project Information
A. Address: The physical address for the site is 4605 West Babcock St, Bozeman, MT
59718
B. Legal Description: The site is located on Lot 3A of Minor Subdivision 365
C. Total Area: The area of the site is approximately 19.87 acres including public access
easement area.
Street Easement: 2.70 acres
Park Easement: 1.61 acres
Apartment Community: 15.56 acres
V:17007_02_Storm_Drainage_Plan_030716_SC 3 (03/07/18) SN/jil
D. Existing Impervious Area:
Impervious Area – 0.00 acres
Pervious Area – 19.87 acres
E. Post-Development Impervious Area: As a result of the development, the site will
exhibit the following qualities:
Impervious Area – 14.27 acres
Pervious Area – 5.60 acres
F. Type of Development: The development will be high density apartment homes.
II. Storm Drain Design Methodology
Due to the large and compartmentalized site, 41 watersheds were delineated with individual
discharge locations in order to quantify the required detention volume and peak runoff
volumes. The individual watershed delineations are provided in a watershed figure in
Appendix A. Discharge locations are either ADS chamber systems, pervious pavers or dry
wells, and referred to as stormwater units for the remainder of the report. Individual
calculation spreadsheets for each watershed and stormwater unit combination is provided in
Appendix B, which calculates the required retention volume after infiltration and peak runoff
rate. Also in Appendix B is Table 1 which summarizes the inputs and results from each
watershed. The spreadsheets use the surface area calculations from the watershed delineations
to calculate the runoff coefficient and adjusted runoff coefficient based on a frequency factor
of 1.1. The adjusted runoff coefficient, area, intensity and rainfall duration is used to determine
the runoff volume. The discharge volume is calculated from the storm duration and the
discharge rate. A discharge rate for each stormwater unit was calculated to help determine the
required detention volume. The discharge rate is a function of the infiltration rate and square
footage of the stormwater unit, it calculates the rate that runoff exits the stormwater unit into
the natural gravels.
ℎ × ℎ ∗× ℎ × 1 12 × 1 ℎ 60 × 1 60 = ℎ
The natural gravels are located 3-feet below the existing surface and have high infiltration rates
and will be discussed in more detail later in this report. Tying the stormwater units into the
natural gravels allows the stormwater to infiltrate into the soils and restores the natural
hydrology of the site. It also allows for the detention volume to be reduced. The detention
volume is the difference between the runoff volume to the stormwater unit and the discharge
volume from the stormwater unit via infiltration. In many cases, the stormwater units are
infiltrating runoff quicker than runoff flow rate to the stormwater unit. A detention volume is
calculated when the stormwater unit cannot infiltrate at the rate of the incoming flow rate.
The size of the stormwater unit was determined through an iterative process. The length and
width of the stormwater unit was adjusted until the provided detention volume was greater
V:17007_02_Storm_Drainage_Plan_030716_SC 4 (03/07/18) SN/jil
than the required detention volume. That length and width was then used to design the
stormwater system.
A. Runoff Calculations:
The modified rational method was used to determine peak runoff rates and volumes. It was
assumed the rainfall is uniformly distributed over the area for the entire duration of the storm.
The rational formula provided in The City of Bozeman Standard Specifications and Policy was used
to calculate the peak runoff rates on site. The rainfall intensity for the site was calculated in
part by using Figure I-2 and I-3. The peak runoff rate occurs when the duration of the storm
equals the time of concentration. The provided time of concentration tools, Table I-2, Table
I-3 and Figure I-1, in The City of Bozeman’s Design Standard and Specifications Policy were used to
calculate the time of concentration for each of the major watersheds. However, since most
watersheds are predominately impervious cover, all watersheds used a conservative time of
concentration of 1-minute. The time of concentration was only relevant to the traditional (inlet
and piping) stormwater infrastructure systems since the pervious paver systems meet the
requirements for each rainfall duration. The runoff coefficient for a particular watershed is
constant for a similar land use. The runoff coefficients provided in Table I-1 were used in
calculating the peak runoff rates.
B. Infiltration Rates:
Five test pits were excavated in May of 2017. Groundwater was present at 6-feet below existing
ground surface and native gravels were present at 3-feet below ground surface. It is assumed
that seasonal high ground water is located at 6-feet below existing ground surface since the
test pits were excavated during the typical seasonal high ground water season. It is also
important to note that detention storage within the paver systems, chamber systems and
drywells is only accounted for in the first 3 feet, 5 feet and 5 feet below existing ground surface
elevation, respectively. Therefore, no required detention volume is accounted for below season
high ground water.
A geotechnical report has also been completed for the project in August 2017 and groundwater
was generally found at 6-feet below the existing surface. At one boring, located at the very
southwest corner of the site one boring showed groundwater at 2.2-feet deep. Besides the 2.2-
foot deep water level at one boring, the next highest groundwater level was at 5.8 feet deep. A
falling head infiltration test was completed at three of the five test pits and the average
infiltration rate was found to be 160 inches/hour. The data of the tests is included in Appendix
E. The design of the stormwater unit used an infiltration rate of 80 inches/hour to provide a
factor of safety of two.
C. Stormwater Unit Volumes
Paver System: 1 square foot of pave drain = 1 cubic foot of storage.
The project is proposing to use a 3-ft pervious paver section. The section, as shown on sheet
C9.1, is made up of 6-inch as paver, and 30 inches as stone base. Native gravels are located at
V:17007_02_Storm_Drainage_Plan_030716_SC 5 (03/07/18) SN/jil
3-feet below existing ground surface. This paver section was designed to ensure that the pavers
are tied into native gravels. As shown in Appendix C, the ACF environmental storage capacity
determination of PaveDrain spreadsheet shows that the proposed section of pave drain has
the capacity to hold 1 cubic of runoff per 1 square foot of pave drain section. In most cases,
the paver units were oversized in order to allow for the use of the mechanical installer because
cost of the additional pavers is less than the cost to hand install the smaller paver units. The
infiltration rate considered the entire area of the pervious paver unit.
" # $ %
= " # & ℎ ×" # ℎ ' 1 ()
1 )
Chamber System:
The online ADS StormTech Design Tool was used to calculate the detention volume in
conjunction with the Appendix C spreadsheets to calculate the volume after infiltration. A
general detail of the ADS StormTech Chamber system is provided on sheet C9.0. A trial and
error method was used between the Appendix B spreadsheets and the ADS StormTech Design
Tool to ensure that the length and width between the spreadsheet and the design tool match
and that the provided volume from the design tool was larger than the required volume from
the spreadsheet. The infiltration rate leaving the ADS system used the entire area of the
chamber system.
Dry Well:
The detention volumes of dry wells were calculated by using the radius and depth of the dry
well barrel. * + $ % = ,× -×* . ℎ
The dry well barrels proposed have a 15-inch radius and are 5-feet in depth. The infiltration
rate leaving the dry well system was assumed to be the surface area of the bottom of the barrel.
Most of the dry wells are located in shallow depressions. The storage provided in the
depressions is included in the storage capacity calculations for the dry wells. The volume
calculations for the depression areas are provided in Appendix C.
D. Water Quality
The development project is greater than one acre and therefore will infiltrate runoff generated
from the first 0.5-inches of rainfall from a 24-hour storm. Table 1 and Figure 1 in Appendix
A, show the locations of the watersheds on site. Table 1 shows the required storage volume
for each watershed calculated. The runoff calculations are in Appendix B. Table 2 outlines the
provided storage and type of stormwater unit for each watershed. Each stormwater unit retains
the 25-year storm and infiltrates the 25-year runoff volume in under 72 hours.
V:17007_02_Storm_Drainage_Plan_030716_SC 6 (03/07/18) SN/jil
The stormwater storage facilities are designed to remove pollutants such as solids, silts, oils,
and greases. There is no oil/water separator required on site. The media below the pavers and
chambers will filter any solids, silts, oils and greases.
All inlets and manholes are designed in accordance with the City of Bozeman standard details.
However, a larger 18-inch sump has been design in the manholes upstream of the ADS
chamber systems.
Alignment between manholes is straight. However, there are limited manholes onsite due to
the use of pervious paver. Storm sewer systems are designed with a slope and pipe diameter
as to ensure a velocity of 3-fps.
The storm sewers within the public access easement are public and will be maintained by the
City of Bozeman. A minimum pipe size of 12-inch for inlet structures and 15-inch for all other
structures has been used for design.
E. Outlet Structures
There are no offsite discharge locations as part of this project. As previously mentioned, the
runoff from the southern portion of Resort Drive (Watershed 6) is captured in an existing
inlet which discharges off site. Since the impervious cover draining to this inlet is not
increasing, the inlet was left as is. The stormwater management plan on site is designed to
infiltrate the 25-year storm event. The ultimate destination of the stormwater runoff within
the apartment community is the groundwater table.
III. Stormwater Design
A. Pavers:
Pervious pavers were proposed within the parking lot areas of the apartment complex.
Specifically, the pavers are located within the first couple of feet at the beginning of
the parking stalls. The area surrounding the pavers are graded towards the pavers to
allow runoff to sheet flow and infiltrate into the paver section. The pavers have a flat
cross slope but have a slight longitudinal grade. Since the infiltration rate is so high,
pavers did not have to cover the entire parking area, only small sections were needed.
The parking stalls were chosen as a desirable area for pavers because they would be
susceptible to lower traffic speeds. It also seemed more practical to divert flow to
parking areas rather than drive aisle. Additionally, the pervious pavers needed to
remain 30 feet away and have at least 18-inches of vertical separation for perpendicular
crossings from all water mains in order to meet DEQ regulations. This, in many cases,
limited the potential paver areas to the parking stalls. In areas where the pavers are
relatively close to buildings, the paver section will have an impermeable fabric layer on
the sides of the paver section that are within 20 feet of a building. The intent of the
impermeable fabric layer is to protect the building foundations from saturated soils.
In the event of a storm larger than the 50-year event, the site has been graded to allow
for any excess flow to overtop into the adjacent public roadways to reduce the
potential for flooding at the buildings.
V:17007_02_Storm_Drainage_Plan_030716_SC 7 (03/07/18) SN/jil
B. Chambers:
Four out of the six chamber systems are designed to retain the 25-year runoff volume
from the new and existing public roads (Chamber A, C, D, F). One chamber system,
Chamber E, is used to retain runoff from the deficient volume from the Ferguson
Farms subdivision south of Fallon Street. The other chamber system, Chamber B, is
used to retain runoff from the pool area.
Chamber system A is designed to retain the runoff from Fallon Drive, the portion of
Stafford Avenue south of Palisades Drive and a portion Palisades Drive west of the
crosswalk. The chamber system is located within the pervious area adjacent to Building
17. The system is accessible for maintenance by Palisade Drive or the parking lot south
of Building 17. The chamber system will not be deeper than 5-feet below the existing
ground surface and does not account for volume below 5-feet.
Chamber system B is located within the pervious area southwest of the pool area.
Chamber system B is design to retain runoff from the pool patio, sidewalk and
landscaped area. Chamber system B is accessible for maintenance from the parking
area to the west. The chamber system is located here in order to comply with landscape
requirements and water easement regulations. The chamber system will not be deeper
than 5-feet below the existing ground surface and does not account for volume below
5-feet.
Chamber system C is located within Palisade Drive. This chamber system will retain
runoff from the portion of Palisades Drive east of the crosswalk. The chamber system
location was chosen to avoid the required landscape area in the boulevard and park
area. The Chamber system also need to be located in an area that is easily accessible
for maintenance purposes. The chamber system will not be deeper than 5-feet below
the existing ground surface and does not account for volume below 5-feet.
Chamber system D is located at the northeast corner of the site and is used to retain
runoff from a portion of Resort Drive. The chamber system is accessible for
maintenance from Resort Drive and the parking lot east of Building 13. The chamber
system will not be deeper than 5-feet below the existing ground surface and does not
account for volume below 5-feet.
Chamber system E is located at the southwest corner of the site and is used to retain
the deficient volume from the Ferguson Farms subdivision to the south. The system
will consist of a single row of chambers. The chamber system will not be deeper than
5-feet below the existing ground surface and does not account for volume below 5-
feet. The chamber system is accessible for maintenance from Stafford Avenue.
Chamber system F is located at the northwest corner of the site and retains the volume
from a portion of Stafford Avenue north of its intersection with Palisade Drive. The
chamber system is accessible for maintenance from Stafford Avenue. The chamber
system will not be deeper than 5-feet below the existing ground surface and does not
account for volume below 5-feet.
V:17007_02_Storm_Drainage_Plan_030716_SC 8 (03/07/18) SN/jil
In the event of a storm larger than the 50-year event, the site has been graded to allow
for any excess flow to overtop into the adjacent public roadways to reduce the
potential for flooding at the buildings.
C. Dry Wells:
The drywells on site are designed to retain runoff from sidewalk and landscape area.
The flows to the drywells are relatively small compared to the other flows on site do
to the large amount of pervious area in their watersheds. Flow to the dry well will sheet
flow over grassed area, which will slow down peak flows and provide some
pretreatment as filtration.
In the event of a storm larger than the 50-year event, the site has been graded to allow
for any excess flow to overtop into the adjacent public roadways to reduce the
potential for flooding at the buildings.
V:17007_02_Storm_Drainage_Plan_030716_SC 9 (03/07/18) SN/jil
Appendix A
WATERSHED MAP
V:17007_02_Storm_Drainage_Plan_030716_SC 10 (03/07/18) SN/jil
Appendix B
HYDROLOGY CALCULATIONS
Table 1: Watershed Properties
Watershed SW Unit # Total Area (SF)Impervious Area
(SF)
Pervious Area
(SF)
25-year Runoff Volume
After Infiltration (CF)Provided Storage (CF)
1 Unit 1 27535 20625 6910 1577.01 1814.00
2 Unit 1 25809 20969 4840
3 Unit 2 13165 7564 5601 373.66 571.10
4 Unit 3 10721 5471 5250 57.01 320.40
5 Unit 4 14287 7631 6656 394.40 635.10
6 Offsite 34525 27699 6826 5853.82 N/A
7 Unit 5 30217 23129 7088 392.81 403.17
8 Unit 6 10781 10715 66 103.48 427.20
9 Unit 7 28062 24752 3310 409.36 409.40
10 Unit 8 14374 12570 1804 207.83 209.15
11 Unit 9 7196 6910 286 154.50 213.60
12 Unit 10 51919 29513 22406 557.60 606.00
13 Drain 5188 5188 0 1039.49 #N/A
14 Unit 11 12804 7336 5468 357.22 402.12
15 Unit 12 10173 10016 157 154.50 172.55
16 Unit 13 25059 19677 5382 329.20 344.96
17 Unit 14 17267 16355 912 188.66 427.20
18 Unit 1 34625 26288 8337
19 Unit 16 4825 4820 5 39.35 249.20
20 Unit 17 20512 19013 1499 223.86 471.70
21 Unit 18 27598 27598 0 230.02 1388.40
22 Unit 19 63397 49197 14200 571.26 1553.05
23 Unit 20 19238 13403 5835 342.26 440.00
24 Unit 1 27576 19950 7626
25 Unit 15 6820 2746 4074 1206.36 1350.00
26 Unit 15 12464 9650 2814
27 Unit 20 8647 6039 2608
28 Unit 22 63920 21205 42715
29 Unit 21 23767 13603 10164 242.69 318.00
30 Unit 22 59707 53228 6479 1207.55 1633.15
31 Unit 26 9694 9307 387 83.95 319.19
32 Unit 15 29542 19415 10127
33 Unit 24 25936 14315 11621 185.30 493.95
34 Unit 26 12044 9803 2241 323.72 319.19
35 Unit 28 15733 15733 0 157.72 578.50
36 Unit 29 66946 63080 3866 904.15 1223.75
37 Unit 27 8196 6891 1305 76.62 226.95
38 Unit 30 3972 3567 405 30.12 186.90
39 Unit 15 17229 7088 10141
40 Unit 23 - Future 27382 13184 14198 991.35 Future
41 Unit 25 - Future 31854 31854 0
153.67 481.00
Included in WS 30 Calculations
Included in WS 25 Calculations
Included in WS 25 Calculations
Included in WS 41 Calculations
Ferguson Farms Deficent Volume
Included in WS 1 Calculations
Included in WS 1 Calculations
Included in WS 1 Calculations
Included in WS 25 Calculations
Included in WS 23 Calculations
Table 2: Stormwater Unit Properties
Watershed SW Unit # Type Width (FT) Length (FT) Depth (FT)*Storage
(CF)
1 & 2 & 18 & 24 Unit 1 Chamber A 1814.00
3 Unit 2 Dry Well 28.27 4 571.10
4 Unit 3 PaveDrain 6 60 320.40
5 Unit 4 Dry Well 28.27 4 635.10
6 Offiste
7 Unit 5 PaveDrain 6 75.5 403.17
8 Unit 6 PaveDrain 5 96 427.20
9 Unit 7 PaveDrain 5 92 409.40
10 Unit 8 PaveDrain 10 23.5 209.15
11 Unit 9 PaveDrain 10 24 213.60
12 Unit 10 Chamber B 606.00
13 Drain to Sewer
14 Unit 11 Dry Well 100.53 4 402.12
15 Unit 12 PaveDrain 4 48.47 172.55
16 Unit 13 PaveDrain 8 48.45 344.96
17 Unit 14 PaveDrain 5 96 427.20
19 Unit 16 PaveDrain 5 56 249.20
20 Unit 17 PaveDrain 5 106 471.70
21 Unit 18 PaveDrain 5 312 1388.40
22 Unit 19 PaveDrain 5 349 1553.05
23 & 27 Unit 20 Chamber C 440.00
25 & 26 & 32 & 39 Unit 15 Chamber F 1350.00
29 Unit 21 Chamber D 318.00
30&28 Unit 22 PaveDrain 5 367 1633.15
31 Unit 23 PaveDrain 5 96 427.20
33 Unit 24 PaveDrain 5 111 493.95
34 Unit 26 Dry Well 56.55 4 319.19
35 Unit 28 PaveDrain 5 130 578.50
36 Unit 29 PaveDrain 5 275 1223.75
37 Unit 27 PaveDrain 5 51 226.95
38 Unit 30 PaveDrain 5 42 186.90
40&41 Future Chambers
Ferguson Farms Chamber E Chamber E 481.00
See Appendix C
See Appendix C
See Appendix C
See Appendix C
See Appendix C
See Appendix C
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =2.92 cfs 21 75 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
87832 2.016 0.9 1.1 0.99 0.99 1.996181818
27713 0.636 0.2 1.1 0.22 0.22 0.139964646
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
115545 2.6525 2.1361
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =2.14
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 22.90
5 3.83 8.17
10 2.46 5.24
15 1.89 4.05
20 1.58 3.37
25 1.37 2.92
30 1.22 2.60
35 1.10 2.35
40 1.01 2.16
45 0.94 2.00
50 0.88 1.87
55 0.82 1.76
60 0.78 1.67
75 0.68 1.44
90 0.60 1.29
105 0.55 1.16
120 0.50 1.07
150 0.43 0.93
180 0.39 0.82
360 0.25 0.53
720 0.16 0.34
1440 0.10
1,577.01 ft3 22.90 (ft3/s)
14673.49 126000.00 -----
18832.34 252000.00 -----
8908.24 31500.00 -----
11433.06 63000.00 -----
7698.37 21000.00 -----
8342.31 26250.00 -----
6940.98 15750.00 -----
7337.06 18375.00 -----
5998.30 10500.00 -----
6500.04 13125.00 -----
5617.24 8750.00 -----
5813.32 9625.00 -----
5183.65 7000.00 -----
5408.17 7875.00 -----
4673.66 5250.00 -----
4940.36 6125.00 -----
4038.91 3500.00 538.91
4376.75 4375.00 1.75
3146.98 1750.00 1396.98
3641.55 2625.00 1016.55
1373.71 175.00 1198.71
2452.01 875.00 1577.01
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.7321 Cwd x Cf =0.81
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 1, 2, 18, 24
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Area (sq.ft.)Infiltration Rate (in/hr)
Discharge Rate, d =0.05 cfs 28.27 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
7564 0.174 0.9 1.1 0.99 0.99 0.171909091
5601 0.129 0.2 1.1 0.22 0.22 0.028287879
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
13165 0.3022 0.2002
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.20
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 2.15
5 3.83 0.77
10 2.46 0.49
15 1.89 0.38
20 1.58 0.32
25 1.37 0.27
30 1.22 0.24
35 1.10 0.22
40 1.01 0.20
45 0.94 0.19
50 0.88 0.18
55 0.82 0.17
60 0.78 0.16
75 0.68 0.14
90 0.60 0.12
105 0.55 0.11
120 0.50 0.10
150 0.43 0.09
180 0.39 0.08
360 0.25 0.05
720 0.16 0.03
1440 0.10
373.66 ft3 2.15 (ft3/s)
1375.18 2261.95 -----
1764.94 4523.89 -----
834.87 565.49 269.38
1071.49 1130.97 -----
721.48 376.99 344.49
781.83 471.24 310.59
650.50 282.74 367.76
687.62 329.87 357.75
562.15 188.50 373.66
609.18 235.62 373.56
526.44 157.08 369.36
544.82 172.79 372.03
485.80 125.66 360.14
506.85 141.37 365.48
438.01 94.25 343.76
463.00 109.96 353.05
378.52 62.83 315.69
410.18 78.54 331.64
294.93 31.42 263.51
341.28 47.12 294.16
128.74 3.14 125.60
229.80 15.71 214.09
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.6022 Cwd x Cf =0.66
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 3
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.67 cfs 6 60 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
5471 0.126 0.9 1.1 0.99 0.99 0.124340909
5250 0.121 0.2 1.1 0.22 0.22 0.026515152
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
10721 0.2461 0.1509
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.15
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 1.62
5 3.83 0.58
10 2.46 0.37
15 1.89 0.29
20 1.58 0.24
25 1.37 0.21
30 1.22 0.18
35 1.10 0.17
40 1.01 0.15
45 0.94 0.14
50 0.88 0.13
55 0.82 0.12
60 0.78 0.12
75 0.68 0.10
90 0.60 0.09
105 0.55 0.08
120 0.50 0.08
150 0.43 0.07
180 0.39 0.06
360 0.25 0.04
720 0.16 0.02
1440 0.10
57.01 ft3 1.62 (ft3/s)
1036.25 28800.00 -----
1329.95 57600.00 -----
629.11 7200.00 -----
807.41 14400.00 -----
543.66 4800.00 -----
589.14 6000.00 -----
490.18 3600.00 -----
518.15 4200.00 -----
423.60 2400.00 -----
459.04 3000.00 -----
396.69 2000.00 -----
410.54 2200.00 -----
366.07 1600.00 -----
381.93 1800.00 -----
330.06 1200.00 -----
348.89 1400.00 -----
285.23 800.00 -----
309.09 1000.00 -----
222.24 400.00 -----
257.17 600.00 -----
97.01 40.00 57.01
173.16 200.00 -----
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.5572 Cwd x Cf =0.61
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 4
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Area (sq.ft.)Infiltration Rate (in/hr)
Discharge Rate, d =0.05 cfs 28.27 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
7631 0.175 0.9 1.1 0.99 0.99 0.173431818
6656 0.153 0.2 1.1 0.22 0.22 0.033616162
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
14287 0.3280 0.2070
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.21
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 2.22
5 3.83 0.79
10 2.46 0.51
15 1.89 0.39
20 1.58 0.33
25 1.37 0.28
30 1.22 0.25
35 1.10 0.23
40 1.01 0.21
45 0.94 0.19
50 0.88 0.18
55 0.82 0.17
60 0.78 0.16
75 0.68 0.14
90 0.60 0.12
105 0.55 0.11
120 0.50 0.10
150 0.43 0.09
180 0.39 0.08
360 0.25 0.05
720 0.16 0.03
1440 0.10
394.40 ft3 2.22 (ft3/s)
1422.24 2261.95 -----
1825.34 4523.89 -----
863.44 565.49 297.95
1108.16 1130.97 -----
746.17 376.99 369.18
808.59 471.24 337.35
672.76 282.74 390.02
711.15 329.87 381.28
581.39 188.50 392.90
630.02 235.62 394.40
544.46 157.08 387.38
563.46 172.79 390.67
502.43 125.66 376.77
524.19 141.37 382.82
453.00 94.25 358.75
478.85 109.96 368.89
391.48 62.83 328.64
424.22 78.54 345.68
305.02 31.42 273.61
352.96 47.12 305.84
133.15 3.14 130.01
237.66 15.71 221.96
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.5739 Cwd x Cf =0.63
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 5
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Discharge Rate, d =0.00 cfs
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
27699 0.636 0.9 1.1 0.99 0.99 0.629522727
6826 0.157 0.2 1.1 0.22 0.22 0.034474747
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
34525 0.7926 0.6640
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.66
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 7.12
5 3.83 2.54
10 2.46 1.63
15 1.89 1.26
20 1.58 1.05
25 1.37 0.91
30 1.22 0.81
35 1.10 0.73
40 1.01 0.67
45 0.94 0.62
50 0.88 0.58
55 0.82 0.55
60 0.78 0.52
75 0.68 0.45
90 0.60 0.40
105 0.55 0.36
120 0.50 0.33
150 0.43 0.29
180 0.39 0.26
360 0.25 0.16
720 0.16 0.11
1440 0.10
5,853.82 ft3 7.12 (ft3/s)
4561.09 0.00 4561.09
5853.82 0.00 5853.82
2769.03 0.00 2769.03
3553.84 0.00 3553.84
2392.95 0.00 2392.95
2593.12 0.00 2593.12
2157.53 0.00 2157.53
2280.64 0.00 2280.64
1864.50 0.00 1864.50
2020.46 0.00 2020.46
1746.06 0.00 1746.06
1807.01 0.00 1807.01
1611.28 0.00 1611.28
1681.07 0.00 1681.07
1452.76 0.00 1452.76
1535.65 0.00 1535.65
1255.45 0.00 1255.45
1360.47 0.00 1360.47
978.20 0.00 978.20
1131.94 0.00 1131.94
427.00 0.00 427.00
762.18 0.00 762.18
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.7616 Cwd x Cf =0.84
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 6
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.84 cfs 6 75.5 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
23129 0.531 0.9 1.1 0.99 0.99 0.525659091
7088 0.163 0.2 1.1 0.22 0.22 0.03579798
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
30217 0.6937 0.5615
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.56
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 6.02
5 3.83 2.15
10 2.46 1.38
15 1.89 1.06
20 1.58 0.88
25 1.37 0.77
30 1.22 0.68
35 1.10 0.62
40 1.01 0.57
45 0.94 0.53
50 0.88 0.49
55 0.82 0.46
60 0.78 0.44
75 0.68 0.38
90 0.60 0.34
105 0.55 0.31
120 0.50 0.28
150 0.43 0.24
180 0.39 0.22
360 0.25 0.14
720 0.16 0.09
1440 0.10
392.81 ft3 6.02 (ft3/s)
3856.73 36240.00 -----
4949.82 72480.00 -----
2341.41 9060.00 -----
3005.03 18120.00 -----
2023.41 6040.00 -----
2192.66 7550.00 -----
1824.34 4530.00 -----
1928.45 5285.00 -----
1576.57 3020.00 -----
1708.45 3775.00 -----
1476.41 2516.67 -----
1527.95 2768.33 -----
1362.45 2013.33 -----
1421.46 2265.00 -----
1228.41 1510.00 -----
1298.51 1761.67 -----
1061.57 1006.67 54.91
1150.37 1258.33 -----
827.14 503.33 323.81
957.13 755.00 202.13
361.06 50.33 310.73
644.48 251.67 392.81
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.7358 Cwd x Cf =0.81
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 7
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.89 cfs 5 96 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
10715 0.246 0.9 1.1 0.99 0.99 0.243522727
66 0.002 0.2 1.1 0.22 0.22 0.000333333
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
10781 0.2475 0.2439
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.24
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 2.61
5 3.83 0.93
10 2.46 0.60
15 1.89 0.46
20 1.58 0.38
25 1.37 0.33
30 1.22 0.30
35 1.10 0.27
40 1.01 0.25
45 0.94 0.23
50 0.88 0.21
55 0.82 0.20
60 0.78 0.19
75 0.68 0.16
90 0.60 0.15
105 0.55 0.13
120 0.50 0.12
150 0.43 0.11
180 0.39 0.09
360 0.25 0.06
720 0.16 0.04
1440 0.10
103.48 ft3 2.61 (ft3/s)
1675.08 38400.00 -----
2149.84 76800.00 -----
1016.94 9600.00 -----
1305.16 19200.00 -----
878.82 6400.00 -----
952.33 8000.00 -----
792.36 4800.00 -----
837.58 5600.00 -----
684.75 3200.00 -----
742.02 4000.00 -----
641.25 2666.67 -----
663.63 2933.33 -----
591.75 2133.33 -----
617.38 2400.00 -----
533.53 1600.00 -----
563.98 1866.67 -----
461.07 1066.67 -----
499.64 1333.33 -----
359.25 533.33 -----
415.71 800.00 -----
156.82 53.33 103.48
279.91 266.67 13.25
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.8957 Cwd x Cf =0.99
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 8
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.85 cfs 5 92 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
24757 0.568 0.9 1.1 0.99 0.99 0.562659091
3305 0.076 0.2 1.1 0.22 0.22 0.016691919
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
28062 0.6442 0.5794
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.58
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 6.21
5 3.83 2.22
10 2.46 1.42
15 1.89 1.10
20 1.58 0.91
25 1.37 0.79
30 1.22 0.70
35 1.10 0.64
40 1.01 0.59
45 0.94 0.54
50 0.88 0.51
55 0.82 0.48
60 0.78 0.45
75 0.68 0.39
90 0.60 0.35
105 0.55 0.32
120 0.50 0.29
150 0.43 0.25
180 0.39 0.22
360 0.25 0.14
720 0.16 0.09
1440 0.10
409.46 ft3 6.21 (ft3/s)
3979.64 36800.00 -----
5107.58 73600.00 -----
2416.03 9200.00 -----
3100.80 18400.00 -----
2087.90 6133.33 -----
2262.55 7666.67 -----
1882.49 4600.00 -----
1989.91 5366.67 -----
1626.82 3066.67 -----
1762.90 3833.33 -----
1523.47 2555.56 -----
1576.65 2811.11 -----
1405.87 2044.44 -----
1466.77 2300.00 -----
1267.56 1533.33 -----
1339.89 1788.89 -----
1095.41 1022.22 73.18
1187.03 1277.78 -----
853.50 511.11 342.39
987.64 766.67 220.97
372.57 51.11 321.46
665.02 255.56 409.46
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.8176 Cwd x Cf =0.90
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 9
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.44 cfs 10 23.5 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
12570 0.289 0.9 1.1 0.99 0.99 0.285681818
1804 0.041 0.2 1.1 0.22 0.22 0.009111111
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
14374 0.3300 0.2948
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.29
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 3.16
5 3.83 1.13
10 2.46 0.72
15 1.89 0.56
20 1.58 0.46
25 1.37 0.40
30 1.22 0.36
35 1.10 0.32
40 1.01 0.30
45 0.94 0.28
50 0.88 0.26
55 0.82 0.24
60 0.78 0.23
75 0.68 0.20
90 0.60 0.18
105 0.55 0.16
120 0.50 0.15
150 0.43 0.13
180 0.39 0.11
360 0.25 0.07
720 0.16 0.05
1440 0.10
207.83 ft3 3.16 (ft3/s)
2024.97 18800.00 -----
2598.90 37600.00 -----
1229.36 4700.00 -----
1577.79 9400.00 -----
1062.39 3133.33 -----
1151.26 3916.67 -----
957.87 2350.00 -----
1012.53 2741.67 -----
827.78 1566.67 -----
897.02 1958.33 -----
775.19 1305.56 -----
802.25 1436.11 -----
715.35 1044.44 -----
746.34 1175.00 -----
644.98 783.33 -----
681.78 913.89 -----
557.38 522.22 35.16
604.00 652.78 -----
434.29 261.11 173.18
502.54 391.67 110.88
189.57 26.11 163.46
338.38 130.56 207.83
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.8121 Cwd x Cf =0.89
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 10
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.44 cfs 10 24 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
6910 0.159 0.9 1.1 0.99 0.99 0.157045455
286 0.007 0.2 1.1 0.22 0.22 0.001444444
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
7196 0.1652 0.1585
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.16
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 1.70
5 3.83 0.61
10 2.46 0.39
15 1.89 0.30
20 1.58 0.25
25 1.37 0.22
30 1.22 0.19
35 1.10 0.17
40 1.01 0.16
45 0.94 0.15
50 0.88 0.14
55 0.82 0.13
60 0.78 0.12
75 0.68 0.11
90 0.60 0.10
105 0.55 0.09
120 0.50 0.08
150 0.43 0.07
180 0.39 0.06
360 0.25 0.04
720 0.16 0.03
1440 0.10
75.25 ft3 1.70 (ft3/s)
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 11
Surface Type
Landscape
Totals
= 0.8722 Cwd x Cf =0.96
Runoff Volume Discharge Volume Site Detention
=
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
101.92 26.67 75.25
181.93 133.33 48.59
233.49 266.67 -----
270.18 400.00 -----
299.66 533.33 -----
324.73 666.67 -----
346.76 800.00 -----
366.55 933.33 -----
384.60 1066.67 -----
401.26 1200.00 -----
416.77 1333.33 -----
431.32 1466.67 -----
445.04 1600.00 -----
482.27 2000.00 -----
514.98 2400.00 -----
544.37 2800.00 -----
571.18 3200.00 -----
618.95 4000.00 -----
660.94 4800.00 -----
848.27 9600.00 -----
1088.69 19200.00 -----
1397.25 38400.00 -----
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =1.14 cfs 11 56 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
29513 0.678 0.9 1.1 0.99 0.99 0.67075
22406 0.514 0.2 1.1 0.22 0.22 0.113161616
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
51919 1.1919 0.7839
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.78
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 8.40
5 3.83 3.00
10 2.46 1.92
15 1.89 1.48
20 1.58 1.24
25 1.37 1.07
30 1.22 0.95
35 1.10 0.86
40 1.01 0.79
45 0.94 0.74
50 0.88 0.69
55 0.82 0.65
60 0.78 0.61
75 0.68 0.53
90 0.60 0.47
105 0.55 0.43
120 0.50 0.39
150 0.43 0.34
180 0.39 0.30
360 0.25 0.19
720 0.16 0.12
1440 0.10
557.60 ft3 8.40 (ft3/s)
5384.80 49280.00 -----
6910.99 98560.00 -----
3269.10 12320.00 -----
4195.64 24640.00 -----
2825.11 8213.33 -----
3061.42 10266.67 -----
2547.16 6160.00 -----
2692.51 7186.67 -----
2201.22 4106.67 -----
2385.35 5133.33 -----
2061.38 3422.22 -----
2133.34 3764.44 -----
1902.27 2737.78 -----
1984.66 3080.00 -----
1715.12 2053.33 -----
1812.99 2395.56 -----
1482.18 1368.89 113.29
1606.16 1711.11 -----
1154.86 684.44 470.42
1336.36 1026.67 309.69
504.12 68.44 435.67
899.83 342.22 557.60
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.5979 Cwd x Cf =0.66
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 12
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.00 cfs
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
5188 0.119 0.9 1.1 0.99 0.99 0.117909091
0 0.000 0.2 1.1 0.22 0.22 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
5188 0.1191 0.1179
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.12
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 1.26
5 3.83 0.45
10 2.46 0.29
15 1.89 0.22
20 1.58 0.19
25 1.37 0.16
30 1.22 0.14
35 1.10 0.13
40 1.01 0.12
45 0.94 0.11
50 0.88 0.10
55 0.82 0.10
60 0.78 0.09
75 0.68 0.08
90 0.60 0.07
105 0.55 0.06
120 0.50 0.06
150 0.43 0.05
180 0.39 0.05
360 0.25 0.03
720 0.16 0.02
1440 0.10
1,039.49 ft3 1.26 (ft3/s)
809.93 0.00 809.93
1039.49 0.00 1039.49
491.71 0.00 491.71
631.07 0.00 631.07
424.93 0.00 424.93
460.47 0.00 460.47
383.12 0.00 383.12
404.98 0.00 404.98
331.09 0.00 331.09
358.78 0.00 358.78
310.06 0.00 310.06
320.88 0.00 320.88
286.12 0.00 286.12
298.52 0.00 298.52
257.97 0.00 257.97
272.69 0.00 272.69
222.94 0.00 222.94
241.58 0.00 241.58
173.70 0.00 173.70
201.00 0.00 201.00
75.82 0.00 75.82
135.34 0.00 135.34
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.9000 Cwd x Cf =0.99
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 13
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Area (sq.ft.)Infiltration Rate (in/hr)
Discharge Rate, d =0.05 cfs 28.27433388 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
7336 0.168 0.9 1.1 0.99 0.99 0.166727273
5468 0.126 0.2 1.1 0.22 0.22 0.027616162
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
12804 0.2939 0.1943
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.19
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 2.08
5 3.83 0.74
10 2.46 0.48
15 1.89 0.37
20 1.58 0.31
25 1.37 0.27
30 1.22 0.24
35 1.10 0.21
40 1.01 0.20
45 0.94 0.18
50 0.88 0.17
55 0.82 0.16
60 0.78 0.15
75 0.68 0.13
90 0.60 0.12
105 0.55 0.11
120 0.50 0.10
150 0.43 0.08
180 0.39 0.08
360 0.25 0.05
720 0.16 0.03
1440 0.10
357.22 ft3 2.08 (ft3/s)
1334.97 2261.95 -----
1713.34 4523.89 -----
810.46 565.49 244.97
1040.16 1130.97 -----
700.39 376.99 323.40
758.97 471.24 287.73
631.48 282.74 348.74
667.51 329.87 337.65
545.72 188.50 357.22
591.36 235.62 355.74
511.05 157.08 353.97
528.89 172.79 356.10
471.60 125.66 345.94
492.03 141.37 350.66
425.20 94.25 330.96
449.47 109.96 339.51
367.45 62.83 304.62
398.19 78.54 319.65
286.31 31.42 254.89
331.30 47.12 284.18
124.98 3.14 121.84
223.08 15.71 207.37
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.6011 Cwd x Cf =0.66
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 14
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.36 cfs 4 48.47 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
10016 0.230 0.9 1.1 0.99 0.99 0.227636364
157 0.004 0.2 1.1 0.22 0.22 0.000792929
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
10173 0.2335 0.2284
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.23
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 2.45
5 3.83 0.87
10 2.46 0.56
15 1.89 0.43
20 1.58 0.36
25 1.37 0.31
30 1.22 0.28
35 1.10 0.25
40 1.01 0.23
45 0.94 0.21
50 0.88 0.20
55 0.82 0.19
60 0.78 0.18
75 0.68 0.15
90 0.60 0.14
105 0.55 0.12
120 0.50 0.11
150 0.43 0.10
180 0.39 0.09
360 0.25 0.06
720 0.16 0.04
1440 0.10
154.50 ft3 2.45 (ft3/s)
1569.11 15510.40 -----
2013.84 31020.80 -----
952.60 3877.60 -----
1222.60 7755.20 -----
823.23 2585.07 -----
892.09 3231.33 -----
742.24 1938.80 -----
784.59 2261.93 -----
641.43 1292.53 -----
695.08 1615.67 -----
600.68 1077.11 -----
621.65 1184.82 -----
554.31 861.69 -----
578.32 969.40 -----
499.78 646.27 -----
528.30 753.98 -----
431.90 430.84 1.06
468.03 538.56 -----
336.52 215.42 121.10
389.41 323.13 66.28
146.90 21.54 125.36
262.21 107.71 154.50
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.8892 Cwd x Cf =0.98
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 15
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.72 cfs 8 48.45 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
19677 0.452 0.9 1.1 0.99 0.99 0.447204545
5382 0.124 0.2 1.1 0.22 0.22 0.027181818
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
25059 0.5753 0.4744
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.47
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 5.08
5 3.83 1.82
10 2.46 1.16
15 1.89 0.90
20 1.58 0.75
25 1.37 0.65
30 1.22 0.58
35 1.10 0.52
40 1.01 0.48
45 0.94 0.44
50 0.88 0.42
55 0.82 0.39
60 0.78 0.37
75 0.68 0.32
90 0.60 0.29
105 0.55 0.26
120 0.50 0.24
150 0.43 0.21
180 0.39 0.18
360 0.25 0.12
720 0.16 0.08
1440 0.10
329.20 ft3 5.08 (ft3/s)
3258.63 31008.00 -----
4182.21 62016.00 -----
1978.30 7752.00 -----
2539.01 15504.00 -----
1709.62 5168.00 -----
1852.63 6460.00 -----
1541.42 3876.00 -----
1629.38 4522.00 -----
1332.08 2584.00 -----
1443.50 3230.00 -----
1247.45 2153.33 -----
1291.00 2368.67 -----
1151.16 1722.67 -----
1201.02 1938.00 -----
1037.91 1292.00 -----
1097.13 1507.33 -----
896.94 861.33 35.61
971.97 1076.67 -----
698.87 430.67 268.20
808.70 646.00 162.70
305.07 43.07 262.00
544.53 215.33 329.20
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.7497 Cwd x Cf =0.82
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 16
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.89 cfs 5 96 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
16355 0.375 0.9 1.1 0.99 0.99 0.371704545
912 0.021 0.2 1.1 0.22 0.22 0.004606061
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
17267 0.3964 0.3763
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.38
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 4.03
5 3.83 1.44
10 2.46 0.92
15 1.89 0.71
20 1.58 0.59
25 1.37 0.51
30 1.22 0.46
35 1.10 0.41
40 1.01 0.38
45 0.94 0.35
50 0.88 0.33
55 0.82 0.31
60 0.78 0.29
75 0.68 0.25
90 0.60 0.23
105 0.55 0.21
120 0.50 0.19
150 0.43 0.16
180 0.39 0.15
360 0.25 0.09
720 0.16 0.06
1440 0.10
188.66 ft3 4.03 (ft3/s)
2584.93 38400.00 -----
3317.57 76800.00 -----
1569.30 9600.00 -----
2014.09 19200.00 -----
1356.17 6400.00 -----
1469.61 8000.00 -----
1222.75 4800.00 -----
1292.52 5600.00 -----
1056.68 3200.00 -----
1145.07 4000.00 -----
989.55 2666.67 -----
1024.09 2933.33 -----
913.17 2133.33 -----
952.72 2400.00 -----
823.33 1600.00 -----
870.31 1866.67 -----
711.51 1066.67 -----
771.02 1333.33 -----
554.38 533.33 21.05
641.51 800.00 -----
242.00 53.33 188.66
431.95 266.67 165.29
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.8630 Cwd x Cf =0.95
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 17
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.52 cfs 5 56 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
4820 0.111 0.9 1.1 0.99 0.99 0.109545455
5 0.000 0.2 1.1 0.22 0.22 2.52525E-05
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
4825 0.1108 0.1096
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.11
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 1.17
5 3.83 0.42
10 2.46 0.27
15 1.89 0.21
20 1.58 0.17
25 1.37 0.15
30 1.22 0.13
35 1.10 0.12
40 1.01 0.11
45 0.94 0.10
50 0.88 0.10
55 0.82 0.09
60 0.78 0.09
75 0.68 0.07
90 0.60 0.07
105 0.55 0.06
120 0.50 0.05
150 0.43 0.05
180 0.39 0.04
360 0.25 0.03
720 0.16 0.02
1440 0.10
39.35 ft3 1.17 (ft3/s)
752.66 22400.00 -----
965.98 44800.00 -----
456.94 5600.00 -----
586.44 11200.00 -----
394.88 3733.33 -----
427.91 4666.67 -----
356.03 2800.00 -----
376.34 3266.67 -----
307.67 1866.67 -----
333.41 2333.33 -----
288.13 1555.56 -----
298.19 1711.11 -----
265.89 1244.44 -----
277.40 1400.00 -----
239.73 933.33 -----
253.41 1088.89 -----
207.17 622.22 -----
224.50 777.78 -----
161.42 311.11 -----
186.79 466.67 -----
70.46 31.11 39.35
125.77 155.56 -----
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.8993 Cwd x Cf =0.99
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 19
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.98 cfs 5 106 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
19013 0.436 0.9 1.1 0.99 0.99 0.432113636
1499 0.034 0.2 1.1 0.22 0.22 0.007570707
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
20512 0.4709 0.4397
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.44
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 4.71
5 3.83 1.68
10 2.46 1.08
15 1.89 0.83
20 1.58 0.69
25 1.37 0.60
30 1.22 0.53
35 1.10 0.48
40 1.01 0.44
45 0.94 0.41
50 0.88 0.39
55 0.82 0.36
60 0.78 0.34
75 0.68 0.30
90 0.60 0.26
105 0.55 0.24
120 0.50 0.22
150 0.43 0.19
180 0.39 0.17
360 0.25 0.11
720 0.16 0.07
1440 0.10
223.86 ft3 4.71 (ft3/s)
3020.25 42400.00 -----
3876.27 84800.00 -----
1833.59 10600.00 -----
2353.27 21200.00 -----
1584.56 7066.67 -----
1717.10 8833.33 -----
1428.67 5300.00 -----
1510.19 6183.33 -----
1234.63 3533.33 -----
1337.91 4416.67 -----
1156.20 2944.44 -----
1196.56 3238.89 -----
1066.95 2355.56 -----
1113.17 2650.00 -----
961.98 1766.67 -----
1016.88 2061.11 -----
831.33 1177.78 -----
900.87 1472.22 -----
647.74 588.89 58.86
749.54 883.33 -----
282.75 58.89 223.86
504.70 294.44 210.26
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.8488 Cwd x Cf =0.93
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 20
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =2.89 cfs 5 312 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
27598 0.634 0.9 1.1 0.99 0.99 0.627227273
0 0.000 0.2 1.1 0.22 0.22 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
27598 0.6336 0.6272
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.63
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 6.72
5 3.83 2.40
10 2.46 1.54
15 1.89 1.19
20 1.58 0.99
25 1.37 0.86
30 1.22 0.76
35 1.10 0.69
40 1.01 0.63
45 0.94 0.59
50 0.88 0.55
55 0.82 0.52
60 0.78 0.49
75 0.68 0.42
90 0.60 0.38
105 0.55 0.34
120 0.50 0.31
150 0.43 0.27
180 0.39 0.24
360 0.25 0.16
720 0.16 0.10
1440 0.10
230.02 ft3 6.72 (ft3/s)
4308.51 124800.00 -----
5529.66 249600.00 -----
2615.69 31200.00 -----
3357.04 62400.00 -----
2260.44 20800.00 -----
2449.52 26000.00 -----
2038.05 15600.00 -----
2154.35 18200.00 -----
1761.25 10400.00 -----
1908.58 13000.00 -----
1649.37 8666.67 -----
1706.94 9533.33 -----
1522.05 6933.33 -----
1587.98 7800.00 -----
1372.31 5200.00 -----
1450.61 6066.67 -----
1185.93 3466.67 -----
1285.13 4333.33 -----
924.03 1733.33 -----
1069.25 2600.00 -----
403.36 173.33 230.02
719.97 866.67 -----
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.9000 Cwd x Cf =0.99
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 21
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =3.23 cfs 5 349 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
49197 1.129 0.9 1.1 0.99 0.99 1.118113636
14200 0.326 0.2 1.1 0.22 0.22 0.071717172
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
63397 1.4554 1.1898
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =1.19
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 12.75
5 3.83 4.55
10 2.46 2.92
15 1.89 2.25
20 1.58 1.87
25 1.37 1.63
30 1.22 1.45
35 1.10 1.31
40 1.01 1.20
45 0.94 1.12
50 0.88 1.04
55 0.82 0.98
60 0.78 0.93
75 0.68 0.80
90 0.60 0.72
105 0.55 0.65
120 0.50 0.60
150 0.43 0.52
180 0.39 0.46
360 0.25 0.29
720 0.16 0.19
1440 0.10
571.26 ft3 12.75 (ft3/s)
8173.11 139600.00 -----
10489.59 279200.00 -----
4961.88 34900.00 -----
6368.20 69800.00 -----
4287.98 23266.67 -----
4646.66 29083.33 -----
3866.12 17450.00 -----
4086.73 20358.33 -----
3341.04 11633.33 -----
3620.51 14541.67 -----
3128.79 9694.44 -----
3238.01 10663.89 -----
2887.28 7755.56 -----
3012.34 8725.00 -----
2603.22 5816.67 -----
2751.77 6786.11 -----
2249.67 3877.78 -----
2437.85 4847.22 -----
1752.86 1938.89 -----
2028.34 2908.33 -----
765.15 193.89 571.26
1365.77 969.44 396.32
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.7432 Cwd x Cf =0.82
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 22
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.71 cfs 5 77 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
19442 0.446 0.9 1.1 0.99 0.99 0.441863636
8443 0.194 0.2 1.1 0.22 0.22 0.042641414
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
27885 0.6402 0.4845
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.48
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 5.19
5 3.83 1.85
10 2.46 1.19
15 1.89 0.92
20 1.58 0.76
25 1.37 0.66
30 1.22 0.59
35 1.10 0.53
40 1.01 0.49
45 0.94 0.45
50 0.88 0.42
55 0.82 0.40
60 0.78 0.38
75 0.68 0.33
90 0.60 0.29
105 0.55 0.26
120 0.50 0.24
150 0.43 0.21
180 0.39 0.19
360 0.25 0.12
720 0.16 0.08
1440 0.10
342.26 ft3 5.19 (ft3/s)
3328.13 30800.00 -----
4271.41 61600.00 -----
2020.50 7700.00 -----
2593.16 15400.00 -----
1746.09 5133.33 -----
1892.14 6416.67 -----
1574.30 3850.00 -----
1664.14 4491.67 -----
1360.49 2566.67 -----
1474.29 3208.33 -----
1274.06 2138.89 -----
1318.53 2352.78 -----
1175.72 1711.11 -----
1226.64 1925.00 -----
1060.05 1283.33 -----
1120.54 1497.22 -----
916.08 855.56 60.52
992.70 1069.44 -----
713.77 427.78 286.00
825.95 641.67 184.28
311.57 42.78 268.80
556.15 213.89 342.26
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.6881 Cwd x Cf =0.76
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 23 & 27
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.57 cfs 11 28 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
13603 0.312 0.9 1.1 0.99 0.99 0.309159091
10164 0.233 0.2 1.1 0.22 0.22 0.051333333
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
23767 0.5456 0.3605
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.36
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 3.86
5 3.83 1.38
10 2.46 0.89
15 1.89 0.68
20 1.58 0.57
25 1.37 0.49
30 1.22 0.44
35 1.10 0.40
40 1.01 0.36
45 0.94 0.34
50 0.88 0.32
55 0.82 0.30
60 0.78 0.28
75 0.68 0.24
90 0.60 0.22
105 0.55 0.20
120 0.50 0.18
150 0.43 0.16
180 0.39 0.14
360 0.25 0.09
720 0.16 0.06
1440 0.10
242.69 ft3 3.86 (ft3/s)
2476.27 24640.00 -----
3178.11 49280.00 -----
1503.34 6160.00 -----
1929.42 12320.00 -----
1299.16 4106.67 -----
1407.83 5133.33 -----
1171.35 3080.00 -----
1238.19 3593.33 -----
1012.26 2053.33 -----
1096.93 2566.67 -----
947.96 1711.11 -----
981.05 1882.22 -----
874.78 1368.89 -----
912.67 1540.00 -----
788.72 1026.67 -----
833.73 1197.78 -----
681.60 684.44 -----
738.61 855.56 -----
531.08 342.22 188.86
614.54 513.33 101.21
231.82 34.22 197.60
413.80 171.11 242.69
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.6006 Cwd x Cf =0.66
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 29
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =3.40 cfs 5 367 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
74433 1.709 0.9 1.1 0.99 0.99 1.691659091
49194 1.129 0.2 1.1 0.22 0.22 0.248454545
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
123627 2.8381 1.9401
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =1.94
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 20.79
5 3.83 7.42
10 2.46 4.76
15 1.89 3.67
20 1.58 3.06
25 1.37 2.65
30 1.22 2.36
35 1.10 2.14
40 1.01 1.96
45 0.94 1.82
50 0.88 1.70
55 0.82 1.60
60 0.78 1.51
75 0.68 1.31
90 0.60 1.17
105 0.55 1.06
120 0.50 0.97
150 0.43 0.84
180 0.39 0.75
360 0.25 0.48
720 0.16 0.31
1440 0.10
1,207.55 ft3 20.79 (ft3/s)
13326.91 146800.00 -----
17104.10 293600.00 -----
8090.73 36700.00 -----
10383.86 73400.00 -----
6991.90 24466.67 -----
7576.75 30583.33 -----
6304.01 18350.00 -----
6663.74 21408.33 -----
5447.84 12233.33 -----
5903.53 15291.67 -----
5101.75 10194.44 -----
5279.84 11213.89 -----
4707.95 8155.56 -----
4911.86 9175.00 -----
4244.76 6116.67 -----
4486.98 7136.11 -----
3668.26 4077.78 -----
3975.10 5097.22 -----
2858.18 2038.89 819.29
3307.37 3058.33 249.04
1247.64 203.89 1043.75
2226.99 1019.44 1207.55
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.6215 Cwd x Cf =0.68
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 28 & 30
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.89 cfs 5 96 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
9307 0.214 0.9 1.1 0.99 0.99 0.211522727
387 0.009 0.2 1.1 0.22 0.22 0.001954545
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
9694 0.2225 0.2135
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.21
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 2.29
5 3.83 0.82
10 2.46 0.52
15 1.89 0.40
20 1.58 0.34
25 1.37 0.29
30 1.22 0.26
35 1.10 0.24
40 1.01 0.22
45 0.94 0.20
50 0.88 0.19
55 0.82 0.18
60 0.78 0.17
75 0.68 0.14
90 0.60 0.13
105 0.55 0.12
120 0.50 0.11
150 0.43 0.09
180 0.39 0.08
360 0.25 0.05
720 0.16 0.03
1440 0.10
83.95 ft3 2.29 (ft3/s)
1466.41 38400.00 -----
1882.02 76800.00 -----
890.25 9600.00 -----
1142.57 19200.00 -----
769.34 6400.00 -----
833.69 8000.00 -----
693.65 4800.00 -----
733.23 5600.00 -----
599.44 3200.00 -----
649.59 4000.00 -----
561.36 2666.67 -----
580.96 2933.33 -----
518.03 2133.33 -----
540.47 2400.00 -----
467.07 1600.00 -----
493.72 1866.67 -----
403.63 1066.67 -----
437.39 1333.33 -----
314.50 533.33 -----
363.92 800.00 -----
137.28 53.33 83.95
245.04 266.67 -----
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.8721 Cwd x Cf =0.96
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 31
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =2.33 cfs 18 70 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
65187 1.496 0.9 1.1 0.99 0.99 1.481522727
35493 0.815 0.2 1.1 0.22 0.22 0.179257576
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
100680 2.3113 1.6608
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =1.66
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 17.80
5 3.83 6.35
10 2.46 4.08
15 1.89 3.15
20 1.58 2.62
25 1.37 2.27
30 1.22 2.02
35 1.10 1.83
40 1.01 1.68
45 0.94 1.56
50 0.88 1.46
55 0.82 1.37
60 0.78 1.30
75 0.68 1.12
90 0.60 1.00
105 0.55 0.91
120 0.50 0.83
150 0.43 0.72
180 0.39 0.64
360 0.25 0.41
720 0.16 0.26
1440 0.10
1,206.36 ft3 17.80 (ft3/s)
11408.13 100800.00 -----
14641.49 201600.00 -----
6925.85 25200.00 -----
8888.81 50400.00 -----
5985.22 16800.00 -----
6485.86 21000.00 -----
5396.38 12600.00 -----
5704.31 14700.00 -----
4663.47 8400.00 -----
5053.55 10500.00 -----
4367.21 7000.00 -----
4519.66 7700.00 -----
4030.11 5600.00 -----
4204.66 6300.00 -----
3633.61 4200.00 -----
3840.96 4900.00 -----
3140.12 2800.00 340.12
3402.78 3500.00 -----
2446.67 1400.00 1046.67
2831.18 2100.00 731.18
1068.01 140.00 928.01
1906.36 700.00 1206.36
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.6532 Cwd x Cf =0.72
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 32, 25, 26 & 39
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =1.03 cfs 5 111 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
14315 0.329 0.9 1.1 0.99 0.99 0.325340909
11621 0.267 0.2 1.1 0.22 0.22 0.058691919
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
25936 0.5954 0.3840
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.38
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 4.12
5 3.83 1.47
10 2.46 0.94
15 1.89 0.73
20 1.58 0.61
25 1.37 0.52
30 1.22 0.47
35 1.10 0.42
40 1.01 0.39
45 0.94 0.36
50 0.88 0.34
55 0.82 0.32
60 0.78 0.30
75 0.68 0.26
90 0.60 0.23
105 0.55 0.21
120 0.50 0.19
150 0.43 0.17
180 0.39 0.15
360 0.25 0.10
720 0.16 0.06
1440 0.10
185.30 ft3 4.12 (ft3/s)
2637.98 44400.00 -----
3385.65 88800.00 -----
1601.51 11100.00 -----
2055.42 22200.00 -----
1384.00 7400.00 -----
1499.77 9250.00 -----
1247.84 5550.00 -----
1319.04 6475.00 -----
1078.36 3700.00 -----
1168.57 4625.00 -----
1009.86 3083.33 -----
1045.11 3391.67 -----
931.91 2466.67 -----
972.27 2775.00 -----
840.22 1850.00 -----
888.17 2158.33 -----
726.11 1233.33 -----
786.85 1541.67 -----
565.76 616.67 -----
654.67 925.00 -----
246.96 61.67 185.30
440.82 308.33 132.49
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.5864 Cwd x Cf =0.64
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 33
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Area (sq.ft.)Infiltration Rate (in/hr)
Discharge Rate, d =0.10 cfs 56.5 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
9803 0.225 0.9 1.1 0.99 0.99 0.222795455
2241 0.051 0.2 1.1 0.22 0.22 0.011318182
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
12044 0.2765 0.2341
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.23
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 2.51
5 3.83 0.90
10 2.46 0.57
15 1.89 0.44
20 1.58 0.37
25 1.37 0.32
30 1.22 0.28
35 1.10 0.26
40 1.01 0.24
45 0.94 0.22
50 0.88 0.21
55 0.82 0.19
60 0.78 0.18
75 0.68 0.16
90 0.60 0.14
105 0.55 0.13
120 0.50 0.12
150 0.43 0.10
180 0.39 0.09
360 0.25 0.06
720 0.16 0.04
1440 0.10
323.72 ft3 2.51 (ft3/s)
1608.16 4523.89 -----
2063.95 9047.79 -----
976.31 1130.97 -----
1253.02 2261.95 -----
843.71 753.98 89.73
914.29 942.48 -----
760.71 565.49 195.22
804.11 659.73 144.38
657.39 376.99 280.40
712.38 471.24 241.14
615.63 314.16 301.47
637.12 345.58 291.54
568.11 251.33 316.78
592.71 282.74 309.97
512.22 188.50 323.72
541.44 219.91 321.53
442.65 125.66 316.99
479.68 157.08 322.60
344.90 62.83 282.07
399.10 94.25 304.85
150.55 6.28 144.27
268.73 31.42 237.32
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.7698 Cwd x Cf =0.85
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 34
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =1.20 cfs 5 130 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
15733 0.361 0.9 1.1 0.99 0.99 0.357568182
0 0.000 0.2 1.1 0.22 0.22 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
15733 0.3612 0.3576
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.36
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 3.83
5 3.83 1.37
10 2.46 0.88
15 1.89 0.68
20 1.58 0.56
25 1.37 0.49
30 1.22 0.43
35 1.10 0.39
40 1.01 0.36
45 0.94 0.34
50 0.88 0.31
55 0.82 0.29
60 0.78 0.28
75 0.68 0.24
90 0.60 0.22
105 0.55 0.19
120 0.50 0.18
150 0.43 0.16
180 0.39 0.14
360 0.25 0.09
720 0.16 0.06
1440 0.10
157.72 ft3 3.83 (ft3/s)
2456.19 52000.00 -----
3152.33 104000.00 -----
1491.14 13000.00 -----
1913.77 26000.00 -----
1288.63 8666.67 -----
1396.41 10833.33 -----
1161.85 6500.00 -----
1228.15 7583.33 -----
1004.05 4333.33 -----
1088.04 5416.67 -----
940.27 3611.11 -----
973.09 3972.22 -----
867.69 2888.89 -----
905.27 3250.00 -----
782.32 2166.67 -----
826.96 2527.78 -----
676.07 1444.44 -----
732.62 1805.56 -----
526.77 722.22 -----
609.56 1083.33 -----
229.94 72.22 157.72
410.44 361.11 49.33
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.9000 Cwd x Cf =0.99
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 35
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =2.55 cfs 5 275 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
63080 1.448 0.9 1.1 0.99 0.99 1.433636364
3866 0.089 0.2 1.1 0.22 0.22 0.019525253
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
66946 1.5369 1.4532
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =1.45
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 15.57
5 3.83 5.56
10 2.46 3.57
15 1.89 2.75
20 1.58 2.29
25 1.37 1.98
30 1.22 1.77
35 1.10 1.60
40 1.01 1.47
45 0.94 1.36
50 0.88 1.27
55 0.82 1.20
60 0.78 1.13
75 0.68 0.98
90 0.60 0.87
105 0.55 0.79
120 0.50 0.73
150 0.43 0.63
180 0.39 0.56
360 0.25 0.36
720 0.16 0.23
1440 0.10
904.15 ft3 15.57 (ft3/s)
9981.97 110000.00 -----
12811.12 220000.00 -----
6060.03 27500.00 -----
7777.60 55000.00 -----
5236.99 18333.33 -----
5675.05 22916.67 -----
4721.76 13750.00 -----
4991.20 16041.67 -----
4080.48 9166.67 -----
4421.80 11458.33 -----
3821.25 7638.89 -----
3954.64 8402.78 -----
3526.29 6111.11 -----
3679.03 6875.00 -----
3179.36 4583.33 -----
3360.79 5347.22 -----
2747.56 3055.56 -----
2977.38 3819.44 -----
2140.80 1527.78 613.02
2477.25 2291.67 185.58
934.49 152.78 781.72
1668.04 763.89 904.15
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.8596 Cwd x Cf =0.95
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 36
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.47 cfs 5 51 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
6891 0.158 0.9 1.1 0.99 0.99 0.156613636
1305 0.030 0.2 1.1 0.22 0.22 0.006590909
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
8196 0.1882 0.1632
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.16
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 1.75
5 3.83 0.62
10 2.46 0.40
15 1.89 0.31
20 1.58 0.26
25 1.37 0.22
30 1.22 0.20
35 1.10 0.18
40 1.01 0.17
45 0.94 0.15
50 0.88 0.14
55 0.82 0.13
60 0.78 0.13
75 0.68 0.11
90 0.60 0.10
105 0.55 0.09
120 0.50 0.08
150 0.43 0.07
180 0.39 0.06
360 0.25 0.04
720 0.16 0.03
1440 0.10
76.62 ft3 1.75 (ft3/s)
1121.07 20400.00 -----
1438.82 40800.00 -----
680.60 5100.00 -----
873.50 10200.00 -----
588.17 3400.00 -----
637.36 4250.00 -----
530.30 2550.00 -----
560.56 2975.00 -----
458.28 1700.00 -----
496.61 2125.00 -----
429.16 1416.67 -----
444.15 1558.33 -----
396.04 1133.33 -----
413.19 1275.00 -----
357.07 850.00 -----
377.45 991.67 -----
308.58 566.67 -----
334.39 708.33 -----
240.43 283.33 -----
278.22 425.00 -----
104.95 28.33 76.62
187.34 141.67 45.67
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.7885 Cwd x Cf =0.87
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 37
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =25 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.39 cfs 5 42 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
3567 0.082 0.9 1.1 0.99 0.99 0.081068182
405 0.009 0.2 1.1 0.22 0.22 0.002045455
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
0 1.1 0.00 0.00 0
3972 0.0912 0.0831
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =0.08
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 10.72 0.89
5 3.83 0.32
10 2.46 0.20
15 1.89 0.16
20 1.58 0.13
25 1.37 0.11
30 1.22 0.10
35 1.10 0.09
40 1.01 0.08
45 0.94 0.08
50 0.88 0.07
55 0.82 0.07
60 0.78 0.06
75 0.68 0.06
90 0.60 0.05
105 0.55 0.05
120 0.50 0.04
150 0.43 0.04
180 0.39 0.03
360 0.25 0.02
720 0.16 0.01
1440 0.10
30.12 ft3 0.89 (ft3/s)
570.92 16800.00 -----
732.73 33600.00 -----
346.60 4200.00 -----
444.84 8400.00 -----
299.53 2800.00 -----
324.58 3500.00 -----
270.06 2100.00 -----
285.47 2450.00 -----
233.38 1400.00 -----
252.90 1750.00 -----
218.56 1166.67 -----
226.19 1283.33 -----
201.69 933.33 -----
210.42 1050.00 -----
181.84 700.00 -----
192.22 816.67 -----
157.15 466.67 -----
170.29 583.33 -----
122.44 233.33 -----
141.69 350.00 -----
53.45 23.33 30.12
95.40 116.67 -----
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.8286 Cwd x Cf =0.91
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 38
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =10 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.00 cfs 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
45038 1.034 0.9 1 0.90 0.90 0.93053719
14198 0.326 0.2 1 0.20 0.20 0.065188246
0 1 0.00 0.00 0
0 1 0.00 0.00 0
0 1 0.00 0.00 0
59236 1.3599 0.9957
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =1.00
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 9.16 9.12
5 3.22 3.20
10 2.05 2.04
15 1.58 1.57
20 1.31 1.30
25 1.13 1.13
30 1.00 1.00
35 0.91 0.90
40 0.83 0.83
45 0.77 0.77
50 0.72 0.72
55 0.68 0.67
60 0.64 0.64
75 0.55 0.55
90 0.49 0.49
105 0.44 0.44
120 0.41 0.41
150 0.35 0.35
180 0.31 0.31
360 0.20 0.20
720 0.13 0.13
1440 0.08
2,924.04 ft3 9.12 (ft3/s)
5474.39 0.00 5474.39
6977.44 0.00 6977.44
3369.88 0.00 3369.88
4295.12 0.00 4295.12
2924.04 0.00 2924.04
3161.56 0.00 3161.56
2643.95 0.00 2643.95
2790.52 0.00 2790.52
2294.15 0.00 2294.15
2480.51 0.00 2480.51
2152.33 0.00 2152.33
2225.34 0.00 2225.34
1990.63 0.00 1990.63
2074.40 0.00 2074.40
1799.95 0.00 1799.95
1899.73 0.00 1899.73
1561.82 0.00 1561.82
1688.68 0.00 1688.68
1225.38 0.00 1225.38
1412.22 0.00 1412.22
547.36 0.00 547.36
961.41 0.00 961.41
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.7322 Cwd x Cf =0.73
Runoff Volume Discharge Volume Site Detention
=
Landscape
Totals
Impervious
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed 40 & 41
Surface Type
=
Project: Icon Home Apartments
Project #: 17007.02
Date: 7/25/2017
Design Storm Frequency =10 years
Unit Width (ft)Unit Length (ft)Infiltration Rate (in/hr)
Discharge Rate, d =0.63 cfs 4 85 80
Input values for runoff coefficients from appropriate tables.
Area Area
Runoff
Coefficient
Frequency
Factor
Calculation
Value
A A/(43560 ft2/acre)C Cf C x Cf C' C' x A
(ft2)(Acres)=(C x Cf) < or = 1 (Acres)
0 0.000 0 1 0.00 0.00 0
0 1 0.00 0.00 0
0 1 0.00 0.00 0
0 1 0.00 0.00 0
0 1 0.00 0.00 0
0 0.0000 0.0000
Weighted Runoff Coefficient, Cwd SCjAj
SAj
Cwd x Cf x SAj =
Where Cj is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
Rainfall Rainfall Peak Flow
Duration, t Intensity, i = Cwd x SAj x i
(min) (in/hr)(ft3/s)
1 9.16
5 3.22
10 2.05
15 1.58
20 1.31
25 1.13
30 1.00
35 0.91
40 0.83
45 0.77
50 0.72
55 0.68
60 0.64
75 0.55
90 0.49
105 0.44
120 0.41
150 0.35
180 0.31
360 0.20
720 0.13
1440 0.08
153.67 ft3 - (ft3/s)
4687.00 4533.33 153.67
= Cwd x SAj x i x t = d x t = Runoff Volume - Discharge Volume
(ft3) (ft3) (ft3)
= 0.0000 Cwd x Cf =
Runoff Volume Discharge Volume Site Detention
=
Totals
N/A
RATIONAL METHOD FOR RUNOFF CALCULATIONS
Post-Project Watershed Ferguson Farms Deficient Volume
Surface Type
=
TABLE I-1: Runoff Coefficients for Use in the Rational Method
LAND USE RUNOFF COEFFICIENTS, C
Open Land 0.2
Low to Medium Density Residential 0.35
Dense Residential 0.5
Commercial Neighborhood 0.6
Commercial Downtown 0.8
Industrial 0.8
Design Standards and Specifications Policy
City of Bozeman, March 2004 as Amended
RAINFALL INTENSITY-DURATION CURVES (Figures I-2, I-3)
Time 2 5 10 25 50 100
(min)(in/hr)(in/hr)(in/hr)(in/hr)(in/hr)(in/hr)
1 4.20 7.15 9.16 10.72 13.72 15.69
5 1.60 2.55 3.22 3.83 4.74 5.34
10 1.05 1.64 2.05 2.46 3.00 3.35
15 0.83 1.26 1.58 1.89 2.30 2.56
20 0.70 1.05 1.31 1.58 1.90 2.11
25 0.61 0.91 1.13 1.37 1.64 1.82
30 0.55 0.81 1.00 1.22 1.45 1.61
35 0.50 0.73 0.91 1.10 1.31 1.45
40 0.46 0.67 0.83 1.01 1.20 1.33
45 0.43 0.63 0.77 0.94 1.11 1.22
50 0.40 0.58 0.72 0.88 1.04 1.14
55 0.38 0.55 0.68 0.82 0.97 1.07
60 0.36 0.52 0.64 0.78 0.92 1.01
75 0.31 0.45 0.55 0.68 0.79 0.87
90 0.28 0.40 0.49 0.60 0.70 0.77
105 0.26 0.36 0.44 0.55 0.64 0.69
120 0.24 0.33 0.41 0.50 0.58 0.63
150 0.21 0.29 0.35 0.43 0.50 0.55
180 0.19 0.26 0.31 0.39 0.45 0.48
360 0.12 0.17 0.20 0.25 0.28 0.30
720 0.08 0.11 0.13 0.16 0.18 0.19
1440 0.05 0.07 0.08 0.10 0.11 0.12
Storm Recurrence Interval
Design Standards and Specifications Policy
City of Bozeman, March 2004 as Amended
Zoning District/Design Storm Requirement
Zoning Type
Design Rainfall
Frequency
Open Land 2-year
Residential 10-year
Commercial 10-year
(p. 28, Table I-3)
STORMWATER MANAGEMENT MANUAL
TABLE 2-5 FREQUENCY FACTORS FOR THE RATIONAL FORMULA
Recurrence Interval Adjustment Factor
(Years)Cf
2 1.00
5 1.00
10 1.00
25 1.10
50 1.20
100 1.25
* C X Cf should not exceed 1.0
V:17007_02_Storm_Drainage_Plan_030716_SC 11 (03/07/18) SN/jil
Appendix C
STORMWATER UNIT VOLUMES
COST
Square Footage of 6" PaveDrain 1 sf 0.09 cf sf $0.00
#57 Stone Base Thickness 30 inches 1.00 cf ton $0.00
Capacity 40%
#2 Stone Sub-Base Thickness (Not Required)0 inches 0.00 cf ton $0.00
Capacity 40%
Modular Storage System 1 0 0.00 cf cf $0.00
90%
TOTAL SYSTEM HEIGHT:36 inches 1.09 cf Total System Capacity
1.09 cf/sf System Efficiency
SYSTEM COST:$0 $0.00 cf Cost per Cubic Foot
Required System Capacity 0 cf Required PaveDrain Area:0.0 sf
6" PaveDrain 6 inches 0.09 cf/sf
#57 Stone Base Thickness 6 inches 0.20 cf/sf
Capacity 40%
#2 Stone Sub-Base Thickness (Not Required)0 inches 0.00 cf/sf
Capacity 40%
Modular Storage System Height 1 0 0.00 cf/sf
95%
TOTAL SYSTEM HEIGHT:12 inches 0.29 Total cf/sf
CAPACITY
Determine Storage Capacity of PaveDrain
Determine PaveDrain Area Required to Meet Storage Demand
CAPACITY
ACF Environmental
800-448-3636 www.acfenvironmental.com
ACF Environmental
800-448-3636 www.acfenvironmental.com
Combined.txt
DEPRESSION AREAS ABOVE DRY WELLS - STAGE STORAGE TABLES
Stage Storage Table
Project: Icon Home Apartments
Basin Description: Unit 2A
Contour Contour Depth Incremental Cumulative Incremental Cumulative
Elevation Area (ft) Volume Volume Volume Volume
(sq. ft) Avg. End Avg. End Conic Conic
(cu. ft) (cu. ft) (cu. ft) (cu. ft)
4,820.60 2 N/A N/A 0.00 N/A 0.00
4,820.70 33 0.10 1.72 1.72 1.40 1.40
4,820.80 102 0.10 6.75 8.47 6.43 7.83
4,820.90 211 0.10 15.66 24.13 15.34 23.17
4,821.00 347 0.10 27.89 52.03 27.61 50.78
4,821.10 487 0.10 41.71 93.73 41.51 92.29
4,821.20 631 0.10 55.89 149.63 55.74 148.03
4,821.30 777 0.10 70.41 220.04 70.28 218.31
4,821.40 928 0.10 85.25 305.29 85.14 303.45
Stage Storage Table
Project: Icon Home Apartments
Basin Description: Unit 2B
Contour Contour Depth Incremental Cumulative Incremental Cumulative
Elevation Area (ft) Volume Volume Volume Volume
(sq. ft) Avg. End Avg. End Conic Conic
(cu. ft) (cu. ft) (cu. ft) (cu. ft)
4,820.90 18 N/A N/A 0.00 N/A 0.00
4,821.00 76 0.10 4.70 4.70 4.37 4.37
4,821.10 165 0.10 12.01 16.71 11.73 16.10
4,821.20 284 0.10 22.43 39.14 22.16 38.26
4,821.30 435 0.10 35.93 75.07 35.66 73.93
4,821.40 616 0.10 52.52 127.59 52.26 126.18
Stage Storage Tables
Project: Icon Home Apartments
Basin Description: Unit 2C
Contour Contour Depth Incremental Cumulative Incremental Cumulative
Elevation Area (ft) Volume Volume Volume Volume
(sq. ft) Avg. End Avg. End Conic Conic
(cu. ft) (cu. ft) (cu. ft) (cu. ft)
4,821.00 7 N/A N/A 0.00 N/A 0.00
4,821.10 103 0.10 5.48 5.48 4.53 4.53
4,821.20 482 0.10 29.25 34.72 26.92 31.45
Stage Storage Table
Project: Icon Home Apartments
Basin Description: Unit 4A
Contour Contour Depth Incremental Cumulative Incremental Cumulative
Elevation Area (ft) Volume Volume Volume Volume
(sq. ft) Avg. End Avg. End Conic Conic
(cu. ft) (cu. ft) (cu. ft) (cu. ft)
4,822.20 6 N/A N/A 0.00 N/A 0.00
4,822.30 46 0.10 2.58 2.58 2.27 2.27
4,822.40 97 0.10 7.15 9.73 6.99 9.26
4,822.50 154 0.10 12.58 22.31 12.47 21.72
4,822.60 217 0.10 18.58 40.88 18.49 40.21
4,822.70 286 0.10 25.14 66.02 25.06 65.27
Page 1
Combined.txt
4,822.80 360 0.10 32.28 98.30 32.20 97.48
4,822.90 440 0.10 39.98 138.27 39.91 137.39
4,823.00 525 0.10 48.25 186.52 48.18 185.57
4,823.10 616 0.10 57.08 243.60 57.02 242.59
Stage Storage Table
Project: Icon Home Apartments
Basin Description: Unit 4B
Contour Contour Depth Incremental Cumulative Incremental Cumulative
Elevation Area (ft) Volume Volume Volume Volume
(sq. ft) Avg. End Avg. End Conic Conic
(cu. ft) (cu. ft) (cu. ft) (cu. ft)
4,822.50 20 N/A N/A 0.00 N/A 0.00
4,822.60 82 0.10 5.10 5.10 4.74 4.74
4,822.70 187 0.10 13.43 18.52 13.08 17.82
4,822.80 333 0.10 25.97 44.50 25.62 43.44
4,822.90 497 0.10 41.47 85.97 41.20 84.64
4,823.00 663 0.10 57.99 143.96 57.79 142.43
4,823.10 833 0.10 74.82 218.78 74.66 217.09
Stage Storage Table
Project: Icon Home Apartments
Basin Description: Unit 4C
Contour Contour Depth Incremental Cumulative Incremental Cumulative
Elevation Area (ft) Volume Volume Volume Volume
(sq. ft) Avg. End Avg. End Conic Conic
(cu. ft) (cu. ft) (cu. ft) (cu. ft)
4,822.80 28 N/A N/A 0.00 N/A 0.00
4,822.90 97 0.10 6.26 6.26 5.91 5.91
4,823.00 192 0.10 14.47 20.73 14.20 20.12
4,823.10 300 0.10 24.62 45.36 24.42 44.54
Stage Storage Table
Project: Icon Home Apartments
Basin Description: Unit 4D
Contour Contour Depth Incremental Cumulative Incremental Cumulative
Elevation Area (ft) Volume Volume Volume Volume
(sq. ft) Avg. End Avg. End Conic Conic
(cu. ft) (cu. ft) (cu. ft) (cu. ft)
4,823.00 49 N/A N/A 0.00 N/A 0.00
4,823.10 280 0.10 16.44 16.44 14.85 14.85
Stage Storage Table
Project: Icon Home Apartments
Basin Description: Unit 26A
Contour Contour Depth Incremental Cumulative Incremental Cumulative
Elevation Area (ft) Volume Volume Volume Volume
(sq. ft) Avg. End Avg. End Conic Conic
(cu. ft) (cu. ft) (cu. ft) (cu. ft)
4,808.70 0 N/A N/A 0.00 N/A 0.00
4,808.80 8 0.10 0.41 0.41 0.28 0.28
4,808.90 23 0.10 1.59 2.00 1.52 1.80
4,809.00 44 0.10 3.36 5.37 3.31 5.11
4,809.10 69 0.10 5.64 11.01 5.60 10.71
4,809.20 99 0.10 8.43 19.44 8.38 19.09
4,809.30 135 0.10 11.72 31.16 11.68 30.77
Stage Storage Table
Page 2
Combined.txt
Project: Icon Home Apartments
Basin Description: Unit 26B
Contour Contour Depth Incremental Cumulative Incremental Cumulative
Elevation Area (ft) Volume Volume Volume Volume
(sq. ft) Avg. End Avg. End Conic Conic
(cu. ft) (cu. ft) (cu. ft) (cu. ft)
4,808.90 8 N/A N/A 0.00 N/A 0.00
4,809.00 34 0.10 2.10 2.10 1.96 1.96
4,809.10 69 0.10 5.15 7.25 5.05 7.00
4,809.20 108 0.10 8.89 16.15 8.82 15.82
4,809.30 151 0.10 12.97 29.12 12.91 28.74
Stage Storage Table
Project: Icon Home Apartments
Basin Description: Unit 26C
Contour Contour Depth Incremental Cumulative Incremental Cumulative
Elevation Area (ft) Volume Volume Volume Volume
(sq. ft) Avg. End Avg. End Conic Conic
(cu. ft) (cu. ft) (cu. ft) (cu. ft)
4,809.10 12 N/A N/A 0.00 N/A 0.00
4,809.20 30 0.10 2.14 2.14 2.08 2.08
4,809.30 51 0.10 4.05 6.20 4.01 6.09
Stage Storage Table
Project: Icon Home Apartments
Basin Description: Unit 26D
Contour Contour Depth Incremental Cumulative Incremental Cumulative
Elevation Area (ft) Volume Volume Volume Volume
(sq. ft) Avg. End Avg. End Conic Conic
(cu. ft) (cu. ft) (cu. ft) (cu. ft)
4,808.90 8 N/A N/A 0.00 N/A 0.00
4,809.00 31 0.10 1.96 1.96 1.83 1.83
4,809.10 65 0.10 4.81 6.77 4.71 6.54
4,809.20 102 0.10 8.31 15.09 8.24 14.79
4,809.30 142 0.10 12.16 27.25 12.11 26.89
Page 3