Loading...
HomeMy WebLinkAbout01_Site Plan Submittal Cover Letter_03-31-2020MINARIK ARCHITECTURE Inc. 2222 NE Oregon St. s217, Portland OR 97232 MINARIKARCH.COM 971 319 6249 Building J at the Cannery District 4.23.2020 1 of 1 March 31, 2020 City of Bozeman Planning and Engineering P.O. Box 1230 Bozeman, MT 59771-1230 Re: Building J at the Cannery District Site Plan Submittal|211 East Oak Street Thank you for this opportunity to submit a site plan review for Building J at the Cannery District. Building J will be the final new building constructed within the Cannery District. It proposes 2 stories of office use. Total usable square footage of Building J is approximately 13,600. The following information is included with this application in the form of an Application packet and 24x36 Drawing Set [notes in brackets represent digital locations]: Application Packet [Folder - Documents] 1) Cover Letter 2) City of Bozeman Forms: A1 Development Application, SP Site Plan Application, N1 Noticing, SP1 Site Plan Checklist 3) Site Plan Checklist Narrative 4) Concept Review Comments Narrative 5) PUD Conformance Narrative [Folder - Appendices] 6) Noticing Addresses for Property Owners within 200 Feet of Subject Property 7) Exterior Materials Reference 8) Department of Natural Resources and Conservation Water Rights Letter 9) Water Fixture Count Form 10) Cannery District Parking Table 11) PUD Comprehensive Signage Plan 12) Cannery District Storm Water Plan 13) Cannery District Water Engineer’s Report 14) Cannery District Sewer Engineer’s Report 15) Cannery District Open Space PUD 16) Cannery District PUD Conditions of Approval 17) Window and Storefront Cut Sheets 18) Recorded Amended Plat C-41-M [Folder - Plans] 24x36 Drawing Set See drawing cover sheet for full sheet index, which includes Civil, Architectural, Landscape, and Site Electrical drawings. This is an exciting project and we look forward to your feedback. Sincerely, Douglas Minarik, AIA Minarik Architecture, Inc.