DESIGN REPORT
FOR:
CRESTVIEW CONDOMINIUMS
BOZEMAN, MT
Prepared By:
MADISON
ENGINEERING
Madison Engineering
895 Technology Drive, Suite 203
Bozeman, MT 59718
(406) 586-0262
NOVEMBER 2018
SEWER MAIN
DESIGN REPORT
FOR:
CRESTVIEW CONDOMINIUMS
BOZEMAN, MT
ai�TA/��
�� <J
• . CHINS G.
' QUDI:" 'I CC -
Lu
MIS
Madison Engineering
895 Technology Blvd Ste 203
Bozeman, MT 59718
(406) 586-0262
NOVEMBER 2018
i
,� � �- -
SANITARY SEWER MAIN CALCULATIONS
8-Inch PVC_Pipe Capacity
Project DeBcripUDn
Friction Method Manning Formula
Sohn For Discharge
Input Data
Roughness Coefiiclent 0.013
Channel Slope 0.40000 %
Normal Depth 5.58 In
Diameter 8.00 In
Results
Discharge 0.64 Via
Flow Aron 0.28 IP
Wetted perimeter 1.32 1t
Hydraulic Rodiue 2.37 In
Top VWdth 0.81 a
Critical Depth 0.38 R
Percent Full 49•8 %
Critical Slope O.DD748 Mt
yalocky 2.45 1Ns
VMochy Head 0.09 A
SpscMc Eiww 0.56 R
Frauds Number 0.86
Maxin►um Discharge 0.82 ftl/s
Discharge Full 0.76 Rh
Slope Fug 0.00278 WR
Flow Type SubCrMlcel
GVF Input Data
D0wno(rom Depth O.OD In
Length 0.00 R
Number OM" 0
GVF Output Data
Upetmam Depth 0.00 In
ProRle Description
Profile Hoodlum 0.00 R
Average End Depth Over Rise 0.00 %
Normal Depth Over Rise 69.75 %
Downstream Velocity Infinity R/a
Bentley systems,Inc. Hassled Methods so~18~111aster Vol(SELECTssriss 1) 101.11.01.031
4/11/2016 940:06 AM 27 Blemons company Drive Suite 210 W Watertown,CT o6T66 USA+14103 T66-1666 Papa 1 of 2
i
II
�I
CRESTVIEW CONDOMINIUMS
SEWER MAIN EXTENSION REPORT
A. General Project Description
This report will give an overview of the proposed wastewater collection system for the
development of the Crestview Condominiums in Lot 6 of the Baxter Lane Subdivision on the
southwest corner of Sartain St and Thomas Dr in Bozeman. The zoning for the area is listed as
R-4, residential high density. The proposed condominiums are designed as one 12-plex and one
10-plex for a total of 22 units. The improvements are anticipated to be constructed during the
winter of 2018.
Included in this report is a description of the proposed wastewater collection system and design
parameters. Once the wastewater system is constructed and approved,the system will become a
part of the City of Bozeman system. The following references were used in the wastewater
facilities design and capacity analysis:
a. COB Design Standards and Specifications Policy, 2017. Addendum#6
b. COB Modification to Montana Public Works Standard Specifications (MPWSS)
c. City adopted MPWSS and adopted Addenda
d. COB Wastewater Facility Plan, 2017
e. WQB Circular No. 2
f. City of Bozeman Zoning Map
The procedures and parameters outlined in the COB Design Standards and Specifications Guide
were used in the design of the sewer infrastructure for the proposed development.
B. Capacity Analysis
The effluent generated from the proposed condominiums will be collected by one 8-inch sanitary
sewer main extending from the development to an existing COB SSMH. This 8-inch sewer main
will flow east into a proposed sewer manhole before flowing north into an existing manhole near
the intersection of Sartain Street and Thomas Drive.
The wastewater demands from the proposed subdivision were estimated based on a flow per capita
basis, which provided a more conservative flow than a per zoned acre basis. (COB Table V-1
specifies an average daily flow rate of 1,950 gal/ac-day for R-4 zoning, resulting in 1,658
gpd=0.85ac x 1,950 gal/ac-day).
The proposed sewer mains have been sized to flow at no more than 75-percent of full capacity at
peak hour conditions of full build out, and a Manning coefficient of 0.013 was used for PVC pipe.
Crestview Condominiums
Wastewater Design Report
Page 1 of 3
Crestview Condominiums
The average daily flow is based on the number of units, 2.11 residents per unit, and 89 gallons per
capita per day, the latter two values based on COB design standards:
(
residents gallons 22 units * 2.11 * 89 ) = 4,131gpd
unit capita/day
An approximate population for the condominiums is calculated as:
residents
22 units * 2.11 = 47 persons
unit
This is a more realistic population value compared to utilizing the 10.4 units per acre (Table V-1
from COB design standards) applied to 0.85 acres, which only results in 19 persons.
This equivalent population can be utilized to determine a peaking factor:
Qmax _ 18 + P.5 _ 18 +.047.5
= 4.32
QAve 4 + P•5 4 +.047-5
(P =Population/thousands)
Based on a total population of 47 people, a peaking factor of 4.32 was calculated. The peak flow
rate anticipated from the development based on an average daily flow of 4,131 gallons per day is:
Peak Flow Rate = (4,131 gpd x 4.32) = 17,846 gpd
= 12.39 gpm
= 0.028 cfs
Additionally, an infiltration flow of 128 gpd(150 gal/acre/day x 0.85 acres)has been added to the
flow, resulting in a total flow of 17,974 gpd (0.028 cfs).
The sewer main size for the development will be an 8-inch, based on minimum required pipe size
and slope. An 8-inch PVC sewer main at 0.40% slope has a capacity of 0.64 cfs at 1/4 pipe depth,
which has adequate capacity for the proposed peak flow of 0.028 cfs effluent generated from the
site. Calculations are included in the end of this report.
C. Proposed Collection System
PVC pipe meeting COB specifications will be used for the sewer mains. The effluent from the
Crestview Condominiums will drain into a proposed 8-inch diameter sanitary sewer main via 4-
inch sewer services. The effluent in the 8-inch will then flow east to a proposed manhole before
turning north and flow to an existing manhole and existing 8" sewer main in Sartain Street. The
Crestview Condominiums
Wastewater Design Report
Page 2 of 3
maximum manhole spacing will be 400 feet for the 8-inch main. Manholes will be constructed
according to COB specifications. All sewer services will be 4-inch PVC installed at 2%minimum
grade. Sewer services will connect into the main with in-line gasketed wyes. The sewer main will
maintain a minimum separation of 10-feet horizontally and 18-inches vertically from any proposed
or existing public water mains.
D. Downstream Capacity Analysis
The sanitary sewer mains were designed in conformance with the City of Bozeman Wastewater
Improvement Plan. It is anticipated that the City of Bozeman sanitary sewer system has enough
capacity to accommodate the main extension. A capacity letter from a City Engineer will be
required prior to DEQ approval of the system.
E. Conclusion
As outlined above, one single 8-inch sanitary sewer main serving the Crestview Condominiums
has the capacity for the effluent generated from the subdivision. This project will require the
approval of the City Engineer and MDEQ.
Crestview Condominiums
Wastewater Design Report
Page 3 of 3