HomeMy WebLinkAbout18 - Design Report - Gallatin Center Lot 12 (Winco) - Water, Sewer Relocation WATER& SEWR MAIN
RELOCATION
DESIGN REPORT
FOR:
Gallatin Center Lot 12
BOZEMAN, MT
Prepared By:
MADISON
ENGINEERING
Madison Engineering
895 Technology Drive, Suite 203
Bozeman, MT 59718
(406) 586-0262
November 2018
WATER & SEWER MAIN
RELOCATION
DESIGN REPORT
FOR:
GALLATIN CENTER LOT 12
BOZEMAN, MT
NTA
o. Ci1RISG. � •
EtJD!:SKI
P!o. 38 PE w
, . : 4U
Madison Engineering
895 Technology Blvd Ste 203
Bozeman, MT 59718
(406) 586-0262
November 2018
GALLATIN CENTER LOT 12
WATER MAIN DESIGN REPORT
A. General Project Description
This report will give an overview of the proposed relocation of the 8"water main for the
development of Lot 12 in Gallatin Center. The site is situated at the NW corner intersection of
Cattail Street and Max Avenue in Bozeman, MT. The 11.38-acre site is zoned B-2, a community
business district to provide for a broad range of mutually supportive retail and service functions.
The legal description of the site is Lot 12A, Lot 12B and 12C Gallatin Center Subdivision PUD
Phase IV S35, TO S, R05 E P.M.M., Bozeman, Gallatin County Montana. The proposed
development is anticipated to be constructed during the fall of 2018. Once the water main is
constructed and approved, the system will become a part of the City of Bozeman system.
B. Proposed Water Relocation
The proposed water main relocation consists of approximately 718 linear feet of new 8" ductile
iron pipe extending south along the proposed parking driveway for the future building of Winco.
The main will connect to the existing 8"water main on the north end and to the existing 8"water
main on Cattail Street. The proposed relocation is due to the development of the Gallatin Center
Subdivision and the encroachment of the proposed Winco building. The relocation will continue
to support adequate capacity, no change in pipe size is required.
The layout of the proposed water main meets the COB design criteria and will be located within a
30' wide easement and separated from the proposed sanitary sewer main by a minimum distance
of 10 feet horizontally.New fire hydrants will be installed to not to exceed 600' spacing, fulfilling
the distance requirement for fire hydrant spacing, as well as assisting in flushing of the main. New
gate valves will be installed at the connection point to the existing mains as well as pipe
intersections,per City standards and also meeting spacing requirements.
C. Conclusion
The proposed 8-inch water main relocation for the development of Gallatin Center Lot 12 will
continue to provide adequate service to meet the peak hour demand for the site. The water main
design is consistent with the City of Bozeman Water Facility Plan. The existing water main will
be removed and will not be used for the relocated main.
This project will require the approval of the City of Bozeman Engineer and MDEQ.
GALLATIN CENTER LOT 12
SEWER MAIN DESIGN REPORT
A. General Project Description
This report will give an overview of the proposed relocation of the 8" sanitary sewer for the
development of Lot 12 in Gallatin Center. The site is situated at the NW corner intersection of
Cattail Street and Max Avenue in Bozeman, MT. The 11.38-acre site is zoned B-2, a community
business district to provide for a broad range of mutually supportive retail and service functions.
The legal description of the site is Lot 12A, Lot 12B and 12C Gallatin Center Subdivision PUD
Phase IV S35, TO S, R05 E P.M.M., Bozeman, Gallatin County Montana. The proposed
development is anticipated to be constructed during the fall of 2018. Once the wastewater system
is constructed and approved,the system will become a part of the City of Bozeman system.
B. Proposed Sewer Relocation
The proposed sewer main relocation consists of approximately 131 linear feet of new 8"PVC pipe
extending south along the proposed parking driveway for the future building of Winco. The
effluent from the Gallatin Center will discharge into a proposed 8-inch diameter sanitary sewer
main via services. The effluent in the 8-inch will then flow east into an existing 8-inch sewer
main. The proposed relocation is due to the development of the Gallatin Center Subdivision and
the encroachment of the proposed Winco building. The relocation will continue to support
adequate capacity, no change in pipe size is required.
The layout of the proposed sewer main meets the COB design criteria and will be located within a
30' wide easement and separated from the proposed water main by a minimum distance of 10-feet
horizontally and 18-inches vertically from any proposed or existing public water mains. The
maximum manhole spacing will be 400 feet for the 8-inch sewer main. Manholes will be
constructed according to COB specifications. All sewer services will be 4-inch PVC minimum
installed at 2% minimum grade. Sewer services will connect into the main with in-line gasketed
wyes.
C. Conclusion
The proposed 8-inch sewer main relocation for the development of Gallatin Center Lot 12 will
continue to provide adequate service to meet the peak hour demand for the site. The sewer main
design is consistent with the City of Bozeman Wastewater Facility Plan. The existing sewer main
will be removed and will not be used for the relocated main
This project will require the approval of the City of Bozeman Engineer and MDEQ.