Ms. Jadin:
This letter is to provide a narrative response to the Conceptual Site Plan Application comments
dated March 3, 2018. Responses to these items are provided in italics below:
Planning Comments:
1. Applicants shall address and submit a narrative response to all Conceptual Review comments
along with Master Plan application.
This letter provides narrative responses to the concept comments.
2. A master site plan will be required for phasing of buildings and site improvements.
This is the submittal for the master site plan application.
3. Front setback along Laurel Parkway is 15 feet per Table 38.320.030.C.
Setbacks along Laurel Parkway have been adjusted to 15 feet and are shown on sheet C1.0.
4. The buildings must meet the requirements for single- to four-household dwellings and
rowhouses in 38.360.210 and 38.360.240, respectively, except where specifically excepted or
in conflict with Article 5.
Phase 9 and 10 units must meet requirements for rowhouses where primary
pedestrian access to the dwelling is from a private internal vehicular access
(38.3660.240.C).
As an alternative, the Phase 10 easternmost unit may be oriented to face
Laurel Parkway.
Civil/Structural Engineering and Surveying
All phases of buildings meet the requirements of their applicable sections. Phase 9 & 10 have
a 5’ sidewalk for pedestrian access. This is shown on sheets C1.0 and C1.1.
5. The Site Planning and Design Elements of 38.520 and Building Design requirements of 38.530
apply.
Applicant is aware of these requirements.
6. A direct sidewalk connection from Phase 9 and 10 buildings to Loxley Drive is recommended
in the proximity of Phase 1 and 2 buildings to achieve connection throughout the site and to
minimize walking distances (38.520.040.C).
A sidewalk connection to Loxley Drive is shown on sheets C1.0 and C1.1.
7. For sites larger than 2 acres, driveways are considered to be internal roadways. Internal
roadways must include street trees and sidewalks (38.520.050.D). All internal pathways are
required to have a minimum of 5-foot-wide unobstructed surface.
5’ sidewalk is proposed on north and east sides of the internal pathway. Sidewalks are shown
on sheet C1.0 and C1.1.
8. Open space for all multi-household development shall be provided in accordance with
38.520.060. (rather than the provisions for single- to four-household and rowhouse dwellings).
Calculations per dwelling must be provided and the method of providing open space(s) must
be described and depicted in the Master Site Plan application.
Sheet C1.0 shows the calculations of the required open space, and a break down of how it’s
being provided.
9. This lot has residential adjacency and is required to achieve 23 landscaping points per Table
38.550.060-1.
A landscape plan meeting the required number of performance points is included as part of
this submittal.
.
Engineering Comments:
1. Capacity is limited in the Laurel Glen Lift Station that serves this lot. The applicant must
analyze the original capacity basis in the lift station design for the proposed lot. Sanitary
sewer flows from the proposed lot may not exceed the original design basis without an
upgrade to the Laurel Glen Lift Station. An example of this analysis is available at the City
Engineering Division (Shawn Kohtz). The applicant indicated in the concept application
narrative, “The Applicant previously paid for the design and installation of the Laurel Glen
Lift Station that serves this lot. The lift station was originally designed to handle sanitary
sewer from the entirety of Laurel Glen Subdivision and this lot.” However; to confirm the
Civil/Structural Engineering and Surveying
applicant’s assertion, the applicant must verify the density of development and associated
sewer flows assumed for this lot in the lift station design report. Peak-hour flows from the
proposed project may not exceed the peak-hour design flows associated with the original
density assumed for the lot as defined in the lift station design report. The applicant must
provide the comparison analysis with the site plan application.
Capacity analysis is provided as part of this submittal.
2. The proposed drive access onto Annie Street will only be allowed as a right-in/right-out
restricted access. The left turn movement from Annie Street into the drive access would
cause traffic to backup into the roundabout. The applicant must construct a physical barrier
that will prevent the left-turn movement from Annie Street into the proposed drive access.
A raised barrier is proposed at the drive access on Annie Street. The drive access layout is
shown on sheets C1.0 and C1.1.
3. The applicant proposed an access onto Laurel Parkway as right-in/right-out only. To
accommodate the proposed configuration, the applicant must construct a physical barrier to
the left turn movements by extending the median in Laurel Parkway. Alternatively, the
applicant may construct a left-turn bay on Laurel Parkway to allow a full access at this
location, since the access on the east side of Laurel Parkway was relocated south of its
original planned location.
Right turn only sign for Laurel Parkway drive access is shown on sheet C1.1.
4. The applicant must provide a snow storage plan with the site plan application that
specifically identifies snow storage areas on the subject site. Snow may not be plowed onto
the public streets or into the vision triangles at the two drive accesses. The snow storage plan
must be incorporated in the property owner’s association documents.
Snow storage locations are shown on sheet C1.0.
5. The applicant must review the original stormwater analysis for the subdivision stormwater
system to verify the design assumptions accommodate the proposed project. The applicant
must provide this analysis with a future site plan submittal. If additional stormwater
detention is required, the applicant must provide that detention on site. The applicant’s
narrative indicated calculations will be provided upon site plan submittal.
Stormwater analysis is provided in Stormwater Design Report included with this submittal.
6. The applicant must review the proposed water and sewer services configuration with the City
Water and Sewer Superintendent (John Alston). Construction of water and sewer mains in
the drive lane may be required given the difficulty of locating services in the proposed plan
and the number of street cuts proposed.
Civil/Structural Engineering and Surveying
Based on John Alston’s recommendation water and sewer main extensions are proposed in-
lieu of new service taps.
7. Backfill in collector streets must be flowable fill the full depth of the trench. Laurel Parkway
is a collector street.
Note has been added to saw cut areas on sheet C1.1.
8. The applicant must contact the City Engineering Department (Brian Heaston) for an analysis
of cash-in-lieu of water rights (CIL) for the proposed project and pay any CIL due prior to
site plan approval.
Cash-in-Lieu has been provided with the underlying subdivision. Confirmation from Brian
Heaston is included with this submittal.
9. The applicant’s narrative indicated, “The applicant is aware of the high groundwater and is
not proposing the installation of sump pumps within the crawl spaces.” No crawl spaces may
be constructed unless the applicant specifically measures the seasonal high groundwater level
(SHGWL) and locates crawl spaces above the SHGWL. The SHGWL must be demonstrated
if crawl spaces will be constructed. Alternatively, slab-on-grade construction may be used
with no measurement of SHGWL. No basements will be allowed at this location.
Applicant is aware of this condition.
10. The applicant must review the turn radius of the drive aisle through the project to ensure the
corner can accommodate the turning radius of emergency vehicles as well as solid waste
vehicles. No obstacles such as utility cans or transformers may be placed on the corner such
that they interfere with the turn capabilities of the design vehicles. The applicant must
review the proposed design with the Solid Waste Superintendent (Kevin Handlin).
Turn analysis are provided as part of this application.
11. The applicant must paint and sign the curb along the property line that fronts Annie Street
“no parking” to accommodate the proposed access location onto Annie Street.
Curb paint and signage called out on sheet C1.1.
12. The applicant must work with the City Engineering Division (Bill Stezner) and the City Fire
Department to develop an addressing plan that sufficiently directs emergency services to the
correct locations.
Applicant is aware of this and will address prior to building permit issuance.
If you have any questions or need any more information please give me a call at 406.587.1115.
Civil/Structural Engineering and Surveying
Thanks,
Drew Carter, E.I.
G:\C&H\19\190065\SITE PLAN - CONCEPT\NARRATIVE RESPONSE TO CONCEPTUAL REVIEW COMMENTS (2019.03.26).DOCX