HomeMy WebLinkAbout0.0 Inadequate Letter 2019.05.14Page 1 of 3 FROM: DEVELOPMENT REVIEW COMMITTEE RE: JENNIFER PLACE CONDOMINIUMS, MASTER SITE PLAN AND SITE PLAN APPLICATIONS # 19153 & #19154 DATE: MAY 14, 2019 Project Location: 856 Loxley Drive, Bozeman, MT 59718. Laurel Glen Subdivision Phase 1, S04, T02 S, R05 E, Block 9, Lot 1, Acres 2.04, Plat J-374 Project Description: Master Site Plan for 10 2-unit condominiums, access road and site improvements. Site Plan for Phases 1-5. The property is zoned R-2 and is 2.042 acres. Recommendation: The DRC review finds that the project does not comply with the requirements of the Bozeman Municipal Code and is deeming the application inadequate for further review. Code corrections must be satisfied prior to continued review. All references are to the Bozeman Municipal Code (BMC). Section 2 – RECOMMENDED CONDITIONS OF APPROVAL Please note that these conditions are in addition to any required code provisions identified in this report. These conditions are specific to the development. 1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. Section 3 – REQUIRED CODE CORRECTIONS Planning Division, Sarah Rosenberg, srosenberg@bozeman.net, 582-2297 1. Please submit all revisions using Corrections and Revisions cover sheet. Submit a full set of drawings (2 large format and 1 11x17) with revisions clouded. Include a table of contents will all drawings and their date of creation/revision. Ensure that the electronic version includes a fully updated, complete application. 2. Phase 5, 9, and 10 need pedestrian connection to the buildings 3. Open space calculations must be based off Section 38.360.240.E, townhouse and rowhouse dwellings. Page 2 of 3 4. Section 38.400.090.C.3.2.c: Phase 5 should have landscape separation like the other phases. Advisory Notes  Elevations should be annotated Engineering Division; Anna Russell, arussell@bozeman.net, 406-582-2279  See attached comments dated May 14, 2019. Solid Waste Division; Russ Ward, rward@bozeman.net, 406-582-3235 Forestry Division; Alex Nordquest, anordquest@bozeman.net, 406-582-3205 Parks Department; Addi Jadin, ajadin@bozeman.net, 406-582-2908  As stated in the Conceptual Review comments provided in August 2017, the subject parcel was originally zoned for business use within Laurel Glen Phase 1 and there was no parkland dedication associated with this lot. Applicants must either show proof that surplus parkland exists for phases 1 and 2 of Laurel Glen Subdivision (including net lot area calculation, number of dwelling units and area of parkland within the Laurel Glen Subdivision) or provide parkland or its equivalent.  Per the park area requirements of Sec. 38.420.020, park area required is based on net density. Net density, as defined in Section 38.700.130, allows the deduction of “Street, public or private, rights-of-way and transportation easements” from the gross lot area. Based on the cash-in-lieu of parkland proposal, the Parkland Summary table on 0.0 CS Cover Sheet must be updated to provide the net residential density rather than density based on the gross lot size of the development. In addition, based on comment 1 above, cash-in-lieu of parkland must be provided up to the density cap of 10 units per acre unless a surplus is shown.  Review of the cash-in-lieu of parkland proposal requires recommendation from the Recreation and Parks Advisory Board Subdivision Review Committee at the time of Site Plan application/review. No dollar amounts should be shown on the Master Site Plan drawings because the City-approved appraisal value may be adjusted prior to final phase completion.  Assuming a balance is owed, to get a calculation of CIL of parkland owed for Phase 5, applicants may provide the net lot area to the Parks Planner and Development manager at the email above.  Review of the cash-in-lieu of parkland proposal requires recommendation from the Recreation and Parks Advisory Board Subdivision Review Committee. This will Page 3 of 3 be coordinated at the time of Site Plan application/review. NorthWestern Energy; Cammy Dooley, cammy.dooley@northwestern.com  10 foot easements are needed off the private drive. Please coordinate with Northwestern. Fire Department; Scott Mueller, smueller@bozeman.net, 406-582-2382 Water and Sewer Division; John Alston, jalston@bozeman.net, 406-582-3200 Building Division; Bob Risk, brisk@bozeman.net, 406-582-2377 Future Impact Fees - Please note that future building permit applications will require payment of the required transportation, water, sewer and fire impact fees according to the City of Bozeman adopted impact fee schedule in place at the time of building permit issuance. If you desire an estimate of the required impact fees according to current rates please contact the Department of Community Development and/or visit. Note: During preparation of the staff report, additional conditions of approval may be recommended based on comments and recommendations provided by other applicable review agencies involved with the review of the project. MEMORANDUM ------------------------------------------------------------------------------------------------------------ TO: SARAH ROSENBERG, PLANNER II FROM: ANNA RUSSELL, ENGINEER II RE: JENNIFER PLACE CONDOS PH 1-5 SITE PLAN REVIEW APPLICATION NO 19154 DATE: MAY 14, 2019 ----------------------------------------------------------------------------------------------------------- ENGINEERING COMMENTS: 1. BMC Section 38.270.030.C. The applicant will need to submit a request for concurrent construction with the Site Plan application if concurrent construction for Phase 1 and the roadway and infrastructure is planned. An Irrevocable Offer of Dedication needs to be submitted with the Concurrent Construction application. A DEQ approval letter must also be submitted. The applicant will need to submit construction phasing including access and routes to ensure no conflicts with residents and emergency vehicle access and required turnarounds during construction of subsequent phases. 2. The applicant is advised that fire service plans must be a standalone submittal, separate from the Site Plan submittal. The applicant must prepare plans and specifications for any fire service line in accordance with the City’s Fire Service Line Policy. The plans must be prepared by a Professional Engineer and be provided to and approved by the City Engineer prior to initiation of construction of the fire service or fire protection system. The applicant must also provide Professional Engineering services for construction inspection, post-construction certification and preparation of mylar record drawings. Fire service plans, and domestic services 4” or larger, must be a standalone submittal, separate from the site plan submittal. City of Bozeman applications for service must be completed by the applicant. 3. If not already filed for the subject site, the applicant must provide and file with the County Clerk and Recorder's office executed Waivers of Right to Protest Creation of Special Improvement Districts (SID’s) for the following: a. Street improvements to Annie Street including paving, curb/gutter, sidewalk, and storm drainage. b. Street improvements to Laurel Parkway including paving, curb/gutter, sidewalk, and storm drainage. c. Intersection improvements to the intersection of Annie Street and Laurel Parkway. d. Intersection improvements to the intersection of Laurel Parkway and Durston Road. e. Intersection improvements to the intersection of Laurel Parkway and Oak Street. The document filed must specify that in the event an SID is not utilized for the completion of these improvements, the developer agrees to participate in an alternate financing method for the completion of said improvements on a fair share, proportionate basis as determined by square footage of property, taxable valuation of the property, traffic contribution from the development, or a combination thereof. The applicant must provide a copy of the filed SID waiver prior to preliminary plat approval. 4. The applicant is advised that separate plans are required for water and sewer infrastructure. Sheet C1.0 Overall Site Plan 5. The utility vacation will require associated documentation (Release and Reconveyance) to be submitted. 6. Limit the amount of construction traffic on Loxley Drive. Construction vehicles will need to go north on Laurel Parkway, through the roundabout, south on Laurel Parkway, and turn right into the site. This should be considered with subsequent phasing plans. 7. Remove the pork chop divider from the private drive access at Annie Street. Based on the turning movements of the fire and garbage trucks and the requirement for a cut through it for pedestrian access, the pork chop becomes a traffic hindrance. Add a no left turn sign on the east side of the private drive access and Annie Street. Add a no left turn sign on the north side of Annie Street before the private drive access. The deviation request is no longer necessary. 8. Due to the narrow drive aisle width, no parking will be allowed on both sides of the street to allow for emergency vehicle access. The applicant must include a fire lane on both sides of the street with appropriate signage. Sheet C2.0 Grading and Drainage 9. Add “Utility” to the name of the sheet. 10. Make a note of the water main tee in Annie Street to connect the proposed water main to the existing water main. 11. Provide an easement for the 8” water main stub off Laurel Parkway ten feet around the end of the stub on private property. 12. Place the curb boxes for the 1” water services off the 8” main on Laurel Parkway the same distance from the main to allow for ease of locating. Place them as close to the ROW line as possible. 13. Make a note of the new sewer main manhole on Annie Street. 14. Make a note of the water main tee in Laurel Parkway to connect the proposed water main to the existing water main. 15. Add a 10 foot front utility easement for private utilities along both side of the Private Access Road. Sheet C3.0 Details 16. Detail 1 – Show the existing sewer line location and proposed manhole. 17. Detail 1 – Include a note to replace any striping as necessary in the sawcut area. Sanitary Sewer Lift Station Analysis 18. The included Allied Engineering 2002 Lift Station Design Report Exhibit is difficult to decipher. Reference the Sewer Zone number in the Analysis from the Exhibit and highlight the exhibit to clearly define the proposed lot. 19. Although the 2002 Lift Station Design Report estimates the area of Lot 1, Block 9 to be 3.03 acres, the area is now 2.04 acres per tax records. Include in the report whether this reduction in area is due to street networks or a further dividing of the lot. If the reduction in lot area is due to further dividing of the lot and not street networks, the gallons per acre needs to be modified in this analysis (2.04*3,495 instead of 3.03*3,495). 20. The inclusion of the 2018 Rosa Parks sewer analysis does not appear to serve a purpose. This parcel was not included in that analysis and any excess capacity was allocated to different subdivisions based on the analysis. If there is a relevant section to this proposed design flow, highlight it, if not, remove it. Stormwater Management Plan 21. The Plan cannot include any reference to post construction maintenance. Remove this section. The described maintenance would be a redesign of the pond and would require a licensed engineer to modify which cannot be done by the owner and would not be considered maintenance. Stormwater Design Report 22. In the Existing Stormwater Design section, include the explanation that the C value of 0.68 generates 2,992 cf of runoff based on the area (include the actual area) of the proposed phases 1-5. The statement that “no storage is required on site” only applies to phases these specific phases. 23. Include the volume of stormwater runoff originally allocated for the lot. Provide supporting documentation. 24. The Engineer is proposing stormwater facilities in locations known to have a high groundwater table. The Stormwater Division recommends that the Engineer confirm that groundwater will not impact the function or maintenance of the facilities by completing a geotechnical analysis and seasonal high groundwater study. 25. The Engineer is proposing to discharge stormwater from the proposed development into an unmaintained stormwater facility. The Stormwater Division recommends that the Engineer coordinate maintenance with the Subdivision’s Home Owner Association to avoid flooding and environmental quality impacts. 26. The Montana Post-Construction Storm Water BMP Design Guidance Manual (Manual) outlines environmental, design, construction, and maintenance considerations related to stormwater infiltration basins (Section 5.2). The Manual is available at www.bozeman.net/stormwater. At a minimum, the Stormwater Division recommends that the Engineer consider the following: a. Contributing Drainage Area b. Soil Characteristics c. Depth to Groundwater d. Site Topography e. Land Use and Considerations of Surrounding Area f. Community and Environmental Considerations g. Design Components: h. Infiltration Cell Volume i. Inlet and Conveyance j. Pretreatment Forebay k. Infiltration Cell Shape l. Infiltration Cell Bottom m. Outlet Structure (Optional) n. Embankment and Overflow Spillway o. Maintenance Access p. Flood Control q. Vegetation r. Construction Considerations s. Maintenance