Loading...
HomeMy WebLinkAbout3.0 C3.0 Details 2020.08.19 SIDEWALK BOULEVARD ROLLOVER CURB PER DETAIL 7/C3.0 ROLLOVER CURB PER DETAIL 7/C3.0 28.2'PAVEMENT WIDTH VARIES- --.5'TYP— 1.5%SLOPE ——— PROPERTY _ NE 3"MIN GRAVEL BASE POND WIDTH VARIES -------- ____________ _ I 4"THICK M-4000 CONCRETE Sheet 5 Of 5 COMPACTED SUBGRADE 3 ASPHALT MAINTAIN SECTION B WOVEN GEOTEXTILE(MIRAFI "MINUS GRANULAR FILL PROPER 500%OR APPROVED EQUAL) 6"MINUS BASE GRAVEL SIDEYARD m E TOP OF POND:PER PLAN(C2.1) INSTALL R COMMENDATIONCHNICAL SETBACK PER ENGINEERS RECOMMENDATION ZONING q, DEPTH VARIES: 1.5'MAX POND DEPTH REGULATIONS TRANSITION SECTION FROM c Aw.. &MAX WATER STORAGE DEPTH SVOQE ASPHALT CROSS-SECTION I 3 M EXISTING CURB TO DROP CURB: �' a L `S<OA ,Mp'F C3.0 SCALE:NTS 7 V. FINISH GRADE WITH 6" • ` TOPSOIL AND SEED TJ In m BOTTOM OF POND I C � o -----EXPANSION JOINTS MWND SIDEW SECTIOON 0)9 N H APPROXIMATELY DRIVEWAY THROAT WIDTH 3.-4. O O O �,\ 24'MA%. m L OVER-EXCAVATE BOTTOM OF RETENTION PONDS DOWN TO NATIVE GRAVEL LAYER(APPROXIMATELY 3'-4'BELOW C EXISTING GRADE)AND BACKFILL WITH WELL DRAINING CURB&APRON POURED MONOLITHIC GRAVEL 2%SLOPE AWAY FROM BUILDING UNLESS OTHERWISE APPROVED BOTTOM WIDTH PER PLAN ESTIMATED SEASONAL HIGH GW I W o a ELEVATION IS AT THE TOP OF 6'THICK REINFORCED P.C.0 SIDEWALK CONTRACTION JOINT p p THE NATIVE GRAVEL LAYER 4 V m a MIN.4"OF'I"CRUSHED AGGREGATE BASE-COMPACTED EXPANSION JOINTS AT CURB RETURNS 1 O\MC.�TE/D SIB-GRADE y� y' ( /�/����/��I �/1 - :' :�'XX,✓XX�✓XX✓;;;;, y;;;;,y;;;� y;;;�,' SIDEWALK CONTRACTION JOINTS j I BACK OF CURB V_^ DEPTH SPACED1°.T EXPANSIONINTERVALS JOINTSMIN. FLOW ONE N TO BE PLACED AT 25' I EDGE OF GUTTER NATIVE GRAVEL LAYER NOTES: INTERVALS, p 1. CONCRETE DEPTH FOR STD. SIDEWALKS SHALL BE 6" VARIABLE MIN. WITH APPROVED REINFORCEMENT. SIDEWALKS CAN a I (5.5'TYP.) � BE 4" THICK WHERE NOT SUBJECT TO VEHICULAR TRAVEL CONTRACTION JOINTS TO BE SPACED / 1 RETENTION POND SECTION 2. SIDEWALKS SHALL SLOPE AWAY FROM STRUCTURES AND AT 10'INTERVALS IN CURB&GUTTER ll C3.0 BUILDINGS AT 2%. SCALE:TUTS 3. CONCRETE SHALL BE 4,000 PSI 0 28 DAYS. 4. CONTRACTION JOINTS SHALL BE PLACED AT 5' INTERVALS, EXPANSION JOINT MATERIAL SHALL BE 1/2" THICK PRE—FORMED BITUMINOUS TREATED FIBERBOARD FILLER. EXPANSION JOINTS AT 20' INTERVALS. ALL CURB REPLACEMENT SHALL BE DONE WITH INTEGRAL CURB AND GUTTER UNLESS OTHERWISE APPROVED. W GRADE ESTABLISHED AS 1/4" RISE PER FOOT FROM TOP OF ADJACENT FULL HEIGHT CURB R MATCH EXISTING SIDEWALK GRADE T--1 / l SIDEWALK CROSS-SECTION SIDEWALK DRIVEWAY 5.5' TYP. C3.0 SCALE:NTS 1 5 (VARIES) 1/4" PER FOOT SLOPE STREET SURFACE w z J W0.0.0...'.0 IL 0 w WASHED ROCK o_ CURB & GUTTER 3" MIN. IN. 6"THICK M-4000 CONCRETE * OR MATCH EXISTING OR REQUIRED SIDEWALK WIDTH SECTION A W 4 DRIVE APPROACH DETAIL C3.O SCALE:TUTS a � z 12" O o 30 CUBIC YARD DUMPSTER W/ COVERED ROLL-OFF TOP /2"R O 5 CONSTRUCTION DUMSPTER DETAIL 8 V A C3.0 SCALE:NTS WW u? TOP n r ` n� SOIL __ v S. 9 1DEPRESS CURB TO THIS BACK OF CURBLINE FOR CURB DROP h I /AVJ-- 14 FLOWLINE EXPANSION JOINT O O O O O O CRUSHED GRAVEL 000000000000000000000000000000000000 6. O O O O O O O O O O O O O O O O BASE 3"MIN 0000 oo'o'00000' ' 000000000000000000000 5'SIDEWALK o 0 0 0 0 0 0000 0 0 0 0 0 0 0 41FCO STYLES(SOLID COVER)TRENCH GRATING A WITH STYLE B FRAME, D& L FOUNDRY"J SERIES" WITH SOLID, BOLT DOWN COVERS, (OR APPROVED EQUAL) SUBS BASE GORSE 4"SIDEWALK W 2 1/ 2" AS REQUIRED 10' 6,. h 6., EXPANSION JOINT COMPACTED SUBGRADE NOTES: DROP 6" 1. SUBGRADE OR BASE COURSE COMPACTION SHALL CONFORM TO SECTION 02230 (M.P.W. SPECS., 1996 ED.) CONCRETE CHANNEL I CURB BASE COURSE 2. CONTRACTION JOINS SHALL BE PLACED AT 10' INTERVALS AND SHALL HAVE A MINIMUM DEPTH OF 3/4"AND EJ HEAD MINIMUM WIDTH OF 1/8". IFCO STYLES(SOLID 3. 1/2"EXPANSION JOINT MATERIAL SHALL BE PLACED AT ALL P.C.S, P.T.S. CURB RETURNS AND AT NOT MORE THAN ....................................... ......................... COVER)TRENCH GRATING EXPANSION ''' ''''''' 300' INTERVALS. THE EXPANSION MATERIAL SHALL EXTEND THROUGH THE FULL DEPTH OF THE CURB AND GUTTER. WITH STYLE B FRAME,D JOINS 4. NO CURB AND GUTTER SHALL BE PLACED WITHOUT A FINAL FORM INSPECTION BY THE CITY ENGINEER OR HIS &L FOUNDRY"J COVERS MUST BOLT DOWN TO FRAME REPRESENTATIVE. SERIES" WITH SOLID, NORMAL CONCRETE GUTTER LINE 4"MIN. CONCRETE SHALL BE M-4000 5. CONCRETE SHALL BE CLASS M-4000. BOLT DOWN COVERS,(OR PLAN VIEW - N.T.S. (OUTLET CHASE ONLY) SECTION VIEW - N.T.S. 6 ANDCRUSHED GRAVEL BASE SHALL GUTTER REPLACEMENT PROJECTS,SEEr TWASHEDHE DIROCKNTS OF MAY BESUSEIDNFOR235 THE(MPW GRAVEL SPECS, ED.) FOR CURB Issue Date: 08/19/2020 APPROVED EQUAL) 7 CURB CHASE DETAIL ROLLOVER CURB DETAIL C3mO C3.0 SCALE:NTS C3.0 SCALE:NTS COB DETAIL 02529-14 #190065