HomeMy WebLinkAbout13.2 Phase 2 Color Palette 2019.04.09 COLOR PALETTE
PHASE 2
JENNIFER PLACE CONDOMINIUMS
EXTERIOR KEY SYMBOL: A EXTERIOR KEY SYMBOL: B & D EXTERIOR KEY SYMBOL: C EXTERIOR KEY SYMBOL: E EXTERIOR KEY SYMBOL: F
EXTERIOR KEY SYMBOL: G EXTERIOR KEY SYMBOL: H WINDOW FRAMES
Engineering and Surveying Inc.
1091 Stoneridge Drive•Bozeman, MT 59718
Phone(406)587-1115•Fax(406)587-9768
www.chengineers.com•info@chengineers.com Sheet > of 1 #190065