Loading...
HomeMy WebLinkAbout0.0 Response to DRC Comments - 2020.08.19 1091 Stoneridge Drive • Bozeman, Montana • Phone (406) 587-1115 • Fax (406) 587-9768 www.chengineers.com • E-Mail: info@chengineers.com Civil/Structural Engineering and Surveying August 19, 2020 Sarah Rosenberg City of Bozeman Planning Department 20 E. Olive Street Bozeman, MT 59718 RE: Response to DRC Comments – Jennifer Place Condominiums Site Plan & MSP Applications (#19153 & #19154) Dear Ms. Rosenberg: This letter is to provide a narrative response to the DRC comments from July 8, 2019. All responses are shown in bold: Recommended Conditions of Approval Please note that these conditions are in addition to any required code provisions identified in this report. These conditions are specific to the development. 1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. • The applicant acknowledges this condition. 2. The Recorded Land Use Notice form will be required to be signed, recorded, and returned prior to building permit submittal. (Will be provided upon Director Determination with the staff report) • The applicant acknowledges this condition. 3. All easements need to be recorded prior to Site Plan approval. • All easements have been provided. Executed copies of the easements are included in this resubmittal. 4. The SID waiver needs to be recorded prior to Site Plan approval. Civil/Structural Engineering and Surveying • A copy of the recorded SID waiver is included in this submittal. The document number is 2691639. Engineering Division, Anna Russel, arussel@bozeman.net, (406) 582-2279 1. All easements need to be recorded prior to Site Plan approval. • The necessary documents have been executed by the owner. The documents will need to go to the consent agenda to be filed. 2. Call out the new sewer main manhole on Annie Street on Sheet C2.0. • The new sewer manhole has been called out on C2.0 for the Master Site Plan and Phase 1. 3. The Public Utility Easement must be a minimum of 30 feet wide. The 10 foot private utility easement on the sidewalk side of the drive access can be removed to accommodate the public utility easement width. Update on Sheet C2.0 as well. The infrastructure plans and sheet C2.0 still shows 25’. Sheet C1.0 show a 30’ easement but it overlaps with the 10’ private utility easements. • The Public Utility easement is now shown as 30 feet wide. The adjacent private utility easement has been removed and the utilities will run in the existing easement along the property boundary. 4. The removal of the 10 foot easement to accommodate a 30’ public Utility easement on the south side needs to be coordinated with NWE. • The utility location has been coordinated with Cammy at NEW. The utilities will run in the existing 12’ utility easement around the property. A portion of the easement will be released and reconvayed per the submitted document. 5. On the easement, the names of the signatures of the city clerk and city manager need to be adjusted. The City Manager is Jeff Mihelich and the City Clerk is Mike Maas. • The documents have been updated with the appropriate names and dates. Parks Division, Addi Jadin, ajadin@bozeman.net, (406) 582-2908 1. The dollar amount needs to change to $1.60. Update cover sheet to reflect changes. • The cover sheet has been updated to include the attached CIL Parkland memo. 2. CIL must be paid for prior to site plan approval. Civil/Structural Engineering and Surveying • The CILP was paid on August 17, 2020 receipt number 24745. If you require any further information, please give me a call at (406) 587-1115. Sincerely, Luke Stein, E.I.