Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
100% Irrigation Detail Sheets 9.2.2020
375 E. Horsetooth Road, Building 2-202Fort Collins, CO 80525-3196970.229.9668www.aquaengineering.comSheet Number:Project Number:Project: Client:1603 Oakridge DriveFort Collins, CO 80525p. (970) 223-7577www.BHADesign.comLandscape ArchitectureUrban DesignMaster PlanningO:\BHA\BILLINGS_CLINIC\P-BILLINGS.DWGPlot Date:9/2/2020 3:29 PM Plotted By: Jason H. KlausnerDate Created:9/2/2020 Produced by:Date:Revision:IR3.0Date:BID DOCUMENTS BILLINGS CLINIC BOZEMAN Ambulatory Destination Center - Phase I Billings Clinic 2800 10th Avenue North Billings, MT 59101 IRRIGATION PLAN JHK09-04-20202017100% BID DOCUMENTS 1MANUAL DRAINASSEMBLYN.T.S.NOTES:1. SLEEVE TO BE SET SQUARE OVER GATE VALVE TOALLOW FOR OPERATION OF VALVE WITHOUT BINDING.2. FURNISH APPROPRIATE HANDLE AND KEY TO MATCHGATE VALVE.ABCDEFGHIJKLMA.FINISH GRADE/TOP OF MULCHB.10" ROUND VALVE BOX WITH COVERC.4" PVC CL 200 PIPE (LENGTH AS REQUIRED)D.6" MINIMUM DEPTH OF 3/4" WASHED GRAVELE.BRICK (1 OF 4)F.TEE OR EL ON LATERAL PIPEG.PVC SCH 40 PIPE (LENGTH AS REQUIRED)H.PVC SCH 80 TOE NIPPLE (LENGTH AS REQUIRED)I.1" THREADED BRONZE GATE VALVE WITH CROSSHANDLE, SOLID WEDGEJ.PVC SCH 80 TOE NIPPLE (4" LENGTH)K.PVC SCH 80 EL (1 OF 2)L.PVC SCH 40 PIPE (4" LENGTH)M.SUMP OF 3 CUBIC FEET OF 3/4" WASHED GRAVEL2ISOLATION GATE VALVEASSEMBLYN.T.S.NOTE:1. NOMINAL SIZE OF GATE VALVE TO MATCH NOMINAL MAINLINE SIZE.ABCDEFGHIA.FINISH GRADE/TOP OF MULCHB.10" ROUND VALVE BOX WITH COVERC.6" PVC CL 200 PIPE (LENGTH AS REQUIRED)D.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELE.BRICK (1 OF 2)F.THREADED BRONZE GATE VALVE WITH SOLIDWEDGE, NON-RISING STEMG.PVC MAINLINEH.PVC SCH 40 MALE ADAPTER (1 OF 2)I.TRACING WIRE3MASTER VALVEASSEMBLYN.T.S.NOTES:1. USE VALVE BOX EXTENSION AS NECESSARY TO ACHIEVE MINIMUM DIMENSIONS ABOVE ASSEMBLY.2. NOMINAL SIZE OF ALL COMPONENTS ARE TO BE THE SAME NOMINAL SIZE AS THE SOLENOID VALVE(SIZED AS SHOWN).3. INSTALL FILTER FABRIC AROUND EXTERIOR OF VALVE BOX. USE DUCT TAPE TO SECURE FABRIC TOPIPE AND VALVE BOX.4. DO NOT CUT OUT ENDS OF VALVE BOX UNNECESSARILY.5. POSITION VALVE BOX OVER VALVE TO ALLOW ACCESS TO SOLENOID.6. INSTALL SO THAT NO GRAVEL IS IN CONTACT WITH VALVE ASSEMBLY.ABCDEFGHIJKLA.TRACING WIREB.FINISH GRADE/TOP OF MULCHC.STANDARD RECTANGULAR VALVEBOX W/ EXTENSIOND.WIRE SPLICE, TYPICALE.DECODERF.SOLENOID VALVEG.TWO-WIRE CABLEH.PVC MAINLINEI.BRICK (1 OF 4)J.FILTER FABRICK.3" MINIMUM DEPTH OF 3/4"WASHED GRAVELL.PVC SCH 40 MALE ADAPTERLM4FLOW SENSORASSEMBLYN.T.S.ABCDEFGHIJKA.TRACING WIREB.12" VALVE BOX WITH COVERC.FINISH GRADE/TOP OF MULCHD.SENSOR DECODERE.WIRE SLICE, TYPICALF.FLOW SENSORG.TWO WIRE CABLEH.FILTER FABRICI.PVC PIPEJ.BRICK (1 OF 4)K.3" MINIMUM DEPTH OF 3/4"WASHED GRAVELNOTES:1. ALLOW 10 PIPE DIAMETERS UPSTREAM AND 5 PIPE DIAMETERS DOWNSTREAM OFSTRAIGHT RUN OF PIPE TO ACHIEVE PROPER FLOW REGIME.2. INSTALL FILTER FABRIC AROUND EXTERIOR OF VALVE BOX. USE DUCT TAPE TOSECURE FABRIC TO PIPE AND VALVE BOX.3. DO NOT CUT OUT ENDS OF VALVE BOX UNNECESSARILY.4. INSTALL SO THAT GRAVEL IS ONLY IN CONTACT WITH BOTTOM OF SENSOR ASSEMBLY.F5BLOW OUTASSEMBLYN.T.S.NOTE:1. FURNISH NOMINAL PIPE AND FITTING SIZES IDENTICAL WITH NOMINALTAP SIZE UNLESS OTHERWISE NOTED.ABCDEFGHIJKLKA.12" STANDARD VALVE BOX WITHCOVERB.FINISH GRADE/TOP OF MULCHC.1" BRONZE BALL VALVE FEMALETHREADED ENDSD.1" COPPER MALE ADAPTERE.1" COPPER PIPE (LENGTH ASREQUIRED)F.3" MIN. DEPTH OF 3/4" WASHEDGRAVELG.BRICK (1 OF 4)H.COPPER FEMALE THREADEDADAPTERI.SCH. 40 PVC MALE THREADEDADAPTERJ.PVC MAINLINEK.COPPER PIPEL.COPPER TEEHIJB6QUICK COUPLING VALVEASSEMBLYN.T.S.ABCDEFGHIA.FINISH GRADE/TOP OF MULCHB.QUICK-COUPLING VALVEC.10" ROUND VALVE BOX WITH COVERD.HARCO QUICK COUPLER ANCHORE.PVC SCH 80 TOE NIPPLE (LENGTH ASREQUIRED)F.BRICK (1 OF 2)G.PRE-FABRICATED UNITIZED SWING JOINT 1"MIPT INLET X SOC OUTLETH.TEE OR EL: SEE SPECIFICATIONS FORMATERIALSI.PVC MAINLINE PIPEJ.TRACING WIRENOTES:1. FURNISH FITTINGS AND PIPING NOMINALLY SIZED IDENTICAL TO NOMINAL QUICKCOUPLING VALVE INLET SIZE.2. INSTALLATION HEIGHT OF QUICK COUPLER VALVE IN VALVE BOX MUST ASSURE PROPEROPERATION OF QUICK COUPLER KEY.3. INSTALL SWING JOINT LAY ARM BETWEEN 30° AND 45° OF LATERAL PIPE IN ORDER TOABSORB DOWNWARD IMPACT.JQ 375 E. Horsetooth Road, Building 2-202Fort Collins, CO 80525-3196970.229.9668www.aquaengineering.comSheet Number:Project Number:Project: Client:1603 Oakridge DriveFort Collins, CO 80525p. (970) 223-7577www.BHADesign.comLandscape ArchitectureUrban DesignMaster PlanningO:\BHA\BILLINGS_CLINIC\P-BILLINGS.DWGPlot Date:9/2/2020 3:29 PM Plotted By: Jason H. KlausnerDate Created:9/2/2020 Produced by:Date:Revision:IR3.1Date:BID DOCUMENTS BILLINGS CLINIC BOZEMAN Ambulatory Destination Center - Phase I Billings Clinic 2800 10th Avenue North Billings, MT 59101 IRRIGATION PLAN JHK09-04-20202017100% BID DOCUMENTS 1REMOTE CONTROL VALVEASSEMBLYN.T.S.2POP-UP SPRAY SPRINKLERASSEMBLYN.T.S.3POP-UP ROTOR SPRINKLERASSEMBLYN.T.S.4POP-UP BUBBLERASSEMBLYN.T.S.5DRIP REMOTE CONTROL VALVEASSEMBLYN.T.S.6ZONE CONTROL VALVEASSEMBLYN.T.S.NOTES:1. USE VALVE BOX EXTENSION AS NECESSARY TO ACHIEVE MINIMUM DIMENSIONS ABOVE ASSEMBLY.2. NOMINAL SIZE OF ALL COMPONENTS ARE TO BE THE SAME NOMINAL SIZE AS THE SOLENOID VALVE(SIZED AS SHOWN).3. INSTALL FILTER FABRIC AROUND EXTERIOR OF VALVE BOX. USE DUCT TAPE TO SECURE FABRIC TOPIPE AND VALVE BOX.4. TRANSITION TO PROPER LATERAL PIPE BURIAL DEPTH USING 45° ELBOW FITTINGS DOWNSTREAMOF REMOTE CONTROL VALVE ASSEMBLY.5. DO NOT CUT OUT ENDS OF VALVE BOX UNNECESSARILY.6. POSITION VALVE BOX OVER VALVE TO ALLOW ACCESS TO SOLENOID AND PROPER OPERATION OFBALL VALVE.7. COIL 3-FEET OF WIRE FOR EACH DECODER FOR SERVICE PURPOSES.ABCDEFGIKLMNOPQRSTUVJHA.DECODERB.WIRE FROM DECODER TO VALVE SEE SPECIFICATIONSC.PVC BALL VALVED.REMOTE CONTROL VALVEE.WIRE CONNECTOR FROM TWO-WIRE CABLE TODECODER (1 OF 2)F.CHRISTY ID TAGG.FINISH GRADEH.PVC SCH 80 CLOSE NIPPLEI.WIRE CONNECTOR FROM DECODER TO SOLENOIDVALVE (1 OF 2)J.PVC SCH 40 MALE ADAPTERK.12" STANDARD VALVE BOX WITH COVERL.PVC LATERAL PIPEM.FILTER FABRICN.PVC SCH 80 TOE NIPPLE (LENGTH AS REQUIRED)O.PVC SCH 40 ELP.PVC SCH 40 PIPE (LENGTH AS REQUIRED)Q.BRICK (1 OF 4)R.PVC MAINLINES.TWO-WIRE CABLET.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELU.TEE OR EL: SEE SPECIFICATIONS FOR MATERIALSV.PVC SCH 80 TOE NIPPLE (LENGTH AS REQUIRED,HIDDEN) AND PVC SCH 40 ELABCDEFA.FINISH GRADE/TOP OF MULCHB.POP-UP SPRAY SPRINKLERC.SWING PIPE, 12" LENGTHD.1/2" MALE NPT x BARB ELE.PVC SCH 40 TEE OR ELF.PVC LATERAL PIPEDSEE NOTE #1NOTE:1. INSTALL SWING JOINT LAY ARM BETWEEN 30° AND 45° OF LATERAL PIPE TO ABSORBDOWNWARD IMPACT.ABCDEA.FINISH GRADEB.POP-UP ROTOR SPRINKLERC.PRE-FABRICATED PVC SWING JOINTMIPT INLET x MIPT OUTLETD.PVC LATERAL PIPEE.PVC SCH 40 TEE OR ELROOT BALLABCDEFGHIA.WATER BASINB.STREAM BUBBLERC.FINISH GRADED.POP-UP SPRAY SPRINKLER W/ BUBBLERE.1/2" MALE NPT x 0.490" BARB ELF.SWING PIPE, 12" LENGTHG.1/2" MALE NPT x 0.49" BARB ELH.PVC LATERAL PIPEI.PVC SCH. 40 TEE OR ELABCDEFHQKLMNOPQRSTIGJA.PRESSURE REGULATING FILTERB.WIRE FROM DECODER TO VALVE SEESPECIFICATIONSC.DECODERD.WIRE CONNECTOR FROM TWO-WIRE CABLETO DECODER (1 OF 2)E.CHRISTY I.D. TAGF.JUMBO VALVE BOX WITH COVERG.PVC BALL VALVEH.FINISH GRADE/TOP OF MULCHI.PVC SCH 80 NIPPLEJ.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELK.REMOTE CONTROL VALVEL.PVC SCH 80 TOE NIPPLEM.PVC SCH 40 ELN.PVC SCH 40 PIPE (TYPICAL) (LENGTH ASREQUIRED)O.FILTER FABRICP.BRICK (1 OF 4)Q.MANIFOLD/DRIP LATERAL. SEE NOTE 8.R.TWO-WIRE CABLES.TEE OR EL: SEE SPECIFICATIONS FORMATERIALST.PVC SCH 80 TOE NIPPLE (LENGTH ASREQUIRED, HIDDEN) AND PVC SCH 40 ELNOTES:1. USE VALVE BOX EXTENSION AS NECESSARY TO ACHIEVE MINIMUM DIMENSIONS ABOVE ASSEMBLY.2. NOMINAL SIZE OF ALL COMPONENTS ARE TO BE THE SAME NOMINAL SIZE AS THE SOLENOID VALVE(SIZED AS SHOWN).3. INSTALL FILTER FABRIC AROUND EXTERIOR OF VALVE BOX. USE DUCT TAPE TO SECURE FABRICTO PIPE AND VALVE BOX.4. TRANSITION TO PROPER LATERAL PIPE BURIAL DEPTH USING 45° ELBOW FITTINGS DOWNSTREAMOF REMOTE CONTROL VALVE ASSEMBLY.5. DO NOT CUT OUT ENDS OF VALVE BOX UNNECESSARILY.6. POSITION VALVE BOX OVER VALVE TO ALLOW ACCESS TO SOLENOID, AND PROPER OPERATION OFBALL VALVE.7. COIL 3-FEET OF WIRE FOR EACH DECODER FOR SERVICE PURPOSES.8. IN CASES OF DIRECT DRIP LATERAL PIPE CONNECTION INSTALL SCH. 40 PVC BARB FITTING TOPRESSURE REGULATING BASKET. SECURE CONNECTION WITH STAINLESS STEEL PINCH CLAMPS.9. SEE DECODER GROUNDING SCHEMATIC FOR ADDITIONAL DECODER GROUNDING INFORMATION.ABCDEFGHIJKLMNOA.6" ROUND VALVE BOX WITH COVERB.FINISH GRADE/TOP OF MULCHC.PVC SCH. 40 ELD.PVC BALL VALVEE.PVC SCH. 40 TRANSITION NIPPLE (MIPTxMHT)F.COMPRESSIONxFEMALE HOSE SWIVEL ADAPTERG.DRIP LATERAL PIPINGH.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELI.BRICK (1 OF 2)J.PVC SCH 80 NIPPLE (LENGTH AS REQUIRED, 1 OF 2)K.PVC SCH 40 ELL.PVC SCH 40 STREET EL (1 OF 2)M.PVC DRIP MANIFOLD PIPEN.PVC SCH 40 TEE OR ELO.PVC SCH 80 NIPPLE (LENGTH AS REQUIRED) 375 E. Horsetooth Road, Building 2-202Fort Collins, CO 80525-3196970.229.9668www.aquaengineering.comSheet Number:Project Number:Project: Client:1603 Oakridge DriveFort Collins, CO 80525p. (970) 223-7577www.BHADesign.comLandscape ArchitectureUrban DesignMaster PlanningO:\BHA\BILLINGS_CLINIC\P-BILLINGS.DWGPlot Date:9/2/2020 3:29 PM Plotted By: Jason H. KlausnerDate Created:9/2/2020 Produced by:Date:Revision:IR3.2Date:BID DOCUMENTS BILLINGS CLINIC BOZEMAN Ambulatory Destination Center - Phase I Billings Clinic 2800 10th Avenue North Billings, MT 59101 IRRIGATION PLAN JHK09-04-20202017100% BID DOCUMENTS 1TYPICAL DRIP LAYOUTN.T.S.2FLUSH CAPASSEMBLYN.T.S.3WIRE SPLICE DETAILN.T.S.4CONTROLLERASSEMBLYN.T.S.5CONTROLLER GROUNDINGDETAILN.T.S.6TWO WIRE GROUNDINGSCHEMATICN.T.S.XXXXXXXXXXXXXXXXXXXXXXXXNOTES:1. EMITTERS SHALL BE LOCATED IMMEDIATELY ADJACENT TO PERENNIALS AND ATTHE OUTSIDE PERIMETER OF THE PLANTING PIT OF ALL SHRUBS AND TREES.2. INSTALL FOUR 1 GPH EMITTERS PER DECIDUOUS TREE.3. INSTALL THREE 1 GPH EMITTER PER CONIFEROUS TREE.4. INSTALL TWO 1 GPH EMITTER PER SHRUB.5. INSTALL ONE 1 GPH EMITTER PER PERENNIAL.ABCDEFA.DRIP LATERAL PIPEB.CONIFEROUS TREEC.DECIDUOUS TREED.EMITTERE.SHRUBF.PERENNIALNOTE:1. INSTALL FLUSH CAP ASSEMBLY AT THE END OF EACHDRIP LATERAL SEGMENT.ABCDEFA.FINISH GRADE/TOP OF MULCHB.6" ROUND VALVE BOX WITH COVERC.FLUSH CAP WITH HOSE THREAD CAPD.DRIP IRRIGATION LATERALE.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELF.BRICK (1 OF 2)1.2.3.4.1/2"5.NOTE:1. VISUALLY CHECK THAT CONNECTOR IS BELOW LOCKING "FINGERS".1. STRIP ENDS OF WIRE2. SECURE WIRES INTO WIRE NUT3. INSERT WIRE NUT INTO GEL-FILLED TUBE4. POSITION WIRES INTO CHANNELS5. CLOSE SPLICE KIT FOR SECURED SEALABCDEFGHA.IRRIGATION CONTROLLER ASSEMBLYB.RAIN SENSOR (HUNTER MINI CLIK) WITH VITSTRONG BOX VANDAL GUARDC.FINISH GRADED.STRONG BOX QUICK PAD FILLED WITHGRAVELE.COMPACTED SUBGRADEF.3" SCH 40 ELECTRICAL CONDUIT AND SWEEPEL FOR TWO WIRE CABLEG.1" SCH 40 ELECTRICAL CONDUIT AND SWEEPEL FOR ELECTRICAL GROUNDINGH.1" SCH 40 ELECTRICAL CONDUIT AND SWEEPEL FOR ELECTRICAL SERVICEAA.TWO-WIRE CABLEB.VALVE BOX (10" ROUND OR AS NECESSARY)C.REMOTE CONTROL VALVED.5/8" X 8' U.L. LISTED GROUND RODE.DECODERF.LINE SURGE PROTECTORG.BARE AWG #10 COPPER WIREH.3M DBR/Y-6 CONNECTIONI.BARE COPPER CONNECTION ("CADWELD")J.REMOTE CONTROL VALVE ASSEMBLY500' MAX OR 5 DECODERSBETWEEN GROUND POINTSWHICHEVER IS FIRSTGROUND ALL DEAD ENDS25' AND LONGERSPHERE OF INFLUENCEWIRE PATHOUTSIDE SPHEREOF INFLUENCE(10' MIN.)GROUND TWO WIRE CABLE NEARCONTROLLER PER MANUFACTURER'SGUIDELINESNOTES:1. ALL WIRE CONNECTION SHALL BE MADE WITH APPROVED CONNECTORS.2. MAKE ALL WIRE SPLICES IN VALVE BOXES.3. LEAVE A MINIMUM OF 5' EXTRA WIRE AT ALL SPLICE POINTS.4. TEST EARTH TO GROUND RESISTANCE AT ALL GROUND POINTS.5. EARTH TO GROUND RESISTANCE MUST MEET OR EXCEED MANUFACTURER REQUIREMENTS.6. INSTALL ALL GROUND ASSEMBLIES IN VALVE BOXES.7. INSTALL GROUNDING EQUIPMENT AS INDICATED ON THE IRRIGATION DOCUMENTS AND ASRECOMMENDED BY THE MANUFACTURER.CDAJBEGHFIBPLAN VIEWA.IRRIGATION CONTROLLER ASSEMBLYB.UL LISTED 5/8" X 10' COPPER-CLADGROUNDING RODC.UL LISTED 4" X 8' COPPER GROUNDING PLATED.10" ROUND VALVE BOX WITH COVERE.BRONZE GROUND ROD CLAMP OR CADWELDCONNECTION: PAIGE ELECTRICF.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELG.BRICK (1 OF 4)H.#6 AWG INSULATED SOLID COPPER WIRE. NOSHARP BENDS.I.SPHERE OF INFLUENCEJ.EARTH CONTACT MATERIAL, POWERSET©ORPOWERFILL© DEPENDING ON SOIL CONDITIONSK.FINISH GRADEACB8'10'11'II30" MINIMUM12"SECTION VIEWHHHBCJDGFENOTES:1.CONNECT ALL #6 AWG WIRES INSIDE THECONTROLLER. CONNECT ONE WIRE TOTHE CONTROLLER GROUND LUG ANDUSE A #4 SPLIT BOLT TO CONNECT ALLWIRES TOGETHER.2.EARTH CONTACT MATERIAL MUSTCOMPLETELY COVER THE WELD JOINTON THE GROUND PLATE.K 375 E. Horsetooth Road, Building 2-202Fort Collins, CO 80525-3196970.229.9668www.aquaengineering.comSheet Number:Project Number:Project: Client:1603 Oakridge DriveFort Collins, CO 80525p. (970) 223-7577www.BHADesign.comLandscape ArchitectureUrban DesignMaster PlanningO:\BHA\BILLINGS_CLINIC\P-BILLINGS.DWGPlot Date:9/2/2020 3:29 PM Plotted By: Jason H. KlausnerDate Created:9/2/2020 Produced by:Date:Revision:IR3.3Date:BID DOCUMENTS BILLINGS CLINIC BOZEMAN Ambulatory Destination Center - Phase I Billings Clinic 2800 10th Avenue North Billings, MT 59101 IRRIGATION PLAN JHK09-04-20202017100% BID DOCUMENTS 1TRENCH DETAILN.T.S.2SLEEVEDETAILN.T.S.3TRACING WIREDETAILN.T.S.NOTE:1. REFER TO IRRIGATION SPECIFICATIONS FOR COVERAGEDEPTH TO BURIED PIPE AND WIRE.ABCDEFGA.WARNING TAPEB.FINISH GRADEC.BACKFILLD.LATERAL/MANIFOLD PIPEE.TWO-WIRE CABLEF.MAINLINE PIPEG.TRACING WIREREFER TOSPECIFICATIONSREFER TOSPECIFICATIONS12" MINIMUMNOTE:1. INSTALL SLEEVE SO THAT ITS LOWEST ELEVATION OCCURS AT ONE OR BOTHENDS - NOT ALONG ITS LENGTH.ABCDA.FINISHED GRADE OF PAVED SURFACEB.SLEEVE FOR LATERAL PIPEC.SLEEVE FOR MAINLINE PIPED.SLEEVE FOR WIRINGFINISHED GRADEELEVATION VIEWPLAN VIEWNOTE:1. COPPER TRACING WIRE WILL START AT THE POINT-OF-CONNECTIONAND WILL BE ROUTED WITH ALL MAINLINE PIPE.2. SPLICE TRACING WIRE IN IRRIGATION MAINLINE COMPONENT VALVEBOXES WHEN POSSIBLE, OTHERWISE, PLACE SPLICE IN SEPARATEVALVE BOX.ABCDEFGHA.10" ROUND VALVE BOXB.INSTALL TRACING WIRE TO THE TOP OF VALVEBOXC.WATER PROOF CONNECTION (SEESPECIFICATIONS)D.PIPE SLEEVE SEE VALVE DETAILE.TAPE COPPER WIRE TO TOP OF PIPE EVERY 10 FT.F.CONTINUOUS LOOP COPPER TRACING WIRE (SEESPECIFICATIONS)G.PVC PIPEH.VALVE (TYPICAL)4PLANTER POT IRRIGATIONDETAILN.T.S.AA.PVC LATERAL PIPEB.SCH. 40 PVC TEE OR EL (SERVICE OUTLET).INSTALL NECESSARY BUSHING.C.SCH. 40 PVC BARB (FPT X BARB)D.3/4-INCH 160 PSI POLYETHYLENEE.SCH. 40 PVC 34" X 12" COUPLING ANDNECESSARY BARBED CONNECTIONS.F.1/2-INCH POLYETHYLENEG.1/2-INCH SCH. 40 PVC BALL VALVE (FORISOLATION). INSTALL NECESSARY SCH. 40PVC BARB FITTINGS AND STAINLESS STEELPINCH CLAMPS. INTENDED AS ISOLATIONVALVE.H.INLINE DRIP TUBING COILED IN POT ASNEEDEDI.TERMINATE END OF INLINE DRIP TUBINGWITH 1/2-INCH SCH. 40 PVC BALL VALVE ANDNECESSARY SCH. 40 PVC BARB FITTINGSAND STAINLESS STEEL PINCH CLAMP(INTENDED AS FLUSHING VALVE)J.PLANTER POT (RE:LANDSCAPE)K.CONTRACTOR TO COORDINATEPENETRATIONS AS REQUIRED IN THE FIELDBCDIJGEFHKP