HomeMy WebLinkAboutFY21 Street Maintenance Projects3 3 3 1 3 2 2 2 2
Master
Plan ID Location Matrix
Score
BABAB
Score PTSC Score TOTAL Cost Description Notes
new
matrix
score
public input schools conn. - existing conn. - proposed network gaps
conn. - activity
centers
street paving
projects
ease of
implementation Equity/Transit
Cottonwood and Annie (Gallatin High)0 0 $ 45,000.00 Add RRFB to existing crossing 0
E-W Connection 0 0 $ 12,000.00 TOP Project match funds 0
Front St Connection 0 0 $ 12,000.00 TOP Project match funds 0
Graf St Gap 0 0 $ 36,000.00 Infill of SUP gap on City property at Graf and S 19th Ave. south side of Graf immediately east of S 19th 0
SPOT-12 W. Oak & Hunter's Way 0 0 $ 60,000.00 Add RRFBs to recently improved crossing RRFBs were originally include in TA project. 0
SPOT-37 W. Oak @ Gallatin Regional/Oak Springs Parks 0 0 $ 60,000.00 Add RRFB to existing crossing 0
SPOT-44 Cattail & Davis (connects to CJ Middle School)0 0 $ 40,000.00 improve crossing with RRFB, improved markings and ramps 0
SPOT-28 Breeze Ln & Buckrake Ave 0 0 $ 9,000.00 Add ramps, realign trail, crosswalk striping partnership with GVLT and Parks and Rec 0
SP-31 W. Main (north side): Babcock - N. 20th 22 6 28 $ 34,560.00 widen sidewalk on the north side to create SUP 0
SP-32 W. Main (south side): Babcock - N. 20th 22 6 28 $ 15,552.00 widen sidewalk on the south side to create SUP 0
Frontage Path 0 0 $ 12,000.00 TOP Project match funds 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Add projects here previously scored by BABAB
score calculated from input scores
Fill in scores in the grey with 2, 1, or 0 based on Ranking Criteria
Potential Bike Ped Funding projects for FY21
Multiplier
1