Loading...
HomeMy WebLinkAboutA&C Bike_Ped Projects3 3 3 1 3 2 2 2 2 ID Facility Type Location Matrix Score BABAB Score PTSC Score TOTAL Cost Notes Description public input schools conn. - existing conn. - proposed network gaps conn. - activity centers street paving projects ease of implementation Equity/Transit TMP SUP Oak St: Rose Park to Davis 0 0 $ 195,840.00 widen sidewalk north side TMP calls for SUP. Development installed sidewalk Sidewalk/S UP Haggerty Lane: Main St to Ellis St 0 0 $ 147,456.00 some shared use path Connects high density development to commercial on Main St. Connection to mental health facility. Connection to softball complex and trail system of Highland GlenTMP SUP Davis Lane: Oak to Baxter 0 0 $ 144,000.00 widen sidewalk west side TMP calls for SUP. Development installed sidewalk SP- 27&28&29 SUP Valley Center Rd/Catamount - N 19th 0 0 $ 270,000.00 This section of pathway is an existing network gap in the paved pathway system. Exiting shared use pathway exists along N 19th Ave from Oak St north to East Valley Center. Development projects have constructed paved shared use pathways from Catamount north and west toward Davis Lane. Future development is expected to infill the remaining gap to connect with the existing shared use path along E Valley Center to Jackrabbit Lane. Filling this network gap is an opportunity to continue the efforts to connect a shared use path between Belgrade and Bozeman. TMP SUP Cottonwood Road: Durston to Babcock 0 0 $ 149,760.00 widen sidewalk east side TMP calls for SUP. Development installed sidewalk. Space limited in places Grade Sep W Oak St: Rose Park 0 0 $ 750,000.00 Provides N-S connection that connects neighborhoods north and south of Oak St with schools, parks, and commercial. TMP SUP N 19th: Baxter Lane - Kimberwicke 0 0 $ 201,600.00 west side, requires ROW, develoment may happen soon This would complete the path on N 19th on both sides between Oak St and E Valley Center. It serves to connect the bike lanes west on Baxter to the commercial area of Gallatin Center. TMP SUP Cottonwood Road: Babcock to Main St 0 0 $ 149,760.00 widen sidewalk east side TMP calls for SUP. Development installed sidewalk. Space limited in places SP-14 SUP Oak St. Extension/12th - 7th 0 0 $ 228,000.00 south side connection Priority would be on connecting N 12th with future connections to the south along N 8th or N 9th as identified in the TMP. SP-6 SUP S. 19th/Region 3 HQ - Kagy 0 0 $ 267,840.00 Connects the existing SUP on the east side of S 19th with future path south as well as future paths on Kagy. SPOT-39 Grade Sep Huffine/Fowler 0 0 $ 750,000.00 concept may be included in Fowler design provides crossing of Huffine lane at a key location where N-S Fowler Ave corridor meets the E-W Huffine Corridor. Connects residential to commercial and MSU. SPOT-40 Grade Sep N 19th/Stevens 0 0 $ 750,000.00 connects across the N 19th corridor at location that is identified in the TMP. SP-34 SUP Frontage Rd Path / Nelson Rd to Moss Bridge 0 0 $ 345,600.00 Frontage Road Path is identified in all major long range planning documents. For this short segement City property is the remaining gap. SP-26 SUP S. 19th: Graf - Blackwood 0 0 $ 388,800.00 TMP lists to Nash continues the S 19th Path to the southern city boundary SP-18 SUP Huffine: Cottonwood west to City limit 0 0 $ 576,000.00 Extend the Huffine Lane path to western City limit Grade Sep S 19th Ave/Blackwood 0 0 $ 750,000.00 connects neighborhoods west of N 19th to Sacajawea MS and Mornigstar Elementary score calculated from input scores Projects for Arterial & Collector Street Fund Multiplier Fill in scores in the grey with 2, 1, or 0 based on Ranking Criteria 1