HomeMy WebLinkAboutURD Minutes 6-20 DRAFT Downtown Urban Renewal District Board Meeting Minutes--DRAFT June 16, 2020 Attending: Bobby Bear, Cory Lawrence, Marley McKenna, Tony Renslow, Nick Zelver, Chris Naumann, Emily Cope, Chris Mehl Absent: Bill Stoddart Public Comment: David Loseff, Ashley Ogle, Dick Harte, Brit Fontenot, Mike Veselik, Danielle Scharf were in attendance. Minutes ACTION: Tony Renslow moved to approve the May minutes as presented. Cory Lawrence seconded the motion. All voted in favor. Financial Report Chris presented the finance report as of June 16, 2020. The previous month’s expenses were as follows: $2,602 for Soroptomist Park landscaping and maintenance, $2,968 for DBIP matrix cost estimates, $1,195 for TD&H Engineering for Rouse Ave Streetscape engineering, and $938 for structured parking feasibility analysis. Executive Director’s Report Downtown Plan Projects Here are some updates regarding other projects proposed in the 2019 Downtown Plan. Bozeman Creek—the Downtown Partnership is working with Mountain Time Arts to identify opportunities to enhance and improve Bozeman Creek. Their initial work is being partially funded with a Downtown URD Technical Assistance Grant. MTA has created a project website that will be updated as more work is completed: https://mountaintimearts.org/see-bozeman-creek MTA and Intrinsik Architecture will be completing the creek grant work in July 2020. Soroptomist Park—the Downtown Partnership is working with the MSU CATS program to have a fall semester senior-level landscape design class work on improvement concepts for Soroptomist Park. DBP staff is finalizing the Service-Learning Studio Project Proposal. Alley Improvements—using funds allocated in the FY2020 URD budget, the Downtown Partnership is finalizing a scope of work with DHM Landscape Architects to refine the alley improvement concepts they developed in 2018. The next round of design work will create a template for specific improvements and provide initial cost estimates for construction. DHM has recently held three stakeholder meetings: property and business owners; City and utility officials; and artist community. Transportation & Mobility Analysis—the URD board is working through a fourth round of edits to the Scope of Work. Structured Parking Planning—major impediments have been discovered with the two preferred sites for a second garage. Therefore, DBP staff is looking at other sites and reconsidering different types of structured parking. North Black Pocket Park Construction of the North Black Pocket Park in southwest corner of Black Lot public parking lot is making significant progress. The project includes three elements: new pocket park; relocated Black Lot egress; and new streetscape including sidewalk, streetlamps, and trees. The landscaping and irrigation work is currently scheduled to be performed by AV Construction from May 15th through June 15th. AV began installing landscaping elements but has been delayed by a malfunctioning City water shutoff valve. MDT Rouse Project Negotiations continue with Montana Department of Transportation to have downtown streetlamps installed along Rouse Avenue between Main and East Lamme Streets this summer when MDT completes the Rouse reconstruction project. MDT’s general contractor, Missouri River Construction (MRC), has agreed to contract with the URD directly for the installation of the streetlamps and related electric infrastructure. TD&H has completed the final engineering. We are waiting for construction bids from MRC. We are also working with MDT on the streetscape maintenance agreement. The Lamme to Main Street portion of the project is contracted to start June 15th and be completed by August 15th. Despite 18 months of discussions, MDT has not signed off on the installation of downtown streetlamps. City Parking Policy Discussion—DELAYED The City Commission and Parking Commission are planning to hold a joint work session in April during a regularly scheduled City Commission meeting. The work session will include a progress report on the 2019 Downtown Strategic Parking Management Plan and discussions about the remaining strategies. This work session as been delayed due to COVID-19 and will be rescheduled. Downtown Plan UDC Recommendations—DELAYED The following UDC revisions recommended in the 2019 DBIP will be considered for implementation in April by the City Commission. UDC revisions have been postponed until October 2020. 1) Allow small "bonus" business signage to help activate the alleys (#16 in the DIP Appendix) 2) Expand allowable ground floor uses Downtown. This will once again allow things like offices on Mendenhall ex: Fico and Opportunity Bank at 5 West Building. (#2 in the DIP Appendix; note that #9 was also related to this but was already fixed in a previous round of edits.) 3) Allow specific site considerations to come into play when determining the "street vision triangle." (#7 in the DIP Appendix) Rainbow Crosswalk Project—DELAYED Gender Equality Montana met with the DBP staff and Mayor Chris Mehl in March 2020 to propose installing rainbow crosswalks in downtown. They proposed that the crosswalk be installed at the intersection of Tracy Ave. and Main St. - ideally one at each crossing (North, East, South and West). To be the most inclusive, the proposed crosswalks should include the traditional rainbow colors (red, orange, yellow, green, blue, purple) as well as black, brown, white, light blue and pink. Planning Updates In this section, I will provide update about several ongoing City planning processes. Community Plan (City Growth Policy) Update Consultants: Logan Simpson (Ft. Collins) Update: The Planning Board has decided to spend more time revising the draft plan so the February 10th City Commission presentation will be rescheduled to a later date. https://www.bozeman.net/city-projects/bozeman-community-plan-update Community Housing Action Plan Consultants: Navigate, LLC Workforce Housing Solutions Update: The City Commission completed their review of the Community Housing Action Plan on Monday January 13, 2020. Initial UDC edits will be considered in October 2020. https://www.bozeman.net/city-projects/community-housing-action-plan https://www.bozeman.net/city-projects/community-housing-needs-assessment FEMA Floodplain Map The refined 100-year floodplain areas become effective for regulatory purposes on June 22, 2020. On this date the City’s floodplain regulations, as well as the flood insurance mandate under federal law, will apply to “Special Flood Hazard Areas” (SFHAs). See attached memo dated 6-16-20. Technical Assistance Program Update Five grants have been awarded for FY2020, three of which are still open. One grant remains from FY2018 for the Osborne Building. Other Financial Program Updates Streetscape Grants: None Hotel Incentive Grant: Armory Hotel-Pending Life-Safety Grants: None Fiber Connectivity Grant: None Building Projects Armory Hotel construction resumed following the City Commission appeals ruling on April 6th. Osborne Building (233 East Main) 4-story mixed use building with 2 floors of restaurant use and 2 floors of offices. Construction began October 2018. See https://www.theosbornebozeman.com/ “OSM” Building 5 story mixed use building proposed on southwest corner of Babcock and Wallace—construction began Spring 2019. One 11 Lofts (corner of North Willson and West Lamme) 50-unit apartment building with 53 parking spaces. Construction began spring 2019. Merin Condos (on North Bozeman across from Dave’s Sushi) 28 units of owner-occupied housing. Under construction. Village Downtown 30 new residential condo units and 9 single-family lots are under review by the City. Veranda Apartments (111 South Church) proposed new construction of 6 units. AC Hotel (5 East Mendenhall) 6 story 140 room full-service hotel. Site Plan approved in November 2019. Under construction. East End Flats (240 East Mendenhall) 6-story mixed use project. Development review completed and final site plan approved. Strata Building (106 East Babcock)—former BSW Bank—3 floor (46,000 SF) office building. Construction projected to be complete 4th quarter 2020. Carin Townhomes (northwest corner of W Beall & N Grand)—5 townhome condos currently Date Project Name Project Address Applicant Professional Type Value Completed 4/16/2018 Osborne Building 233 East Main Street Casey Durham Locati Arch Plan/Façade 10,500$ Total 10,500$ Technical Assistance Program FY2018 Report Date Project Name Project Address Applicant Professional Type Value Completed 10/7/2019 Gallatin Laundry 137 East Babcock St Robert Lateiner Think Tank Plan/Façade 10,500$ YES 11/1/2019 9 E Main Street 9 E Main Street Robert Lateiner Think Tank Façade 3,000$ CANCELED 1/30/2020 Bozeman Creek Watercourse of Bozeman Creek Jim Madden Intrinsik Planning 7,500$ 1/30/2020 DA Davidson & Co 529 E Main St Randy Scully Intrinsik Planning 7,500$ 1/30/2020 102 E Babcock Street Parking Lot102 E Babcock St- Block B Lot 12ARandy Scully Intrinsik Planning 7,500$ Total 10,500$ Technical Assistance Program FY2020 Report under construction. New Businesses • Athleta—2 East Main—former Miller’s Jewelry location—tenant improvements underway • Teton Gravity Research—9 East Main—formerly Sassy Sisters—opening this summer • Tanoshii—113 East Main—formerly Corx—renovations underway • Blackbird Kitchen—140 East Main—formerly C. Moose—expansion to open summer 2020 • Genuine Ice Cream—407 West Main—opening very soon • Revelry—24 North Tracy—formerly Starky’s (and Barley & Vine)—opening in June • TBD—23 West Main—formerly Stix • TBD—27 East Main—formerly Crossroads—to be redeveloped as a restaurant(s). • TBD—132 East Main—Dari Rasa is going out of business • TBD—137 East Babcock—formerly Gallatin Laundry • TBD—303 East Main—formerly Fire Pizza • TBD—424 East Main—Yellowstone Wild Gallery is going out of business • TBD—544 East Main—formerly Heeb’s • TBD—33 South Willson—formerly Delicious Bakery • TBD—19 South Willson—formerly Barely & Vine Discussion and Decision Items DBIP Transportation Plan SOW Chris presented the revised Transportation Scope of Work by Sanderson Stewart which included a not-to-exceed amount for part one, adding an item to the SOW which included that parking will be considered with each proposed improvement, and moving the “Limited Topographic Survey and Base Mapping” task to Part Two of the SOW. David Loseff commented that the configuration of back-in angled parking and turning Main Street into three lanes will not fit on Main Street. He stated he believes that the current configuration on Main Street is not broken, so there is no need to change it. He expressed concern of losing the status of a state highway and as a result losing funding that would fall back on the City and taxpayers to cover. He asked if the cost of converting the configuration on Main Street is being answered. Marley McKenna responded that the SOW includes many transportation elements other than just Main Street configuration. Cory Lawrence commented that Part One now seems “right sized” and will provide a lot of answers to everyone’s questions so the board can more thoroughly consider proceeding to Part Two. Ashley Ogle asked where the proposed 3-lane conversion would start and stop. Chris answered that it would likely go from Broadway to 7th Avenue. She stated now is not the best time to study the flow of traffic because of COVID-19, Rouse Avenue construction and MSU not in session. Bobby Bear answered that flow would be studied in Part Two if the board decides to move forward. Ashley Ogle asked if anyone had set up a meeting with MDT. Danielle Scharf responded that MDT reviewed the SOW. Ashley Ogle asked if anyone had considered if making Main Street three lanes would make Downtown Bozeman better or worse. Chris Mehl responded that the engineering needs to be done first and then public discussions can start about possible projects, but the data needs to be collected first to inform the discussions and any decisions. David Loseff said that the data is available about lane widths on Main Street and it does not fit with the configuration of back-in diagonal parking and three lanes. Chris emphasized that there are several potential lane configurations and combinations of parking orientation that would result in a net increase in the number of parking space. He said the point of the analysis is to definitively quantify the benefits and challenges so professionally informed decisions can be made. Chris clarified that none of the concepts would include bike lanes on Main Street as the Downtown Plan recommends improved bike facilities on Mendenhall and Babcock. Bobby Bear reiterated that the SOW includes more than just converting Main Street to three lanes. Dick Harte asked the board to consider snow removal on Main Street, if there were other cities that could be used as case studies that converted to three lanes, and the importance of pedestrian safety on Mendenhall and Babcock. He also said he thinks the one-ways go the wrong direction. He stated that we need information first before spending money. Chris Naumann read an email from Lynn Zanto from MDT that stated she did not think there would not be a loss of funding of Main Street were being converted to three lanes as its functions would remain the same. ACTION: Marley McKenna moved to approve Part One of the Downtown Transportation Scope of Work with Sanderson Stewart. Nick Zelver seconded the motion. All voted in favor. FY2021 Budget Chris presented the FY2021 Budget Memo and draft budget (both attached below). Bobby Bear highlighted the COB Interlocal Share increase from the FY2020 budget to the FY2020 projected year-end went from $875,000 to $1,300,000. Cory Lawrence commented that two items that he has hesitations on included the alley improvements and historic inventories. Chris Naumann noted that many of the URD projects will take years to plan and implement. David Loseff asked what portion of North Willson are included for streetscape improvements. Chris responded it would be for the portion next to the public parking lot. David included that he would be interested in discussing doing his side of Willson at the same time. David Loseff included comments on the budget that the alley improvements should remain functional for deliveries and other truck uses and the trees in Soroptomist Park are historic and should be preserved regardless of any improvements. David asked where the residential incentive program can be used. Chris responded it must be used within the URD boundary and that no one has applied for the grant program. The board agreed to provide matching funds for the Design Guidelines-Historic Inventories rather than funding the entire amount, the amount in the budget will be reduced by 50%. Part One of the DBIP: Transportation Planning will be encumbered from the FY2020 budget and reduced to $31,710 from $50,000. The balance of the Scope of Work will be shown in Part Two. ACTION: Cory Lawrence moved the FY2021 Budget as presented with board suggested amendments. Marley McKenna seconded the motion. All voted in favor. Meeting was adjourned at 1:55 pm June Finance Report Category FY2020 FINAL Budget FY2020 YTD activity Income Starting Cash Balance 2,145,000 2,145,000 Income from TIF 430,000 209,449 revenue as of 1/20 COB Interlocal Share 875,000 709,859 Entitlement Share State of Montana 45,000 28,025 Interest Income 14,000 14,191 Other Income 0 3,338 Lamp ins. claim Total Income 3,509,000$ 3,109,862$ Expenses Operations Management Fee and Administration 120,000 URD Management Contract/Employee 42,000 Total Operations 162,000$ 162,000 Infrastructure Improvements 122 Alpine Lawn Street Furniture and Park Maintenance 10,000 8,306 2,480 Greenspace North Black Pocket Park Construction 10,000 13,000 Streetscape--new purchases 25,000 22,209 North Rouse Streetscape Project Streetlamps (26 qty)85,000 Tree Frames/Grates (24 qty)35,000 Streetscape Assistance Grant Program 50,000 Streetlamp Power Reconfiguration Project 250,000 Alley Improvement Program 25,000 Public Parking Improvements 250,000 45,200 Life-Safety Grant Program 50,000 8,697 Fiber Infrastructure--Lamme Carry-Over 90,000 81,709 Fiber-Broadband Infrastructure--Grants 10,000 1,050 Alternative Transportation Project 25,000 Total Improvements 915,000$ 180,171$ Planning City Economic Development Technician 22,470 Technical Assistance Grants 50,000 18,000 FY19 Encumbered Funds 7,500 7,500 Residential Incentive Program 200,000 Armory Hotel Incentive Encumbered Funds 100,000 DBIP: Transportation Planning 200,000 1,278 DBIP: Code Amendments 50,000 DBIP: Design Guidelines 50,000 DBIP: General Implementation 75,000 12,336 2,968 DBIP Matrix Cost SILD & Streetscape Engineering 25,000 17,408 1,195 TD&H-Rouse Structured Parking Feasibility Analysis 25,000 13,449 938 GSA Site South Wallace Asbestos Project 75,000 Professional Services Term Contract 75,000 Streetscape Preliminary Engineering 25,000 Sewer Capacity and Buildout Analysis 15,000 Total Planning 994,970$ 69,971$ Parking Structure Garage Bond Payment 430,000 Total Parking Garage Payments 430,000$ Total Expenses 2,501,970$ 412,142$ 7,703 Balance 1,007,030$ 2,697,720$ DOWNTOWN URBAN RENEWAL DISTRICT TO: BID BOARD & URD BOARD FR: CHRIS NAUMANN RE: Downtown Floodplain Update UPDATE The refined 100-year floodplain areas become effective for regulatory purposes on June 22, 2020. On this date the City’s floodplain regulations, as well as the flood insurance mandate under federal law, will apply to “Special Flood Hazard Areas” (SFHAs) which includes the “Floodway” [horizontal striped area] and the “100-yr Floodplain” [orange area] shown below. INSURANCE Flood insurance is mandated under federal law for any building with a federally backed mortgage located in the Special Flood Hazard Area (SFHA; orange and striped areas). The banks holding mortgages in these areas will be the primary party requiring compliance. The Montana DNRC has resources to help mortgaged owners obtain the required coverage. DEVELOPMENT State and City floodplain regulations have significant implications and prohibitions for properties and buildings within the SFHA (orange and striped areas). The 100-year Floodplain (orange) requires City Floodplain permit for any development. More specifically, new residential construction requires ground floor to be 2 feet higher than flood level. New commercial construction must include flood proofing measures for mechanical system and other aspects. Substantial Improvements (equating greater than 50% value of structure) to existing buildings must meet the same standards as new construction. The Floodway designation (striped) prohibits almost all types of new construction. Substantial improvements of existing buildings in the Floodway require the same flood proofing as those required in the 100-year Floodplain (described above). RESOURCES • City of Bozeman Floodplain information webpage https://www.bozeman.net/government/engineering/floodplain • City of Bozeman GIS Floodplain map link https://gisweb.bozeman.net/Html5Viewer/?viewer=floodplain • DNRC Floodplain website link http://dnrc.mt.gov/divisions/water/operations/floodplain-management New Downtown Floodplain Map Downtown Urban Renewal District Scope of Work – Downtown Transportation Study Task Order No. DTN20-002 6/12/20 Sanderson Stewart is pleased to provide this scope of work for a transportation study that will provide analysis and recommendations associated with the transportation-related improvements in the 2019 Downtown Bozeman Improvement Plan (DBIP). This work is to be done as a part of the Downtown Urban Renewal District term contract for architectural and engineering services. This project generally consists of background research, data collection, and analysis associated with the following recommended improvements from the DBIP: • Main Street – convert to three lanes with back-in angled parking from 7th Avenue to Cypress Street as recommended on page 92 of the DBIP. As noted on page 92, if wider areas are needed for parking, an asymmetric street section may also be considered with parallel parking to remain on one side and angled parking on the other. Other variations that fit within the existing street width may also be considered. • Mendenhall Street – modify existing sharrow striping to improve visibility from 11th Avenue to Rouse Avenue as recommended on page 96 of the DBIP. • Babcock Street – eliminate on-street parking on north side and replace with two-way cycle track from 8th Avenue to Wallace Avenue as recommended on page 96 of the DBIP. • Install traffic signals at Babcock/Black and Mendenhall/Black intersections as recommended on pages 66 and 91 of the DBIP. • Improve Black Avenue as a Bicycle Corridor as recommended on page 66 of the DBIP. • Install pedestrian crossing enhancements at Babcock/Wallace, Babcock/Grand, and Mendenhall/Grand intersections as recommended on pages 62 and 68 of the DBIP. • Parking is an integral component of the transportation system in Downtown Bozeman and the recommendations in the DBIP. Parking spaces gained or lost with each of the proposed improvements above will be considered as part of the evaluation criteria. The analysis will be conducted in two parts. Part 1 will consist of concept designs in plan view for the full length of the three corridor projects (bullets 1-3 above). This effort will be completed first to verify feasibility of the recommendations from the DBIP. Design concepts will be reviewed by the Downtown Bozeman Partnership, City of Bozeman and MDT prior to proceeding with Part 2 of the project, which will require a separate authorization to proceed. Part 2 will include traffic data collection and analysis of the affected intersections and corridors for the extent of the improvements. The scope of work for Part 2 may need to be reconsidered based on the findings from Part 1 prior to the separate authorization to proceed. A detailed list of assumptions and scope of services for the project are outlined below. Scope of Work: Part 1 – Concept Design Phase 1 – Project Management and Coordination This phase of the project will include project initiation and planning tasks, including scoping, contract preparation, and kick-off meetings with the Downtown Bozeman Partnership, City of Bozeman and MDT. Other project management tasks include the following: • Coordination with Client and project team • Coordination with City of Bozeman and MDT • Research and review of previous related studies (including the DBIP and the Bozeman Transportation Master Plan) and available traffic data • Correspondence, phone calls and meetings throughout the duration of the project • Weekly project update emails • Monthly invoicing of project fees/expenses • Internal (project team) coordination and quality control reviews of analysis and deliverables Phase 2 – Concept Design This phase of the project will consist of the development of plan-view design concepts for each of the projects described on page 1 of this scope of work. The concepts will be based on base maps previously prepared for the 2003 Downtown Bozeman Streetscape Project and street width dimensions provided by MDT and the City of Bozeman. A topographic survey (if needed) will be completed under Part 2 of the project. The concept design exhibits will be drawn to scale to verify feasibility of the DBIP recommendations, but they will be highly graphic in nature for presentation to project stakeholders. Concept designs will address the anticipated intersection treatments and transitions at the east and west ends of the projects and will also identify other related projects from the DBIP that overlap these project corridors, such as the Black Avenue Bike Corridor, recommended signals at Black/Babcock and Black/Mendenhall, and pedestrian crossing improvements along Babcock and Mendenhall. Each of the design concepts will present a summary of parking spaces gained or lost for each project area. Design concepts for State Highway System routes (including National Highway System and Urban Route facilities) will be designed in accordance with MDT design standards. All non-MDT facilities will be designed in accordance with City of Bozeman design standards. Phase 3 – Concept Design Summary Memo Part 1 of this project will culminate with submittal of a memo summarizing the concept design effort and identifying potential challenges associated with the improvements. This memo will be submitted, along with the design concepts, to the Downtown Partnership, Bozeman Parking Commission, City of Bozeman and MDT for review. A review meeting will be held at this stage of the project with representatives from each jurisdiction to discuss the concepts and identify any concerns prior to proceeding with the remainder of the analysis (Part 2). Comments from the reviewing agencies will be addressed prior to making the design concept exhibits or concept design summary memo available for public review. If any design concepts are determined to be infeasible by any of the reviewing agencies, those concepts may be removed from consideration prior to Sanderson Stewart being authorized to proceed with Part 2 of the project. Part 2 – Data Collection, Analysis and Reporting Phase 4 – Data Collection After a separate notice to proceed has been issued for Part 2 of the project, Sanderson Stewart will begin with traffic volume data collection using Miovision video data collectors. This effort will consist of PM peak hour turning movement counts at the following 34 intersections: Main Street • 7th Avenue • 5th Avenue • 3rd Avenue • Grand Avenue • Willson Avenue • Tracy Avenue • Black Avenue • Bozeman Avenue • Rouse Avenue • Church Avenue • Wallace Avenue • Broadway Avenue • Cypress Street Mendenhall Street • 11th Avenue • 7th Avenue • 5th Avenue • 3rd Avenue • Grand Avenue • Willson Avenue • Tracy Avenue • Black Avenue • Bozeman Avenue • Rouse Avenue Babcock Street • 8th Avenue • 5th Avenue • 3rd Avenue • Grand Avenue • Willson Avenue • Tracy Avenue • Black Avenue • Bozeman Avenue • Rouse Avenue • Church Avenue • Wallace Avenue Existing annual average daily traffic (AADT) volume data from MDT will also be reviewed and summarized for this analysis. Other tasks include: • Set up, relocation and retrieval of Miovision Scout video data collectors at the locations identified above • Data processing through Miovision, including bicycle and pedestrian counts and vehicle classification for approximate PM peak hour period (processing of 2 hours/intersection), as well as up to 16 hours of data at up to six intersections where traffic signal warrants will be evaluated • Format count data and develop study area maps to illustrate existing traffic control and existing volumes Phase 5 – Evaluation of Existing Conditions The traffic analysis tasks will begin with an evaluation of existing conditions. Sanderson Stewart will prepare corridor models for Main, Babcock and Mendenhall. The models will initially be created for existing conditions so that a direct comparison of analysis results can be provided for existing conditions and recommended improvements. The following tasks will be completed in this phase: • Set up corridor models in Synchro or Vissim to conduct capacity analysis for existing conditions (traffic volumes, traffic control and lane configurations) • Analysis of bike and pedestrian performance measures for existing conditions • Prepare summary tables for review of analysis results • Request crash data from MDT for study area • Review and summarize crash data, calculate metrics and prepare summary figures • Perform turn lane warrant analysis and traffic signal warrant analysis Phase 6 – Evaluation of Recommended Improvements The recommended improvements from the DBIP will be evaluated using the same methodology used for existing conditions. The recommended improvements will be added to the models and they will be analyzed for existing and future traffic volumes. The following tasks will be included: • Set up corridor models to conduct capacity analysis with recommended improvements and existing traffic volumes • Develop future traffic volume projections for 20-year planning horizons using historic background growth rates • Use corridor models to conduct capacity analysis for recommended improvements and future traffic volumes • Analysis of bike and pedestrian performance measures for recommended improvements with existing and future volumes • Prepare summary tables for review of analysis results • Prepare summary of parking spaces gained or lost for each of the recommended improvements • Turn lane warrant analysis and traffic signal warrant analysis • Develop study area maps that show future traffic volume scenarios Note that it has been assumed that a redistribution of existing traffic volumes will not be included in this analysis. It is our understanding that the future improvements on each corridor are generally intended to accommodate the same level of traffic that exists on the roadways today. Future volumes will be projected, but volumes will not be redistributed from one corridor to the next. Phase 7 – Limited Topographic Survey and Base Mapping This phase of the project will utilize base maps previously prepared for the 2003 Downtown Bozeman Streetscape Project on Main Street from Grand Avenue to Rouse Avenue. A limited topographic survey will be completed to verify curb lines and back of sidewalk locations within this area and to extend the base map area to the full extent of the recommended corridor projects listed on page 1 (first 3 bullets). The following tasks will be included in this phase of the project: • Survey back of curb and back of walk for the full length of the Main, Mendenhall, and Babcock corridor projects described on page 1 using GPS survey equipment. • Develop base drawings using the streetscape project drawings supplemented with the new topographic survey information. Phase 8 – Update Concept Designs The design concepts developed under Part 1 of this study will be revisited to assess if any revisions to the original improvement recommendations may be necessary based on the results of the analysis effort. The concept designs and graphics will be revised and developed to a higher level for presentation at stakeholder/public meetings. Other improvements may be identified during the analysis phase and will be added to the design concepts as needed. Up to one alternative concept design will be considered for each corridor to address any areas where the analysis results do not support the improvements recommended in the DBIP. Phase 9 – Engineer’s Opinion of Probable Cost Opinions of probable construction cost will be developed for each of the design recommendations and alternatives developed. They will be broken down by individual project/improvement. Phase 10 – Stakeholder Involvement It is anticipated that a thorough stakeholder and public involvement process will be needed for this project. Individual tasks and meetings/presentations include the following: • Prepare presentation materials • One (1) open house-style stakeholder/public meeting will be held after the analysis is complete and design concepts have been updated to show the full extent of recommended improvements. • One (1) meeting each is anticipated with the following stakeholder groups: o Transportation Coordinating Committee o Pedestrian and Traffic Safety Committee o Bozeman Area Bicycle Advisory Board o Urban Renewal District Board o Business Improvement District Board • Comments received through these meetings and presentations will be summarized and presented for Client and agency review. Comments will be addressed as needed in the analysis and design concepts prior to preparing the summary report. Phase 11 – Summary Report The preceding analysis and design concepts will be presented in a final summary report. This report will present the following project elements: • Background information and research • Summary of all analysis completed for existing and future traffic volumes and with recommended improvements • Summary of recommended improvements • Recommendations for any amendments to the Bozeman Transportation Master Plan or the DBIP (as required) • Concept design illustrations for recommended improvements • Planning-level opinions of probable construction cost for recommended improvements and alternatives • Summary of public participation process, including comments matrix (appendices) • Next steps and potential funding opportunities A draft report will be submitted for review to the Downtown Partnership, City of Bozeman and MDT. A final report will be prepared after all review comments are received and addressed. Other Potential Scope Items: The following items are additional potential scope items that were included as transportation-related recommendations in the DBIP. They are not currently included in this scope of work but could be added by a contract amendment if needed. • Parking related modifications • Transit-related improvements (Streamline circulator with park-and-ride service would utilize Mendenhall and Babcock) • Alternative Transportation Facilities (EV charging stations, ride share, car share, and micro mobility improvements) Other Exclusions: The following items are not expected to be needed for this project and are therefore specifically excluded from this scope of work: • Full topographic and boundary survey of the proposed projects • Analysis of additional major improvements not included in this scope, such as conversion of Babcock or Mendenhall to two-way operation • Regional travel demand modeling (using MDT model) • Design of any roadway or intersection improvements beyond concept-level as described above • Presentation of findings beyond the review meetings and stakeholder/public meeting listed in this scope If needed, these items will be added as a separate task order or contract amendment. Fees and Billing Arrangements: Phase Fee Part 1 – Concept Design 1. Project Management and Coordination $10,720 2. Concept Design $16,410 3. Concept Design Summary Memo $4,580 Sub-Total for Part 1 $31,710 Part 2 – Data Collection, Analysis and Reporting 4. Data Collection $12,820 5. Evaluation of Existing Conditions $6,610 6. Evaluation of Recommended Improvements $14,900 7. Limited Topographic Survey and Base Mapping $16,060 8. Update Concept Designs $11,400 9. Engineer’s Opinion of Probable Cost $8,220 10. Stakeholder Involvement $7,600 11. Summary Report $12,980 Sub-Total for Part 2 $90,590 Total Project $122,300 Sanderson Stewart will bill for its services on a time and materials basis with a not-to-exceed amount of $31,710 for Part 1 and $90,590 for Part 2 with a total project fee of $122,300. We will not proceed with Part 2 of the project until a separate authorization to proceed is given by the Client. Sanderson Stewart shall submit invoices to the Client for work accomplished during each calendar month. The amount of each monthly invoice shall be determined on the “percentage of completion method” whereby Sanderson Stewart will estimate the percentage of the total work (provided on a lump sum basis) accomplished during the invoicing period. Project Schedule: The anticipated schedule for this project consists of the Part 1 deliverables within 3 months of notice to proceed. The Part 2 deliverables are anticipated to take 5 additional months to complete after a separate authorization to proceed with Part 2 is given by the Client. Reasonable time shall be allowed for review and coordination with the various agencies and stakeholders. Category FY2020 FINAL Budget PROJECTED FY20 Year-End FY2021 DRAFT Budget Income Starting Cash Balance 2,145,000 2,145,000 2,665,771 Income from TIF 430,000 425,000 335,000 COB Interlocal Share 875,000 1,300,000 1,400,000 Entitlement Share State of Montana 45,000 56,050 56,050 Interest Income 14,000 20,000 20,000 Other Income 0 3,338 - Total Income 3,509,000$ 3,949,388$ 4,476,821$ Expenses Operations Management Fee and Administration 120,000 120,000 175,000 URD Management Contract/Employee 42,000 42,000 Total Operations 162,000$ 162,000.00$ 175,000$ Infrastructure Improvements Street Furniture and Park Maintenance 10,000 10,000 15,000 North Black Pocket Park Construction 10,000 20,000 - Streetscape--new purchases 25,000 26,000 30,000 North Rouse Streetscape Project Streetlamps (26 qty)85,000 - 85,000 Tree Frames/Grates (24 qty)35,000 - Phase 1 Construction: Conduit 60,000 Phase 2 Construction: Lamps 80,000 North Willson Streetscape Project 75,000 Streetscape Assistance Grant Program 50,000 10,000 50,000 Streetlamp Power Reconfiguration Project 250,000 - 250,000 Alley Improvements 25,000 - 50,000 FY20 Encumbered 19,000 Bozeman Creek Improvements 50,000 Public Parking Improvements 250,000 250,000 Library Pedestrian Safety Improvements 15,000 Life-Safety Grant Program 50,000 20,000 50,000 Fiber Infrastructure 90,000 90,000 100,000 Fiber-Broadband Infrastructure--Grants 10,000 2,500 10,000 Alternative Transportation Projects 25,000 - 25,000 Total Improvements 915,000$ 428,500$ 964,000$ Planning City Economic Development Specialist 22,470 5,618 21,740 Technical Assistance Grants 50,000 30,000 50,000 FY20 Encumbered Funds 15,000 FY19 Encumbered Funds 7,500 7,500 Residential Incentive Program 200,000 - 200,000 Armory Hotel Incentive Encumbered Funds 100,000 - 100,000 DBIP: Transportation Planning 200,000 50,000 Part One--Concept Designs 50,000 Part Two--Data, Analysis, Cost Est 75,000 DBIP: Alley Planning 25,000 DBIP: Bozeman Creek Planning 30,000 DBIP: Soroptomist Park Planning 6,000 DBIP: Code Amendments 50,000 - 10,000 DBIP: Design Guidelines-Historic Inventories 50,000 20,000 77,500 DBIP: General Implementation 75,000 75,000 100,000 SILD & Streetscape Engineering 25,000 20,000 25,000 Structured Parking Feasibility Analysis 25,000 25,000 25,000 Structured Parking Informal, Site Plan, Bids 750,000 South Wallace Asbestos Project 75,000 - 75,000 Professional Services Term Contract 75,000 10,000 75,000 Streetscape Preliminary Engineering 25,000 25,000 25,000 Sewer Capacity and Buildout Analysis 15,000 - Total Planning 994,970$ 268,118$ 1,735,240$ Parking Structure Garage Bond Payment 430,000 425,000 335,000 Total Parking Garage Payments 430,000$ 425,000$ 335,000$ Total Expenses 2,501,970$ 1,283,618$ 3,209,240$ Balance 1,007,030$ 2,665,771$ 1,267,581$ DOWNTOWN URBAN RENEWAL DISTRICT