Loading...
HomeMy WebLinkAbout006-Specifications_09-04-2018X. CLEANING/PROTECTION AND WARRANTIES A. All items to be installed by the contractor shall be left in a clean and as-new condition. Upon completion of the installation, clean all soiled surfaces and touch up all finishes in accordance with the manufacturer’s instructions. All debris and packing material shall be removed and disposed of in a legal manner. The protective masking of the plastic surfaces shall be removed by the contractor upon completion of installation. All excavation and site work shall be returned to its original grade configuration after contract items are installed. B. Finish Surfaces All units shall be warranted in writing by the contractor for a period of no less than one year from the date of Owner acceptance. All finishes (except large format computer output) are to be warranted for 3 years from the date of Owner acceptance. There shall be: 1. No delamination of any portion of the object including vinyl graphics and copy. 2. No cupping, warping or dishing. 3. No bubbling, crazing, chalking, rusting or other disintegration of surfaces, messages or edge finishes. 4. No corrosion developing beneath the paint surface of the support systems, except as the result of obvious vandalism. 5. No corrosion of the fasteners. 6. No movement of objects from their foundations. The objects must remain true and plumb on their foundations, except when obvious post-installation external damage has occurred. 7 . No fading of the colors when matched against a sample of the original color and material. 8. No variation of any other performance stated by Design Workshop on the drawings or in the Fabricator Performance and Material Requirements. C. Structure/Components Contractor shall provide Owner with 3 copies of the written warranty prior to installation guaranteeing to correct, to Owner’s satisfaction, at contractor’s sole expense, all defects in fabrication and installation of work for a period of one year after Owner’s acceptance of completed installation. D. Maintenance The contractor shall provide to Owner 3 copies each of complete finish/component care instructions as specified by the manufacturer for on-going cosmetic cleaning and maintenance. These are to be submitted in an 8-1/2” x 11” 3-ring binder. Contractor to ensure signage, neon, lamps, and electrical components etc. are easily accessible for maintenance. XI. PERMITS A. Securing and paying for all permits required by governmental agencies is the responsibility of the contractor. Inspections and tests necessary for the construction and placement of all work required by the applicable governing agencies is by the contractor. XII. THE AMERICANS WITH DISABILITIES ACT REQUIREMENTS ALL SIGNS MUST COMPLY WITH ADA GUIDELINES AND/OR CODE REQUIREMENTS. ALL CARTS, KIOSKS, BOOTHS, FURNITURE AND ANY OTHER OBJECT OR FABRICATION DESCRIBED IN THE DESIGN INTENT DOCUMENTS MUST COMPLY WITH ADA GUIDELINES AND ALL APPLICABLE CODE REQUIREMENTS. is responsible for all other aspects of fabrication including engineering, procedure, installation techniques and performance as well as coordination with site conditions and related trades. B. Product Data The contractor shall submit manufacturer’s technical data and installation instructions for each fixture provided within the completed, installed unit. Contractor shall provide identification of all materials used, including manufacturer’s descriptive literature, control number, name, code number, batch and formula (when available). C. Specific Samples The contractor shall submit a minimum of three (3) samples (minimum size 6” x 6” or as requested by Design Workshop) of each color and finish on the specified materials. Samples must be submitted in a timeframe allowable for review, multiple adjustments, and approval without delay to the project. Design Workshop’s review of samples will be for color, texture, and aesthetic compatibility with existing or adjacent materials. Compliance with all other requirements is the exclusive responsibility of the contractors. When specified, furnish full-size samples of objects, partial objects, and/or materials. Resubmit samples if requested until required sheen, color, texture, and compliance with Fabricator Performance and Material Requirements is accepted. D. Structure Design of installation, internal structure, mounting assemblies and foundations are by contractor. Contractor shall submit three sets of prints and one reproducible set of comprehensive engineering drawings to Design Workshop incorporating an adequate foundation and/or mounting structure for all sign components to meet all load and wind requirements and given site conditions. The contractor shall, at his or her expense, submit for Owner’s review, calculations, sealed by certified engineers registered in the state of final installation, for all structural members including foundations. E. Custom Fabricated Items The contractor is to submit shop drawings of all custom fabricated items and specifications on all standard pre-manufactured items. F. Maintenance The contractor shall provide the Owner with complete finish/ component care instructions as specified by the manufacturer for on-going cosmetic cleaning and maintenance. Three sets are to be submitted in an 8-1/2” x 11” 3-ring binder. Turn over to Owner one (1) unopened gallon of each color and finish used on the project clearly marked with complete specification and “P” color reference.