Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Bob Murray, Project Engineer Shawn Kohtz, City Engineer
SUBJECT: Davis Lane Lift Station and Norton Sewer Project – Fourth Amendment.
MEETING DATE: October 6th, 2020
AGENDA ITEM TYPE: Consent
RECOMMENDATION: Approve and authorize City Manager to sign the Fourth Amendment with HDR Engineering, Inc.
BACKGROUND: Attached is a copy of the partially executed Fourth Amendment with HDR Engineering, Inc. for the Davis Lane Lift Station and Norton Sewer Project. The document is in
the City’s standard format.
The developer of the Northwest Crossing subdivision NWX, LLC has requested that the new sewer main between Equestrian and Baxter be installed deeper than it is currently designed and was bid. This will allow them to replace the sewer main along Baxter deeper than it is now which in turn will allow them to serve more of their property by gravity flow. This amendment
is for the cost of the redesign for the deeper installation between Equestrian and Baxter. The
developer will be reimbursing the City for the cost of this amendment and also for the additional cost of the deeper installation which will be processed in a future change order from the contractor.
UNRESOLVED ISSUES: None
ALTERNATIVES: As suggested by the City Commission
FISCAL EFFECTS: $6,395.00 to be reimbursed by NWX, LLC
Attachments: Fourth Amendment
Report compiled on: 9/16/20
386
Fourth Amendment to Professional Services Agreement for Davis Lane Lift Station and Norton Sewer Project
FY 2019 – FY 2020 Page 1 of 2
FOURTH AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT
1.Scope of Services. Section 2 of the Agreement is revised to include the attached Exhibit
A.
2.Payment. Section 4 of the Agreement is revised to include the amount specified in the
attached Exhibit B. The Construction and Administration is to be time and materials not
to exceed per the attachment.
Original Fee: $ 841,714.00
Amendment 01: $ 39,834.00
Amendment 02: $ 61,300.00
Amendment 03: $ 885,800.00
Amendment 04: $ 6,395.00
Total: $ 1,835,043.00
3.Agreement still valid. All remaining terms and provisions of the Agreement remain valid.
**** END OF AGREEMENT EXCEPT FOR SIGNATURES ****
THIS FOURTH AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT
FOR Davis Lane Lift Station and Norton Sewer Project dated February 25, 2019 (the
“Agreement”) is made and entered into this 9th_____ day of _____September_______, 2020, by and between
the CITY OF BOZEMAN, MONTANA, a self governing municipal corporation organized and
existing under its Charter and the laws of the State of Montana, 121 North Rouse Street, Bozeman,
Montana, with a mailing address of PO Box 1230, Bozeman, MT 59771, hereinafter referred to
as “City,” HDR Engineering, Inc., hereinafter referred to as “Contractor.”
In consideration of the mutual covenants and agreements herein contained, the receipt and
sufficiency whereof being hereby acknowledged, the parties hereto agree to amend the Agreement
as follows:
387
Fourth Amendment to Professional Services Agreement for Davis Lane Lift Station and Norton Sewer Project
FY 2019 – FY 2020 Page 2 of 2
IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and
year first above written.
CITY OF BOZEMAN, MONTANA HDR ENGINEERING, INC.
By________________________________ By_____________________________
Jeff Mihelich, City Manager Print Name: Jared R. Harris
Title: Vice President
APPROVED AS TO FORM
By_______________________________
Greg Sullivan, Bozeman City Attorney
388
1 of 2
Exhibit A
Davis Lane Lift Station Amendment No. 4 Scope of Services
Task 100. Baxter Lane Sewer Deepening
Objective: Provide a revised design per direction from the City of Bozeman and Morrison Maierle to accommodate sanitary sewer service to the west on Baxter Lane. Coordinate with DEQ and City of Bozeman to permit the design changes. Coordinate with COP Construction
on design changes, contract documents, and construction materials.
Subtasks: 101 Review for Potential Conflict. Review the existing as-builts in Baxter Lane for
potential conflicts with public utilities. Review survey information, including locates and potholes, for potential conflicts.
102 Not Used.
103 Redesign of Plans. Sanderson Stewart will update sanitary sewer plan and profiles (C4.0 – C4.1) between stations 0+00 to 9+58.37. The redesign will be based on maintaining the invert elevations at MH1 in Baxter Lane and MH4 in Equestrian Lane, shifting the alignment of main in Baxter Lane to align with the
centerline of the roadway, and deepening the sanitary sewer at MH1A as much as
possible. Direction on the realignment of the sanitary sewer main in Baxter Lane has been provided by Morrison Maierle and the City of Bozeman.
104 Design Drop Manhole & Update Specifications. In order to deepen the sanitary
sewer in Baxter Lane to the depths requested by Morrison Maierle, a new drop
manhole (MH1A) is proposed. This may require an additional detail and additional information in the Special Provisions.
105 Permit Plans (DEQ and City of Bozeman). Coordination with DEQ and the
City of Bozeman to permit the redesigned plans, if necessary. This shall include minor revisions to the engineering report, if required. This item shall not include significant modifications to DEQ permitting material or preparation of deviations.
106 Review Shop Submittals. Review of revised or new submittals, including
modifications to MH2 and MH3 and new MH1A (drop manhole). Review of additional submittals may be required.
107 Coordinate with COP Construction and Review Change Order. The
modifications will result in a change of scope to COP Constructions contract
389
2 of 2
work. Sanderson Stewart will assist in preparation of a change order to COP
Construction’s contract as well as coordinate with COP Construction, HDR, and the City of Bozeman on the change order.
390
Total BudgetTaskTask DescriptionStatus SUBCONTRACTOR EXPENSES TOTAL COST101Review for Potential Conflicts.730$-$ 730$102Not Used.-$ -$ -$ 103Redesign Plans.1,620$-$ 1,620$104Design Drop MH and Update Specs.1,515$-$ 1,515$105Permit Plans.536$-$ 536$106Review Shop Submittals.767$-$ 767$107Coordinate with COP/Change Order.1,229$-$ 1,229$Subtotal (including optional)6,395$-$ 6,395$6,395$ -$ 6,395$ Other Direct CostsTask 100Baxter Lane Sewer Deepending391
Davis Lane Lift Station & Norton Sewer Bidding & Construction/Contract AdministrationPRINCIPALSENIOR ENGINEER IPROJECT ENGINEER IDESIGNER I (CADD)SENIOR PROF. LAND SURVEYORSTAFF SURVEYOR IISTAFF ENGINEER IPROJECT ADMINISTRATORTOTAL LABOR FEESUBCONSULTANTSEXPENSESTOTAL FEETASK DESCRIPTION\ BILL RATE$185.00 $145.00 $110.00 $90.00 $135.00 $100.00 $95.00 $75.00100 Amendment #4 - Baxter Lane Sewer Deepening101 Review for Potential Conflicts1 2 2$695.00$695.00102 Review for Capacity103 Redesign Plans0.5 2 4 8$1,542.50$1,542.50104 Design Drop Manhole & Update Specifications 0.5 2 82$1,442.50$1,442.50105 Permit Plans (DEQ and City of Bozeman)2 2$510.00$510.00106 Review Shop Submittals2 4$730.00$730.00107 Coordinate with COP / Change Order2 8$1,170.00$1,170.00108 Coordination with MM and City of Bozeman2 12 28 10$6,090.00$6,090.002 12 28 10$6,090.00$6,090.00Subtotal Project Management19012Date:Project Name:Project Manager:Project Number:9/8/2020Tim PirtzTotal 392