HomeMy WebLinkAbout11 Written Narrative of Changes 8-21-202131 Graf
Master Site Plan & Site Plan Resubmittal #2
Narrative of Changes
MADISON ENGINEERING - CIVIL
APPLICATION DOCUMENTS
General – Updated the project name to “2131 Graf” on all revised documents.
Form A1 – Updated the project name and other information on the form
Project Narrative – Updated the narrative to account for one less Type A building
Storm Water Management Design Report – The report was Updated per City Review
Comments. Groundwater Monitoring data was added to the report. The underground
detention/retention basins were updated as necessary to account for seasonal high
groundwater. The Drawings with the report were updated per city comments. The stormwater
basins were adjusted per the shift of the alignment of S 21st Ave. The report text was updated
as necessary. The contours were adjusted on Basin 7 to reflect drainage into the proposed
gravel detention infiltration systems.
Water and Wastewater Design Reports – The reports were updated to reflect the change in
total number of units. The sewer report was updated to estimate the flow rates into the
existing Graf St Sewer.
Cash in in lieu of Water Rights Agreement – The agreement was updated to reflect the changes
in the total number of units. Brian Heaston was contacted and his revisions were incorporated
into the agreement.
Open Space Calculations & Exhibit – The calculations and Exhibit were updated to reflect the
decrease in total units and alignment shift of S 21st Ave. Two new Future Phase open space
areas were added along S 21st Ave adjacent to Bldg 13 & 16. The balconies on the Type A units
were increased in size to a minimum dimension of 6’ and square footage greater than 36 square
feet. The Type A balconies are now included in the open space area calculations.
Parking Calculation – The parking calculations and requirements were updated to reflect the
decrease in total units and shift of alignment of S 21st Ave. The excess parking spaces were
converted to snow storage areas.
Floor Area Ratio Calculations – The FAR calculations were updated to reflect the minor changes
in areas of the net lot area due to the shift of the alignment of S 21st Ave and the loss of Building
14 (Type A).
Proposed Park Development & CIL Summary – The Required Parkland Summary was updated
per minor area changes and per parks department comments.
Lantern Park Development and Maintenance Agreement – The Park’s department commented
that revisions were required to the agreement. The parks department has been contacted to
coordinate on the revisions but has not yet provided them. They will be provided as soon as
they are available.
Street, Trail, City Utility, NEW Utility Easements – The easements were updated per City
comments, exhibits have been included for each easement.
Arnold St Public Access Easement for connection to Discovery Drive – City engineering
requested that documentation be submitted for the connection of Arnold St and Discovery drive
which is part of the Nexus Point development to the north of the site. The public access
easement for the connection has been provided.
Deviation Request – The deviation request for the offset alignment on the Hope Lutheran
Driveway has been removed from the application.
CIVIL DRAWINGS
General – Updated the project name to “2131 Graf” on all plan sheets. All buildings now have
addressing shown throughout the plan sheets.
C0.0 MASTER SITE PLAN COVER SHEET – Updated the sheet index to reflect which sheets had
changes on this submittal with revision dates. Updated the project narrative per city comments
and the subsequent minor changes caused by the alignment shift of S 21st. Updated the Park
Land Dedication Tracking Table per Park’s department comments and minor area changes.
C0.0 PHASE 1 SITE PLAN COVER SHEET – Updated the sheet index to reflect which sheets had
changes on this submittal with revision dates. Updated the project narrative per city comments
and the subsequent minor changes caused by the alignment shift of S 21st. Updated the Park
Land Dedication Tracking Table per Park’s department comments and minor area changes.
C0.1 CONSTRUCTION MANAGEMENT PLAN - Updated the sheet per the shift in the S 21st Ave
Alignment.
C0.2 OVERALL UTILITY PLAN – Updated the sheet to reflect the shift in the S 21st Ave Alignment.
Made the requested corrections per City Engineering comments. Also updated the power and
gas easements and locations per Northwestern Energy Comments. The park boundary was
revised to exclude the wetland setbacks. In addition, a 25’ wide access easement was added
along the eastern edge of the property per BMC 38.400.110.H. The side setback adjacent to S
Lantern Park was reduced to 5’ per BMC 38.320.030.
C0.3 – PHASING PLAN - Updated the sheet to reflect the shift in the S 21st Ave Alignment.
Indicated that the 10’ sidewalk along the western park corridor would be constructed with the
future phase. Added two new future open space areas along S 21st Ave adjacent to Building 13 &
16.
C0.4 – OVERALL PARKING AND STREET FRONTAGE PLAN - Updated the sheet to reflect the shift
in the S 21st Ave Alignment. Also updated the Graf St striping, as Graf St is not currently striped
for parking spaces. The parking counts shown on this sheet were updated to reflect the Graf St
Striping and the loss of Building 14 Type A due to the alignment shift, and the subsequent
revision to the future parking lot near building 13. Some of the parking spaces were modified to
serve as snow storage spaces during the winter, per city review comments. The parking counts
were updated to reflect the snow storage parking spaces. The snow storage parking spaces
were removed from the total required parking count per BMC 38.540.020.M.
C0.5 – OVERALL GRADING PLAN - Updated the sheet to reflect the shift in the S 21st Ave
Alignment. Also updated the drainage within the western park corridor and 10’ wide sidewalk
per City Engineering review comments.
C1.0 – OVERALL SITE PLAN - Updated the sheet to reflect the shift in the S 21st Ave Alignment.
C1.1 SITE PLAN – PHASE 1 WEST – Updated the sheet per city review comments. Provided
seating in open space area A and D. Provided concrete sidewalk into Open Space area A.
Modified the gravel infiltration swales into buried gravel infiltration systems. Added more snow
storage areas in the extra parking spaces. Added a 12’ wide paved access road into the park for
the buried retention stormwater chamber maintenance. Increased the size of the bicycle
parking concrete pads from 6’x8’ to 6’x12’.
C1.2 DIMENSION PLAN – PHASE 1 WEST - Updated the sheet per city review comments.
Revised the dimensions of the northernmost pervious paver system. Provided dimensions for
the proposed gravel infiltration systems.
C1.3 SITE PLAN – PHASE 1 EAST – Updated the sheet per city review comments. Revised open
space area F, adding concrete pathways, seating, picnic table, fire pit, and a sheltered pavilion.
Added more snow storage areas in the extra parking spaces. Added a 12’ wide paved access
road into the park for the buried retention stormwater chamber maintenance. Increased the
size of the bicycle parking concrete pads from 6’x8’ to 6’x12’.
C1.4 DIMENSION PLAN – PHASE 1 EAST - Updated the sheet per city review comments. Added
dimensions to the Open Space area F revisions. Revised the dimensions of the southernmost
pervious paver system. Revised the side yard setback on the park to 5’.
C1.5 PHASE 1 DRAINAGE PLAN – Updated the sheet per city review comments. The buried
retention and detention infiltration systems were revised as necessary to account for seasonal
high groundwater. Clarification was added on the callouts for the infiltration systems,
elevations were added to the paver systems.
C1.6 FUTURE PHASE DRAINAGE PLAN – Updated the sheet per city review comments. The
buried retention and detention infiltration systems were revised if necessary to account for
seasonal high groundwater. Clarification was added on the callouts for the infiltration systems,
elevations were added to the paver systems.
C1.7 PHASE 1 WEST – GRADING PLAN –Updated the contours within the western park corridor
and 10’ wide sidewalk per City Engineering review comments. Added finished grade rim
elevation at the buried gravel infiltration system area drain inlets.
C1.8 PHASE 1 WEST – GRADING PLAN – Updated the grading contours in open space area F to
accommodate the revised amenities.
C2.0 CIVIL DETAILS – Updated the project name.
C2.1 CIVIL DETAILS – Updated the project name.
C2.2 CIVIL DETAILS - The concrete swale detail name was changed to concrete chase. Details for
the proposed gravel infiltration systems and the park play area infiltrator were added.
Kephart
Site Plan Modifications
Written Narrative of Changes
Block Frontage
1) Adjusted grade on the site plan to reflect the patio elevation at 1’-0” above grade. This is reflected in
the elevations. Dimensions have been provided. See sheet A2.
Building Design
1) Building A
a) Windows have been added to rear elevation of Type A buildings. This eliminates any stretch of
blank wall over 15’-0.” See sheet A6.
b) Standing seam metal entry canopies that are 4’-0” x 4’-0” in size to match the entry slab/stoop
have been added to each unit entry. See sheet A6.
c) Patios have been increased to 6’-0” in depth.
d) Doors are now shown on rear elevation. See sheet A6.
2) Building I
a) 25’ x 25’ Pavilion added to the submittal
General Comments
3) Updated name of the clubhouse floor plans on sheet A4
Solid Waste Division
1) 8 yard dumpster is 6’x6’x7’ = Size is updated in drawing + walls of enclosure are 9’-0” high. A clear
dimension for opening width has been added to the trash enclosure. See sheet A5.
DCN Narrative for Kephart, 2131 Graf St. Apartments Site Lighting · Tuesday, August 18, 2020 Page 1 of 1
www.dcengineering.net
DCN Narrative for 2131 Graf St. Apartments Site Lighting
Project Date: Service Performed For:
Tuesday, August 18, 2020 Kephart
2555 Walnut St.
Denver, CO 80205
Project Name:
2131 Graf St. Apartments Site Lighting
Drawings
E-1.00 – Electrical Site Plan - Site lighting along West Graf Street revised to meet the City of Bozeman,
Montana Design Standards and Specifications Policy (Rev. March 13, 2020). Additional luminaires added
and height of luminaires along West Graf Street revised to 25’-0”AFG.
E-1.00 – Electrical Site Plan – Revised to reflect roadway re-alignment at intersection with Graf street.
E-1.00 – Electrical Site Plan – Adjusted pole locations along Graf street to maintain 10’ separation from
water, sewer and storm-water infrastructure.
E-1.00 – Electrical Site Plan – Changed building mounted fixture S1 to S2 full cutoff.
E-1.00 – Electrical Site Plan – Relocated light bollard near new access road by proposed buried storm-water
retention system in park.
E-1.01 – Electrical Site Photometric – Site plan revised to show new luminaires and new calculation zones
to meet City of Bozeman, Montana Design Standards and Specifications Policy (Rev. March 13, 2020) and
align with other electrical site plan changes as noted above.
In Site Design
Landscape Architect
Written Narrative of Changes
2131 Graf
SITE LANDSCAPING PLANS
Sheet LS1.0
o Landscape changes due to utility adjustments/additions, bike rack pad adjustments
and open space areas A, D and F adjustments
o Updated Water Smart Plant list per landscape adjustments
Sheet LS1.1
o Landscape changes due to utility conflicts/adjustments/additions, bike rack pad
adjustments and open space areas A and D adjustments.
o Trees have been staggered along the trail along the south side of Building 6.
o Screening notes added to the electrical meter callout.
o Screening callout added for AC units north of Building 5.
Sheet LS1.2
o Landscape changes due to utility adjustments/additions and bike rack pad
adjustments.
o Screening notes added to the electrical meter callouts.
Sheet LS1.3
o Landscape changes due to utility adjustments/additions, bike rack pad adjustments
and open space area F adjustments.
o Screening notes added to the electrical meter callouts.
Sheet LS2.0
o Irrigation changes due to utility adjustments/additions, bike rack pad adjustments
and open space areas A, D and F adjustments.
o Updated Water Consumption Table per landscape adjustments
Sheet LS2.1
o Irrigation changes due to utility adjustments/additions, bike rack pad adjustments
and open space areas A and D adjustments.
Sheet LS2.2
o Irrigation changes due to utility adjustments/additions and bike rack pad
adjustments.
Sheet LS2.3
o Irrigation changes due to utility adjustments/additions, bike rack pad adjustments
and open space area F adjustments.
Sheet LS3.1
o Rockscape arch detail removed due to open space F reconfiguration.
o Bike rack detail added.
o Fire pit and picnic table details added per open space F reconfiguration.
o Screening elevation details added.
SOUTH LANTERN PARK PLANS
Sheet LS1.1
o Landscape changes per the addition of the bike rack and access road
Sheet LS2.1
o Lawn adjustments per the addition of the bike rack and access road
Sheet LS3.1
o Irrigation adjustments per the addition of the bike rack and access road
o Water Consumption table adjusted per the lawn area reduction
Sheet LS4.2
o Grading and drainage intent notes and information have been added to detail 16.
o Details 10 and 11 have been updated to reflect the grading and drainage intent as
well.
o Detail 12 has been updated to reflect the bike rack added.