HomeMy WebLinkAbout11 Written Narrative of Changes 8-21-202131 Graf Master Site Plan & Site Plan Resubmittal #2 Narrative of Changes MADISON ENGINEERING - CIVIL APPLICATION DOCUMENTS General – Updated the project name to “2131 Graf” on all revised documents. Form A1 – Updated the project name and other information on the form Project Narrative – Updated the narrative to account for one less Type A building Storm Water Management Design Report – The report was Updated per City Review Comments. Groundwater Monitoring data was added to the report. The underground detention/retention basins were updated as necessary to account for seasonal high groundwater. The Drawings with the report were updated per city comments. The stormwater basins were adjusted per the shift of the alignment of S 21st Ave. The report text was updated as necessary. The contours were adjusted on Basin 7 to reflect drainage into the proposed gravel detention infiltration systems. Water and Wastewater Design Reports – The reports were updated to reflect the change in total number of units. The sewer report was updated to estimate the flow rates into the existing Graf St Sewer. Cash in in lieu of Water Rights Agreement – The agreement was updated to reflect the changes in the total number of units. Brian Heaston was contacted and his revisions were incorporated into the agreement. Open Space Calculations & Exhibit – The calculations and Exhibit were updated to reflect the decrease in total units and alignment shift of S 21st Ave. Two new Future Phase open space areas were added along S 21st Ave adjacent to Bldg 13 & 16. The balconies on the Type A units were increased in size to a minimum dimension of 6’ and square footage greater than 36 square feet. The Type A balconies are now included in the open space area calculations. Parking Calculation – The parking calculations and requirements were updated to reflect the decrease in total units and shift of alignment of S 21st Ave. The excess parking spaces were converted to snow storage areas. Floor Area Ratio Calculations – The FAR calculations were updated to reflect the minor changes in areas of the net lot area due to the shift of the alignment of S 21st Ave and the loss of Building 14 (Type A). Proposed Park Development & CIL Summary – The Required Parkland Summary was updated per minor area changes and per parks department comments. Lantern Park Development and Maintenance Agreement – The Park’s department commented that revisions were required to the agreement. The parks department has been contacted to coordinate on the revisions but has not yet provided them. They will be provided as soon as they are available. Street, Trail, City Utility, NEW Utility Easements – The easements were updated per City comments, exhibits have been included for each easement. Arnold St Public Access Easement for connection to Discovery Drive – City engineering requested that documentation be submitted for the connection of Arnold St and Discovery drive which is part of the Nexus Point development to the north of the site. The public access easement for the connection has been provided. Deviation Request – The deviation request for the offset alignment on the Hope Lutheran Driveway has been removed from the application. CIVIL DRAWINGS General – Updated the project name to “2131 Graf” on all plan sheets. All buildings now have addressing shown throughout the plan sheets. C0.0 MASTER SITE PLAN COVER SHEET – Updated the sheet index to reflect which sheets had changes on this submittal with revision dates. Updated the project narrative per city comments and the subsequent minor changes caused by the alignment shift of S 21st. Updated the Park Land Dedication Tracking Table per Park’s department comments and minor area changes. C0.0 PHASE 1 SITE PLAN COVER SHEET – Updated the sheet index to reflect which sheets had changes on this submittal with revision dates. Updated the project narrative per city comments and the subsequent minor changes caused by the alignment shift of S 21st. Updated the Park Land Dedication Tracking Table per Park’s department comments and minor area changes. C0.1 CONSTRUCTION MANAGEMENT PLAN - Updated the sheet per the shift in the S 21st Ave Alignment. C0.2 OVERALL UTILITY PLAN – Updated the sheet to reflect the shift in the S 21st Ave Alignment. Made the requested corrections per City Engineering comments. Also updated the power and gas easements and locations per Northwestern Energy Comments. The park boundary was revised to exclude the wetland setbacks. In addition, a 25’ wide access easement was added along the eastern edge of the property per BMC 38.400.110.H. The side setback adjacent to S Lantern Park was reduced to 5’ per BMC 38.320.030. C0.3 – PHASING PLAN - Updated the sheet to reflect the shift in the S 21st Ave Alignment. Indicated that the 10’ sidewalk along the western park corridor would be constructed with the future phase. Added two new future open space areas along S 21st Ave adjacent to Building 13 & 16. C0.4 – OVERALL PARKING AND STREET FRONTAGE PLAN - Updated the sheet to reflect the shift in the S 21st Ave Alignment. Also updated the Graf St striping, as Graf St is not currently striped for parking spaces. The parking counts shown on this sheet were updated to reflect the Graf St Striping and the loss of Building 14 Type A due to the alignment shift, and the subsequent revision to the future parking lot near building 13. Some of the parking spaces were modified to serve as snow storage spaces during the winter, per city review comments. The parking counts were updated to reflect the snow storage parking spaces. The snow storage parking spaces were removed from the total required parking count per BMC 38.540.020.M. C0.5 – OVERALL GRADING PLAN - Updated the sheet to reflect the shift in the S 21st Ave Alignment. Also updated the drainage within the western park corridor and 10’ wide sidewalk per City Engineering review comments. C1.0 – OVERALL SITE PLAN - Updated the sheet to reflect the shift in the S 21st Ave Alignment. C1.1 SITE PLAN – PHASE 1 WEST – Updated the sheet per city review comments. Provided seating in open space area A and D. Provided concrete sidewalk into Open Space area A. Modified the gravel infiltration swales into buried gravel infiltration systems. Added more snow storage areas in the extra parking spaces. Added a 12’ wide paved access road into the park for the buried retention stormwater chamber maintenance. Increased the size of the bicycle parking concrete pads from 6’x8’ to 6’x12’. C1.2 DIMENSION PLAN – PHASE 1 WEST - Updated the sheet per city review comments. Revised the dimensions of the northernmost pervious paver system. Provided dimensions for the proposed gravel infiltration systems. C1.3 SITE PLAN – PHASE 1 EAST – Updated the sheet per city review comments. Revised open space area F, adding concrete pathways, seating, picnic table, fire pit, and a sheltered pavilion. Added more snow storage areas in the extra parking spaces. Added a 12’ wide paved access road into the park for the buried retention stormwater chamber maintenance. Increased the size of the bicycle parking concrete pads from 6’x8’ to 6’x12’. C1.4 DIMENSION PLAN – PHASE 1 EAST - Updated the sheet per city review comments. Added dimensions to the Open Space area F revisions. Revised the dimensions of the southernmost pervious paver system. Revised the side yard setback on the park to 5’. C1.5 PHASE 1 DRAINAGE PLAN – Updated the sheet per city review comments. The buried retention and detention infiltration systems were revised as necessary to account for seasonal high groundwater. Clarification was added on the callouts for the infiltration systems, elevations were added to the paver systems. C1.6 FUTURE PHASE DRAINAGE PLAN – Updated the sheet per city review comments. The buried retention and detention infiltration systems were revised if necessary to account for seasonal high groundwater. Clarification was added on the callouts for the infiltration systems, elevations were added to the paver systems. C1.7 PHASE 1 WEST – GRADING PLAN –Updated the contours within the western park corridor and 10’ wide sidewalk per City Engineering review comments. Added finished grade rim elevation at the buried gravel infiltration system area drain inlets. C1.8 PHASE 1 WEST – GRADING PLAN – Updated the grading contours in open space area F to accommodate the revised amenities. C2.0 CIVIL DETAILS – Updated the project name. C2.1 CIVIL DETAILS – Updated the project name. C2.2 CIVIL DETAILS - The concrete swale detail name was changed to concrete chase. Details for the proposed gravel infiltration systems and the park play area infiltrator were added. Kephart Site Plan Modifications Written Narrative of Changes Block Frontage 1) Adjusted grade on the site plan to reflect the patio elevation at 1’-0” above grade. This is reflected in the elevations. Dimensions have been provided. See sheet A2. Building Design 1) Building A a) Windows have been added to rear elevation of Type A buildings. This eliminates any stretch of blank wall over 15’-0.” See sheet A6. b) Standing seam metal entry canopies that are 4’-0” x 4’-0” in size to match the entry slab/stoop have been added to each unit entry. See sheet A6. c) Patios have been increased to 6’-0” in depth. d) Doors are now shown on rear elevation. See sheet A6. 2) Building I a) 25’ x 25’ Pavilion added to the submittal General Comments 3) Updated name of the clubhouse floor plans on sheet A4 Solid Waste Division 1) 8 yard dumpster is 6’x6’x7’ = Size is updated in drawing + walls of enclosure are 9’-0” high. A clear dimension for opening width has been added to the trash enclosure. See sheet A5. DCN Narrative for Kephart, 2131 Graf St. Apartments Site Lighting · Tuesday, August 18, 2020 Page 1 of 1 www.dcengineering.net DCN Narrative for 2131 Graf St. Apartments Site Lighting Project Date: Service Performed For: Tuesday, August 18, 2020 Kephart 2555 Walnut St. Denver, CO 80205 Project Name: 2131 Graf St. Apartments Site Lighting Drawings E-1.00 – Electrical Site Plan - Site lighting along West Graf Street revised to meet the City of Bozeman, Montana Design Standards and Specifications Policy (Rev. March 13, 2020). Additional luminaires added and height of luminaires along West Graf Street revised to 25’-0”AFG. E-1.00 – Electrical Site Plan – Revised to reflect roadway re-alignment at intersection with Graf street. E-1.00 – Electrical Site Plan – Adjusted pole locations along Graf street to maintain 10’ separation from water, sewer and storm-water infrastructure. E-1.00 – Electrical Site Plan – Changed building mounted fixture S1 to S2 full cutoff. E-1.00 – Electrical Site Plan – Relocated light bollard near new access road by proposed buried storm-water retention system in park. E-1.01 – Electrical Site Photometric – Site plan revised to show new luminaires and new calculation zones to meet City of Bozeman, Montana Design Standards and Specifications Policy (Rev. March 13, 2020) and align with other electrical site plan changes as noted above. In Site Design Landscape Architect Written Narrative of Changes 2131 Graf SITE LANDSCAPING PLANS Sheet LS1.0 o Landscape changes due to utility adjustments/additions, bike rack pad adjustments and open space areas A, D and F adjustments o Updated Water Smart Plant list per landscape adjustments Sheet LS1.1 o Landscape changes due to utility conflicts/adjustments/additions, bike rack pad adjustments and open space areas A and D adjustments. o Trees have been staggered along the trail along the south side of Building 6. o Screening notes added to the electrical meter callout. o Screening callout added for AC units north of Building 5. Sheet LS1.2 o Landscape changes due to utility adjustments/additions and bike rack pad adjustments. o Screening notes added to the electrical meter callouts. Sheet LS1.3 o Landscape changes due to utility adjustments/additions, bike rack pad adjustments and open space area F adjustments. o Screening notes added to the electrical meter callouts. Sheet LS2.0 o Irrigation changes due to utility adjustments/additions, bike rack pad adjustments and open space areas A, D and F adjustments. o Updated Water Consumption Table per landscape adjustments Sheet LS2.1 o Irrigation changes due to utility adjustments/additions, bike rack pad adjustments and open space areas A and D adjustments. Sheet LS2.2 o Irrigation changes due to utility adjustments/additions and bike rack pad adjustments. Sheet LS2.3 o Irrigation changes due to utility adjustments/additions, bike rack pad adjustments and open space area F adjustments. Sheet LS3.1 o Rockscape arch detail removed due to open space F reconfiguration. o Bike rack detail added. o Fire pit and picnic table details added per open space F reconfiguration. o Screening elevation details added. SOUTH LANTERN PARK PLANS Sheet LS1.1 o Landscape changes per the addition of the bike rack and access road Sheet LS2.1 o Lawn adjustments per the addition of the bike rack and access road Sheet LS3.1 o Irrigation adjustments per the addition of the bike rack and access road o Water Consumption table adjusted per the lawn area reduction Sheet LS4.2 o Grading and drainage intent notes and information have been added to detail 16. o Details 10 and 11 have been updated to reflect the grading and drainage intent as well. o Detail 12 has been updated to reflect the bike rack added.