Loading...
HomeMy WebLinkAbout01 Cover Letter Site Plan Resubmittal #2 8-21-20 MADISON ENGINEERING August 21, 2020 Sarah Rosenberg City of Bozeman Planning Department 20 East Olive Bozeman, MT 59715 RE: Resubmittal #2 of"2131 Graf' Residential Development, Phase I - Site Plan Application 19308 Dear Sarah: On behalf of our client, Graf Apartments LLC,we are resubmitting for the second time the Phase I Site Plan application for review for the proposed"2131 Graf'(previously named Icon Apartment Homes at 2131 Graf Street)Multi Unit Household Residential Development" located on Lot 2 of Minor Sub 235 at 2131 Graf Street. The Phase 1 Site Plan is being resubmitted concurrently with a Master Site Plan resubmittal. This is the second"Revisions& Corrections"resubmittal. Included in our resubmittal package is a fully updated, complete digital application. All of the plan sheets have been updated,with revision clouds, updated project name, and updated dates. The resubmittal consists of the following items: • Form RC—Revision and Correction Submittal Form —New with this Resubmittal #2 8-21-20 • Form CVA—Acknowledgement of COVID-19 Delays—No Changes from May 2020 Resubmittal #1 • Form A 1 - Development Review Application—Updated 8-21-20 • Form SP—Site Plan Required Material—No Changes from June 2019 Submittal • Form SP1 - Site Plan Checklist—No Changes from May 2020 Resubmittal #1 • Form N l —Noticing Material —No Changes from May 2020 Resubmittal #1 • Adjacent Property Owner List—No Changes from May 2020 Resubmittal #1 • Adjacent Property Owner Stamped and Pre-addressed Envelopes—No changes from May 2020 Resubmittal #1 —Madison to mail them out • Project Narrative—Updated 8-21-20 • Response Narrative to Site Plan/MSP Application Review Comments#2—New with this Resubmittal #2 8-21-20 • Written Narrative of Changes—New with this Resubmittal #2 8-21-20 • Response Narrative to Site Plan Application Review Comments—No Changes from May 2020 Resubmittal #1 • Traffic Engineer Comment Response Narrative—No Changes from May 2020 Resubmittal #1 • Informal Review Comment Narrative—No Changes from June 2019 Submittal • Stor n Water Management Design Report—Updated 8-21-20 G1MADISON ENGINEERING\PROJECTS\2018t18-116 Graf St Apts\Application\Site\Site Plan\Resubmittal 2\RC 2 Cover letter 8-14- 20 docx 895 Technology Blvd Suite 203 ♦ Bozeman, MT 59718 ♦ (406) 586-0262 ♦ Fax(406) 586-5740 Sarah Rosenberg Project: 2131 Graf May 29,2020 Page 2 of 2 • Water& Wastewater Design Reports— Updated 8-21-20 • Construction Stormwater(SWPPP)Permit—No Changes from May 2020 Resubmittal #1 • CIL of Water Rights Calculations—No Changes from May 2020 Resubmittal #1 • Agreement for CIL of Water Rights—Updated 8-21-20 • DNRC Letter—No Changes from June 2019 Submittal—Under 10 AF/yr for park irrigation • Open Space Calculation and Exhibit—Updated 8-21-20 • Parking Calculation—Updated 8-21-20 • Floor Area Ratio Calculations—Updated 8-21-20 • Proposed Park Development& CIL Summary—Updated 8-21-20 • Lantern Park Development and Maintenance Agreement—May 2020 version is included, updated version to be provided as soon as it is available. • Street, Trail, City Utility,NWE Utility Draft Easements- Updated 8-21-20 • Arnold St Public Access Easement for connection to Discovery Drive—New with this re- submittal #2 • Wetland Permit Application—No Changes from June 2019 Submittal • Wetland Deed Restriction—No Changes from June 2019 Submittal • Concurrent Construction Request-No Changes from May 2020 Resubmittal #1 • De iiR.t oi;Requt,t—Removed from the Application, no Longer Requested • Traffic Impact Study -No Changes from May 2020 Resubmittal #1 • Geotechnical Report—No Changes from June 2019 Submittal • 2 full size and 1 reduced copies of the Civil Site, Landscape Plan, Site Lighting and Architectural Drawings.—Updated 8-21-20—One digital copy uploaded to cloud link due to COVID 19 restrictions • 2 Digital Copies of Application and Drawings—Updated 8-21-20 - One digital copy uploaded to cloud link due to COVID 19 restrictions No variances are proposed. Please review the submitted material at your earliest convenience. If you have any questions or need additional information please feel free to contact us at 586-0262. Sincerely, Madison Engineering,Inc. L"_ Chris G. Budeski, PE Principal/Owner cc: Will Ralph, Graf Apartments LLC 895 Technology Blvd Suite 203 Bozeman, MT 59718 (406)586-0262 (406)586-5740 Fax