Loading...
HomeMy WebLinkAbout09-22-20 City Commission Packet Materials - C6. PSA w Morrison-Maierle for Inspections and Testing for BPSC Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Chuck Winn, Assistant City Manager SUBJECT: Professional Services Agreement for Special Inspections and Materials Testing for the Bozeman Public Safety Center (BPSC). MEETING DATE: September 22, 2020 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign professional services agreement for special inspections and materials testing with Morrison-Maierle for the BPSC. BACKGROUND: The building codes and general contractor/construction manager project delivery method requires the owner on a project like the BPSC contract with a disinterested third party engineering firm for special inspections and materials testing services. These inspections are conducted throughout the project to ensure specific materials used, and certain construction methods performed, on the jobsite are within specifications issued for the project. These inspections are listed in Attachment A to the agreement and include services such as concrete slump and air content, rebar placement and foundation anchors, welding, structural components, and concrete masonry inspections. Having third party inspectors working directly for the city helps ensure the inspections are independent from the contractor and architect to avoid any potential conflicts of interest. As required, and in accordance with Montana law, Morrison-Maierle was selected through a qualifications-based selection process conducted through a publicly advertised request for qualifications. UNRESOLVED ISSUES: None. ALTERNATIVES: None identified FISCAL EFFECTS: The cost of the special inspection and materials testing services is broken down into three categories: Site Civil and Hardscape – Material Testing and Inspection $30,620, Building – Materials Testing and Special Inspections $135,490, and Reimbursable Expenses $20, 683. The agreement also contains a Not-To-Exceed amount of $186,793. These costs are within the original project budget estimates and contained within the overall project budget. Attachments: Professional Services Agreement – Morrison Maierle Report compiled on: September 14, 2020 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68