HomeMy WebLinkAbout20b Stormwater Maintenance Plan DRAFT 8-14-2020
G:\MADISON ENGINEERING\PROJECTS\2018\18-117 Town Pump 6\Storm\Stormwater Maintenance Plan Draft - Lounge.doc
TOWN PUMP 6 LOUNGE
Storm Water Facilities
Maintenance Plan
OWNER’S RESPONSIBILITY FOR ROUTINE INSPECTION AND MAINTENANCE:
Stormwater Collection and Detention Facility Maintenance Plan.
1. The storm water facility is to be mowed regularly. During the summer,
approximately once every two weeks, the grass is to be mowed and the cuttings are
to be promptly removed and disposed of. Unless visibly tainted, dispose of lawn
clippings in the same manner as yard waste. Otherwise, bag and take to a sanitary
landfill.
3. Remove sediment by hand with a flat bottom shovel during the summer months
whenever sediment covers gravel infiltration area.
4. Re-sod damaged or maintained areas immediately, or use grass plugs from the
adjacent up-slope area.
5. Inspect the facilities periodically, especially after heavy rains (preferably monthly
and after each storm that delivers 0.5 inches of rainfall).
7. Periodically inspect and clean curb cut when soil and vegetation buildup interfere
with flow introduction.
9. See that litter and other debris are removed in order to reduce the tendency to
channel when trash accumulates.
10. Owner to maintain and fund Operation and Maintenance of facilities.
Owner to maintain and fund Operation and Maintenance of facilities.
Signed _________________________
Bozeman 6 LLC