Loading...
HomeMy WebLinkAbout04 C1.1 - Dimension Plan - Lounge 08-11-2020 J \ / FUTURE BLDG SITE 2011 KIMBERWICKE STREET 50' WIDE ENTRYWAY CORRIDOR I DL EX. SETBACK BCESS D PUBLIC EASEMENNT AC 3 DITCC H m 12" D.I. � Q WATER MAIN SCALE o I 7.5 - J - - - - L 3 8T 1"�211' LL- - - - - - ---- - -- - - - - - - - � DiO � IF-- - - - - - - - - - - - - �� \ 9 44.0' 5.0' G 3 EXT'G 10' WIDE P ASPHALT TRAIL R4.5' R4.5 7 T 55.0 0 o / \ E 24.0' F , Z 32.0' 9.8' 99.0' 9.5' 26.0' 18.0' ® 3 M \ / / R4.5' R4.5' ® I I co N'p EX. LIGHT ONT 9'(TYP) v a POLE WITH M. 40 MPH SIGN TYP cJy�gis . ZO.O' 6 I ws 3 �BUDESKI = ti y� azs PE { f + (- PROPOSED of � TOWN PUMP 6 , / F f IT, LOUNGE n 30" BE W AS ME T TR DRAWN BY: CGB R4.5' 6' E ❑ REVIEWED BY: BILE 5.0' R4.5' � TssF i I PROJECT ENGINEER:CGB � 24.0' O ❑ - I DESIGNED BY:CGB EX. CONC. \ 9.8' R4.5' 99.0' 9' R4.5' �,� -I MEDIAN F 18 , .0' 5.T 32.0' R4.5'1�1 o , 2.7 14.4' 1 q� upio�zu_ 2s.o'R20.0' 15' FRONTYARD .0 23 SETBACK f - ° - _ EX. TELEPHONE --- ----- 24.5 10.4' 2 .6_-- '� IBEROPTIC BOX �� & FG oP / RE // �� -� - --.7E 78.19'P UP UP ❑ UP UP UP -UP -UP. UP UP UP UP UG UP UP P UP UP ' Nj7e(�(��1. 3 9225.0' S89"56'29'E 433.57' I r�T�7y1 EXT'G CURB & EXT'G GUTTER E..I SIDEWALK II 8 (7� w w w w w w w w w wow w w w D.I. w w w w w w w w w w 3 �-I C.� // dll II $„ D.I. \� / � °I L a� � ® WATER MAIN \� 8" S s 6\ s � S S S S s/ S S-WATER MAIN_S S S�s S /> BENCHMARK III / / FH ARROW BOLT BENCHMARK / / -,�- <8-I-I W N FH ARROW BOLT IIIIII / 8" SWR PVC KIlIZBERWICKE / 4705.66 IIIIII / SAN SWR MAIN -�-l8 / / SSMH RIM 4 4695 Qa 01.79 8" INV OUT 4695.87 °',. IN 4693.22 �� OUT 4693.01 ° • F�9 O S 89.56'29 E 408.69' - - - - -� - - - - - - - - - - - - - - - -- - - - - - - � \ S,1 4" SAN SWR O INV IN 6696.72 �\\\��T 8 LEGEND � M a i ® e w A p TOOLED JOINT(1" DEEP) 4771 MINOR CONTOUR (1") 0 FOUND MONUMENT AS NOTED f- N -4775 A CONTROL POINT W 1/4' CONCRETE SIDEWALK AND MAJOR CONTOUR (5') oty � 4" THICK P.C.C. CURB BROOM FINISH ------- PROPERTY LINE/ROW BENCHMARK ��1 00 METAL LANDSCAPE 6" TOPSOIL SIDEWALK h+{ cn ^' 4 GRASSED SEE SITE PLAN - EASEMENT LINE SEWER MANHOLE t\ SLOPE EDGING (TYP) _ - 1 FINISH GRADE. _ ° - - FENCE O SEWER WATER VALVE OUT (IIIIII ITT TOP OF ROCK ill III_ o SEWER MAINPq 10' DIA. II III=III III IIL- -® - FIRE HYDRANT IIIIIIIIIIIIIIII IIIII IIIIIIIIIII-IIIIII - 6' -III III III=III III III= 3" COMPACTED SEWER SERVICE 0-INIw F,IT F,m II CRUSHED "- WATER MAIN ® CURB STOPH 11=1THll-IHIIH ROCK BASE j/////////j///// 3" COMPACTED CRUSHED III=111 III III JI-I-II III=1T - _ III-III 111=11 III -III-1 ��A��A��A�� -„s-ws- w WATER WELL `� - III -III III III ROCK BASE WATER SERVICE II_,III IIIII-IIIIIIIIIIIIIIIIIIIIIIIIII III I II COMPACTED o '•� W IHII III IIHII-IIHII Ilr ✓/�/j�%jam%�//� -�-�- STREET SIGN 3 J_LI11= fti Ill-iii III iTHII iTHII �- V// SUBGRADE COMPACTED SUBGRADE FIRE SERVICE N II I41MI III III i,ll' a BOLLARD I 18 OZ. FILTER FABRIC. (III I�=III III III=III III-III=1 �j�IV�V%�� v STORM MAIN ® 6 Pa _ 2' OVERLAP IHIHIHIHIHIHIHI -oa-oP �� LIGHT POLE l;� =III-¶ III=rHll=rill OVERHEAD POWER C� II IIIIII 111711-,,,-111= NATIVE MATERIAL W IIIII III IIIII III-IIIII III IIIII=III III III=III III= TOOLED CONTROL JOINT DETAIL OVERHEAD TELEPHONE `� POWER POLE b F II-III IITI_ L-IIHIII -o -o - b GUY ANCHOR �n - - - - UNDERGROUND GAS r, NOTES: -2.-2.- pp ELECTRICAL PEDESTAL �UNDERGROUND PHONE 000 EXT'G NATIVE 1. CONCRETE DEPTH FOR STD. SIDEWALKS SHALL BE 4" MIN. -` UNDERGROUND ELECTRIC ® ELECTRICAL METER GRAVELS 2. SIDEWALKS SHALL SLOPE AWAY FROM STRUCTURES AND BUILDINGS AS - - ® TELEPHONE PEDESTAL ROAD CENTERLINE SHOWN ON GRADING PLAN. MAXIMUM CROSS SLOPE - 2% INSTALL 6" DIA. FREE DRAINING ROUND ROCK FROM 3. CONCRETE SHALL BE 4,000 PSI ®28 DAYS. CURB & GUTTER ® GAS METER SHEET FINISH GRADE TO 12" BELOW EXT'G GRAVEL LAYER. 4. CONTRACTION JOINTS SHALL BE PLACED AT 5' INTERVALS EDGE OF PAVEMENT D4 GAS VALVE C1.1 ENGINEER SHALL BE ON-SITE DURING EXCAVATION TO 5. EXPANSION JOINT MATERIAL SHALL BE PLACED AT 50' INTERVALS a TEST PIT I DETAIL VERIFY FREE DRAINING GRAVEL MATERIAL DEPTH. 2 DETAIL EDGE OF GRAVEL EDGE OF CONCRETE C PERC TEST � TOWN PTJMP 6I.OUNGE EDGE OF BUILDING !- TREE CONIFER (SIZE AS NOTED) m DIMENSION PLAN at STORM WATER RETENTION& INFILTRATION BASIN Cl t CONCRETE SIDEWALK TREE DECIDUOUS (SIZE AS NOTED) i PROJECT:18-1 17 N.T.S. N.T.S. UNDERGROUND GAS i -oP-OP- UNDERGROUND ELECTRIC 6 DATE:08/11/20