Loading...
HomeMy WebLinkAbout03 C1.0 - Site Plan - Lounge 08-11-2020 3 2011 KIMBER WICKE n � 6" THICK COLORED STREET I FL OF EX. a C� AND SCORE CONCRETE SIDEWALK 50' WIDE ENTRYWAY CORRIDOR 3 DITCH STORMWATER RETENTION I I �, SETBACK AND PUBLIC - AND INFILTRATION BASIN. END OF ROAD ACCESS EASEMENT SEE CIVIL GRADING AND SIGNAGE (TYP) z DRAINAGE PLAN. 1 PROPOSED TRASH ENCLOSURE 3 12"r D.I. r��l PROPOSED EDGE WITH CONCRETE SLAB. SEE WATER MAIN O scm"E o - OF PAVEMENT ARCHITECTURAL FOR DETAIL FUTURE 8" PVC SAN SWR - II /� 0 IW 2W 40' I I MAIN EXTENSION. NOT IN I THIS PROJECT _ �O�PUBNC-UT+LIF* 3 8 -1--i--L- SMOKE HUT. SEE 1"�20' III -- - -J - EASEMENT I SNOW ARCHITECURAL FOR POSED �\\ STORAGE I - - - - - - DETAIL - GAS SERVICE \ AREAN�i PROPOSED TEMPORARY - - - - - - PROPOSED O 2 �NL I e BLOW-OFF -- - ---- - -- -- �• TRANSFORMER AND T FUTURE PARKING ELECTRICAL SERVICE �\ EXPANSION �ADA TACTILE - SURFACE J B. G EXT'G 10' WIDE UP ! ASPHALT TRAIL ,yO ���'D' NO PARKIN\AN ' OV DROP \ ,I CURB PROPOSED CURB PROPOSED f & GUTTER (TYP) CONRETE SIDEWALK (TYP) . ® 3� EX. LIGHT NT J POLE WITHo40 MPH SIGNe b FIRE LANE NOTE: R's/� EPROPOSE ws s\ PROPOSED 5' WIDE - STRIPING - PR HOT TAP AND INSTALL 4" D.I. FIRE AND PAINT CURB RED WITH 2 COATS AND STENCILED WITH "FIRE oers ae 5\ CONCRETE SIDEWALK { z L PROPOSED 2" COPPER WATER SERVICE. INSTALL LANE NO PARKING" AT EACH LOCATION SHOWN. THOROUGHLY S EAsEa TOWNPUMP6 TRACER WIRE ON BOTH. 6.5' MIN COVER CLEAN CURB PRIOR TO PAINTING. INSTALL A "NO PARKING \ \\ INSTALL "No PARKING" F n1 LOUNGE 9 1 30' WDE WTR FIRE LANE" SIGN AND POST AS SHOWN ON SITE PLAN. \ / SINGAGE AND PAINT CURB RED EA MENT DRAWN BY: CGB INSTALL "NO PARKING" u F ADA RAMP WITH WITH WHITE "FIRE LANE NO c E TACTILE SURFACE. REVIEWED BY: BILE SINGAGE AND PAINT CURB RED PROPOSED 8" D.I. PARKING" LETTERING (TYP) ADA PARKING STALL Tss SEE CIVIL DETAILS AND SIGNAGE. SEE �1L. 1 I PROJECT ENGINEER:CGB WITH WHITE "FIRE LANE NO L�� WATER MAIN CIVIL DETAILS PARKING" LETTERING (TYP) EXTENSION p PROPOSED BIKE RACK. DESIGNED BY:CGB 1500 GALLON GREASE D SEE ARCHITECTURAL \��\ E INTERCEPTOR p 4" SAN SWR EX. GONG. FOR DETAIL SERVICE MEDIAN PROPOSED 30' WIDE PROPOSED 4" CLEANOUTS UTIL EASEMENT PROPOSED 4" SAN SWR SERVICE. RIP ING (TYP) a III S=2% MIN. o - II 15' FRONTYARD SAWCUT & REMOVE EXT'G CURB x � rc Y PROPOSED 4" THICK a AND SIDEWALK AND CONSTRUCT 1 - o_ SETBACK _ - - _ - - - - w EX. TELEPHONE a - CONCRETE DRIVEWAY APPROACH- " � CONCRETE SIDEWALKa & FIBEROPTIC BOX ------------ -iLLP , --ems--- ------- PER C.O.B. STD 02529-12.-- --�--Y -- --a" --- -----J y-'� y H G G ����� 10' PILE a i� �� a �°v ,8.19 IT, P UP UP �® UP —UP UP UP —UP —UP UP UP UP UP z UP 4 UP P UP UP U Nj7•A6'17,E 3 W S89.56'29'E 433.57' I � � H EXT'G CURB & EXT'G GUTTER ® F " SIDEWALK I. W w w W W W W W W W W W W W �w W w W W-PROPOSED OUTDOOR PATIO "�Ay VISION CLEARANCEII W VISION CLEARANCE AREA. SEE LANDSCAPE - -�• TRIANAGLE (TYP) YII II 8 D.I. 8" D.I. TRIANAGLE (TYP) DESIGN FOR DETAIL `I° WATER MAIN S S 6\ S � S S S � S S S-WATER MAIN_S S S�s S > BENCHMARK III II i i FH ARROW BOLT BENCHMARK i FH ARROW BOLT III CUT & REMOVE EXT'G 8" SWR PVC KIlIZBERWICKE 4705.66 3 1,1"° IIIIII CURB AND SIDEWALK AND SAN SWR MAIN b -_-l8 � � i SSMH RIM 4703.74 CONSTRUCT CONCRETE 3 Q °{ 01 79 DRIVEWAY APPROACH PER 8" INV OUT 4695.87 'I IN 4693.22 ° 'C.O.B. STD 02529-13 OUT 4693.01 • i ° SAWCUT EXT'G ASPHALT • ° a -AND ! °� I I ® N HOT TAP EXT'G SAN S 89.56'29 E 408.69' 4 • - - �� - - - - - - - - - - - - - - - - - - -SWR SERVICED (NSTALL REPAVE 4" SWR MAIN c I ------------- •<- ----- ------- ------------------------------ ---"- --------PER C.O.B. STDS. 4" SAN SWR _ e S=2.9% < O INV IN 66I6.72 �\\\��T 8 J LEGEND M A a ! ! o 3" ASPHALT CONCRETE 4771 MINOR CONTOUR (1") 0 FOUND MONUMENT AS NOTED 0-4 6" THICK, 1M" MINUS CRUSHED (4 AGGREGATE BASE LEVELING COURSE —4775 MAJOR CONTOUR (5') A CONTROL POINT y^y�yy H 15" THICK, 3"-0 UNCRUSHED ------- PROPERTY LINE/ROW BENCHMARK BASE COURSE 6" THICK, M-4,000 PSI REINFORCED S EASEMENT LINE SEWER MANHOLE ^ n O PORTLAND CEMENT CONCRETE. _ _ A =111i III=III=III=III=III=III=11'=III- o SEWER CLEANOUT h eV WOVEN GEOTEXTILE FABRIC #4 0 18" O.C. EACH WAY FENCE H-4 MIRAFI 60OX OR APPROVED EQUAL ®'-F- SEWER MAIN D4 WATER VALVE yb pq H,.I COMPACTED SUBGRADE SEWER SERVICE v FIRE HYDRANT N 3" THICK, 1"-1/2" CRUSHED ® CURB STOP C' NOTES' ROCK BASE COURSE IN WATER MAIN yty O ACCORDANCE W/MPW 2235 -"�-"s WATER SERVICE OW WATER WELL I�1 1. CONTRACTOR TO REVIEW GEOTECHNICAL REPORT PREPARED BY ALLIED I•� W I ---K- STREET SIGN ENGINEERING AND COMPLY WITH ALL RECOMMENDATIONS. 2' FIRE SERVICE 2. SUBGRADE SHALL BE PREPARED AS REQUIRED IN THE GEOTECHNICAL REPORT STORM MAIN a BOLLARD ® �O 12" THICK, 6"-MINUS UNCRUSHED *L LIGHT POLE - V AND INSPECTED, TESTED AND APPROVED IN WRITING BY A GEOTECHNICAL _ _ _ _ SUB-BASE COURSE IN ACCORDANCE -OP-OP OVERHEAD POWER C� W/Mpyy 2Y34 �, POWER POLE ENGINEER PRIOR TO PLACEMENT OF BASE COURSE MATERIAL __ � OVERHEAD TELEPHONE [� 3. IF UNSTABLE SUBGRADE IS ENCOUNTERED REFER TO GEOTECHNICAL REPORT '� -° -° - UNDERGROUND GAS GUY ANCHOR = a FOR ALTERNATIVE PAVEMENT SECTION. %�/�/-,'%'%�/ %�/ WOVEN GEOTEXTILE FABRIC -2.-2L- UNDERGROUND PHONE OO ELECTRICAL PEDESTAL - 0!� 00 MIRAFI 60OX OR APPROVED EQUAL 4. PAVEMENT SECTIONS SHALL BE CONSTRUCTED PER MONTANA PUBLIC WORKS -` `- UNDERGROUND ELECTRIC ® ELECTRICAL METER i STANDARD SPECIFICATIONS (MPWSS) AND GEOTECHNICAL REPORT. OMPACTED SUBGRADE - - ROAD CENTERLINE ® TELEPHONE PEDESTAL 5. ASPHALT CONCRETE SHALL BE COMPACTED TO A MINIMUM OF 97%OF �2�DETAII. ® GAS METER SHEET CURB & GUTTER MARSHALL BULK DENSITY. GlA REINFORCED CONCRETE SLAB EDGE OF PAVEMENT D4 GAS VALVE C1,0 6. SUB-BASE, BASE COURSE &SUBGRADE SHALL BE COMPACTED TO 95%PER ------ EDGE OF GRAVEL 0 TEST PIT ASTM 1557 I DEZ+♦�� EDGE OF CONCRETE C BERG TEST TOWN PUMP 6I OUNCE p o TYPICAL PAVEMENT SECTION- EDGE OF BUILDING TREE CONIFER (SIZE AS NOTED) SITE PLAN COMMERCIAL PARKING LOT- STABLE SUBGRADE ` ` UNDERGROUND GAS t TREE DECIDUOUS (SIZE AS NOTED) i PROJECT:18-117 -oP-OP- UNDERGROUND ELECTRIC a DATE:08/11/20