TP#6 LOUNGE
INDEX OF DRAWINGS
SHEET#- CONTENT
COVER
CIVIL
C0.1 - CONSTRUCTION MANAGEMENT PLAN
C0.2 - OVERALL MASTER SITE PLAN
C1.0 - SITE PLAN
_ C1.1 - DIMENSION PLAN
C1.2 - GRADING&DRAINAGE PLAN
C1.3 - MASTER SITE PLAN
EXT B- MASTER PHASING SITE PLAN
LANDSCAPING
1,000 - PHASE LANDSCAPE PLAN
L001 - TP LANDSCAPE
1` L002 - LANDSCAPESCHEDULES
L300 - PLANTING PLAN
1,500 - PLANTING DETAILS
' y L501 - PLANTING DETAILS
�G• _ L600 - IRRIGATION PLAN
L700 - IRRIGATION DETAILS
L701 - IRRIGATION DETAILS
ARCHITECTURAL
AC2.1- SITE PLAN
A2.0 - BUILDING PLANS
A2.3 - AREA PLANS
A3.0 - BUILDING ELEVATIONS
A3.1 - BUILDING ELEVATIONS
R A3.2 - MATERIAL BOARD
A7.2 - REFUSE DETAILS
A7.3 - SMOKE SHELTER DETAILS
------_—_ _ _ ELECTRICAL
SE1.1- SITE ELECTRICAL
E1.1 - SITE PHOTOMETRICS
PROJECT INFORMATION VICINITY MAP PROJECT TEAM PROJECT SITE NARATIVE
PROPERWOWNER: ARCHITECT ZONING:112-COMMERCIAL,M-1 ZONING WITHIN 200 FT.ON EAST SIDE OF 19TH AVE.
BOZEMAN 6 LLC LOCATI ARCHITECTS LOT 4/PHASE II AREA: 323,039 SF GROSS 7.393 ACRES
600 MAIN STREET 1007 E.MAIN ST.SUITE 202
BOZEMAN,MT TP LOUNGE PHASE AREA: 47,480 SF 100%
BUTTE,MT 59701 EXISTING BUILDING AREA: 0 SF 0%
406-497-6860 CONTACT: Thomas Brown PROPOSED FAR AREA: 6,700SF 14.1%
(P)
PROPOSED BUILDING ADDRESS: IE) 406-587-1139 tbrown@LOCATIARCHITECTS.COM DRIVEWAY/PARKING AREA: 22,487 SF 47.4%
2003 KIMBERWICKE STREET CATTAIL ST LANDSCAPED AREA: 4,824 SF 10.2%
CIVIL ENGINEER
BOZEMAN,MT 59715
MADISON ENGINEERING,LLC
895 Technolagy Boulevard,Suite 203 FLOOD PLAIN: PER FEMA MAP THERE IS NO FLOOD PLAIN
BOZEMAN,MT 59718
LEGAL DESCRIPTION: CONTACT: Chris Budeski PAYBACK DISTRICTS: THERE ARE NO SID AREAS SHOWN PAYBACK DISTRICTS.
(P) 406-587-0262
LOTS 201,202 AND 203,BLACK BULL SUBDIVISION E) chri,@mad-eag.o0m
LOCATED[NNW 1/4 OF SECTION 7,T.2 S.,R.5 E.OF P.M.M., CASH IN LEU OF WATER RIGHTS:(SEE WATER RIGHTS MEMO)
GALLATIN COUNTY,MONTANA LANDSCAPE ARCHITECT
BLOCK FRONTAGE:
PROJECT SQUARE FOOTAGE: DESIGN 5 NORTH 19TH AVENUE-GATEWAY
37East Main Simeat
BOZEMAN,MT 59]19715 KIMBERWICKE-LANDSCAPED
MAIN LEVEL UPPER LEVEL TOTAL CONTACT: Troy Scherer
(P) 406-587-4873 VEHICLE PARKING(SEE PARKING SUMMARY)
FINISHED 4,505 SQ.FT. 0,000 SQ.FT. 4,505 SQ.FT. E) tnay@dasign5la.com REQUIRED: 35
MECH./STOR. 143 SQ.FT. 2,052 SQ.FT. 2,195 SQ.FT.
ELECTRICAL ENGINEER AFFORDABLE HOUSING: THE PROJECT IS A COMMERCIAL PROJECT AND IS NOT SUBJECT
AMES ENGINEERING,LLC TO THE AFFORDABLE HOUSING ORDINANCE
STREET AND TRAFFIC:A TRAFFIC STUDY WAS COMPLETED WITH THE SUBDIVISION
CONTACT:Susan H.Ames
(P) 406-431 1926
E) sasaah—@m— PUBLIC PARK: THE PROJECT IS A COMMERCIAL PROJECT AND IS NOT SUBJECT TO PUBLIC
PARK REQUIREMENT
TOTAL 4,648 GSF 2,052 GSF 6,700 GSF
■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ IN ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■
■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ - -j ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■
■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ 9qqm ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■
IM ■ E ■E ■ ENE■ ■ ENE■ ■ ENE■ ■ ENE■ ■ ENE■ ■ ENE■ ■ ENE■ ■ ENE■ ■ ENE■ ■ ENE■ ■ Eq ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■
, ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■ on ■ ENE ■ ■ ENE ■ ■ ENE ■ ■ ENE ■
1007 EAST MAN SU�202 L O C A T
BOZEMAN,MT 59715 pcaErBOrt«rnn
2020 ALL 5C-frS DESERVED
408-587-1139 A R C H I T E C T S =TN-^�°1°N
FA%..587-7389