Loading...
HomeMy WebLinkAbout23 A3.1 Elev Town Pump Lounge 08-12-2020T.O. MAIN PLATE 114' -0" T.O. NE PARAPET 118' -8" T.O. CONCRETE WALL 100' -0" LEVEL 2 T.O. UPPER SUBFLOOR 115' -8" ADEGC A A6.0 T.O. NW PARAPET 121' -8" FI B TRASH ENCLOSURE - MATERIALS TO MATCH BUILDING STANDING SEAM METAL ROOF, BLACK PANEL SIDING G A6.3 H A6.3 109 SEE LANDSCAPING DETAIL 12/L500 FOR BLANK WALL SCREENING STORM OVERFLOW C12X25 C12X20.7 C12X20.7 C12X20.7 C12X25 C12X20.7 T.O. MAIN PLATE 114' -0" T.O. CONCRETE WALL 100' -0" LEVEL 2 T.O. UPPER SUBFLOOR 115' -8" A D E GC A A6.0 T.O. SE PARAPET 126' -4" T.O. SW PARAPET 121' -4" T.O. LEVEL 2 PLATE 123' -8" F IB DOWNSPOUT COLOR: BLACK PANEL SIDING STOREFRONT WINDOW AND DOOR SYSTEM (BLACK FRAMING) G A6.3 H A6.3 102 103 201 202 203 DOOR 113 2' - 1 0 " STORM OVERFLOW C12X25 C12X25 C12X25 C12X20.7 C12X20.7 C12X20.7 C12X20.7 C12X20.7 C12X20.7 C12X20.7 C12X20.7 C 8 X 1 1 . 5 C 8 X 1 1 . 5 TRANSPARENCY CALCULATION: 209 SQ. FT. TOTAL AREA 91 SQ. FT. GLAZING AREA 91 / 209 = .435 = 44% 4' - 0 " 4' - 0 " JERRY D. LOCATI 1543 S A T A T E O F MO NT A N L T I CE N SED AR C H I T E C JO B N o . SH E E T N U M B E R PR O J E C T / O W N E R AR C H I T E C T LO C A T I A R C H I T E C T S 10 0 7 E . M A I N S U I T E 2 0 2 B O Z E M A N M O N T A N A 40 6 - 5 8 7 - 1 1 3 9 F A X 5 8 7 - 7 3 6 9 COPYRIGHT LOCATI ARCHITECTS P.L.L.P. 2012 ALL RIGHTS RESERVED IS S U E DA T E 10 3 1 T. P . # 6 L O U N G E 20 0 3 K i m b e r w i c k e S t . BO Z E M A N , MO N T A N A A3 . 1 8 -12 -20 2 0 SI T E P L A N RE S U B M I T T A L SCALE: 1/4" = 1'-0" NORTH ELEVATION SCALE: 1/4" = 1'-0" SOUTH ELEVATION REVISION SCHEDULE # DATE DESCRIPTION KIMBERWICKE ST.