HomeMy WebLinkAbout20086 Staff Report Staff Report
Gallatin Subaru Site Plan Review
Application 20086
Tuesday, August 11, 2020
Page 1 of 15
Application No. 20086 Type Site Plan
Project Name Gallatin Subaru
Summary A 32,054 square foot sales and service Subaru dealership on east frontage road. The
development on the 4.2-acre lot will also include site improvements for parking and vehicle
display and storage. The project is bound to the south by I-90 and to the north by East
Frontage Rd and will share a drive access with the Audi/VW dealership directly to the East.
All existing structures on site are proposed to be demolished.
Zoning M-1 Growth
Policy
Industrial Parcel Size 4.24 Acres
Overlay District(s) N/A
Street Address 31910 Frontage Rd.
Legal Description Minor Sub 450, S09, T02 S, R06 E, Lot 1, Acres 4.24, City of Bozeman, Gallatin County,
Montana.
Owner D&G Investments LLLP, 31910 E. Frontage Rd, Bozeman, MT 59715
Applicant Gallatin Motor Company, 31910 E. Frontage Rd, Bozeman, MT 59715
Representative H & R Construction, 307 E. 39th St., South Sioux City, NE 68776
Staff Planner Danielle Garber Engineer Anna Russell
Noticing Public Comment Period Site Posted Adjacent Owners
Mailed
Newspaper Legal Ad
7/13/2020 to 7/28/2020 6/11/2019 7/13/2020 N/A
Advisory Boards Board Date Recommendation
DRC July 7, 2020 None, adequacy determination
Recommendation Approval
Decision Authority Director of Community Development Date:
Full application and file of record: Community Development Department, 20 E. Olive St., Bozeman, MT 59715
Staff Report
Gallatin Subaru Site Plan Review
Application 20086
Tuesday, August 11, 2020
Page 2 of 15
FINDINGS OF FACT AND APPEAL PROVISIONS CERTIFICATE
A) PURSUANT to Chapter 38, Article 2, Bozeman Municipal Code (BMC), and other applicable sections of Ch.38, BMC, public
notice was given, opportunity to submit comment was provided to affected parties, and a review of the Site Plan described in
this report was conducted. The applicant proposed to the City a Site Plan (SP) to permit a new sales and service dealership
for Gallatin Subaru located in the M-1 zoning district. The purposes of the Site Plan review is to consider all relevant evidence
relating to public health, safety, welfare, and the other purposes of Ch. 38, BMC; to evaluate the proposal against the criteria
of Sec. 38.230.100 BMC, and the standards of Ch. 38, BMC; and to determine whether the application be approved,
conditionally approved, or denied.
B) It appeared to the Director that all parties and the public wishing to examine and offer comment on the proposed Site Plan
were provided the opportunity to do so. After receiving the recommendation of the relevant advisory bodies established by Ch.
38, Art. 210, BMC, and considering all matters of record presented with the application and during the public comment period
defined by Ch. 38, BMC, the Director has found that the proposed Site Plan would comply with the requirements of the BMC if
certain conditions were imposed. Therefore, being fully advised of all matters having come before them regarding this
application, the Director makes the following decision.
C) The Site Plan has been found to meet the criteria of Ch. 38, BMC, and is therefore approved, subject to the conditions listed
in this report and the correction of any elements not in conformance with the standards of the Title. The evidence contained in
the submittal materials, advisory body review, public testimony, and this report, justifies the conditions imposed on this
development to ensure that the Site Plan complies with all applicable regulations, and all applicable criteria of Ch. 38, BMC.
On this ______ day of ________________, 2020, Martin Matsen, Director of Community Development, approved with
conditions this Site Plan for and on behalf of the City of Bozeman as authorized by Sec. 38.200.010, BMC.
D) This project decision made by the Director of Community Development may be appealed by filing a documented appeal
and paying an appeal fee to the Clerk of the Commission for the City of Bozeman within 10 working days after the date of the
final decision as evidenced by the Director’s signature, following the procedures of Sec. 38.250.030, BMC.
DIRECTOR OF COMMUNITY DEVELOPMENT
Staff Report
Gallatin Subaru Site Plan Review
Application 20086
Tuesday, August 11, 2020
Page 3 of 15
CONDITIONS OF APPROVAL
Please note that these conditions are in addition to any required code provisions identified in this report. Additional conditions
of approval and code corrections are required and will be included with the final report provided to the Director of Community
Development.
Recommended Conditions of Approval:
1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as
conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the
Bozeman Municipal Code or state law.
2. Modification Application #20211 received approval to limit construction of the shared drive access between the
subject property and the Bozeman Audi property directly to the east. Per that approval, an exhibit must be
provided prior to building permit approval for the subject property detailing the extent of the drive access to be
completed with this site plan approval.
3. Prior to final plan approval, provide final water usage numbers to determine if a cash-in-lieu of water rights
payment is required.
4. If not already filed for the subject site, the applicant will need to provide and file with the county clerk and
recorder's office executed waivers of right to protest creation of special improvement districts (sid’s) for the
following:
a. Street improvements to Frontage Road including paving, curb/gutter, sidewalk, and storm drainage.
Staff Report
Gallatin Subaru Site Plan Review
Application 20086
Tuesday, August 11, 2020
Page 4 of 15
Figure 1: Current Zoning and Vicinity Map
Staff Report
Gallatin Subaru Site Plan Review
Application 20086
Tuesday, August 11, 2020
Page 5 of 15
Figure 2: Site Plan
Figure 3: North Elevation (facing East Frontage Rd.)
Staff Report
Gallatin Subaru Site Plan Review
Application 20086
Tuesday, August 11, 2020
Page 6 of 15
Figure 4: South Elevation (facing I-90)
Figure 5: East Elevation
Figure 6: West Elevation
Staff Report
Gallatin Subaru Site Plan Review
Application 20086
Tuesday, August 11, 2020
Page 7 of 15
Figure 7: Landscaping Plan
Staff Report
Gallatin Subaru Site Plan Review
Application 20086
Tuesday, August 11, 2020
Page 8 of 15
ANALYSIS AND FINDINGS
Analysis and resulting recommendations based on the entirety of the application materials, municipal codes, standards,
plans, public comment, and all other materials available during the review period. Collectively this information is the record
of the review. The analysis in this report is a summary of the completed review.
Plan Review, Section 38.230.100, BMC
In considering applications for plan approval under this title, the Director of Community Development shall consider the
following:
1. Conformance to and consistency with the City’s adopted growth policy
38.100.040 B
Meets Code?
Growth Policy Land Use Industrial Yes
Zoning M-1, Light Manufacturing District Yes
Comments: The uses are allowed within the zoning district. The property is within the City’s municipal service
area. Staff finds that the project does contribute to the overall goals of the growth policy.
2. Conformance to this chapter, including the cessation of any current
violations 38.200.160
Meets Code?
Current Violations None Yes
Comments: There are no current violations on the subject property.
3. Conformance with all other applicable laws, ordinances, and regulations
38.100.080
Meets Code?
Conflicts None Yes
Condominium ownership NA NA
Comments: The proposed uses of the site are consistent with the allowed uses of the M-1 district. No
specific conflicts identified. Additional steps will be required including but not limited to the approval of
building permits. The Building Division of the Department of Community Development will review the
requirements of the International Building Code for compliance at the time of building permit application.
4. Conformance with Plan Review for applicable permit types as specified in
article 2 Section 38.230
Meets Code?
Site Plan Yes
Comments: The Site Plan criteria are met with this project.
5. Conformance with zoning provisions of article 3 38.320.100 Meets Code?
Permitted uses 38.310 Apartments Yes
Form and intensity standards 38.320 Yes
Zoning
M-1 Setbacks
(feet)
Structures Parking /
Loading
Yes
Front 20’ – Block Frontage NA
Rear 3’ NA
Side 3’ NA
Alley NA NA
Comments: The proposed setbacks meet all M-1 zone district standards with a 20-foot setback off East
Frontage Rd, 3-feet on the south, east and west sides with a 30-foot shared access easement on the
east side. 20-foot utility easements exist along the east, west and south property lines. No additional
setbacks for parking and loading areas is required in M-1 zoning.
Staff Report
Gallatin Subaru Site Plan Review
Application 20086
Tuesday, August 11, 2020
Page 9 of 15
Relationship to adjacent properties standards 38.520.030 (light and air access and
privacy) and angled setback plane 38.360.030
NA
Applicable zone specific or overlay standards 38.330-340 NA
Building Height Requirements 38.320.010-.060 Yes
Lot coverage 15.7% Allowed 100%
Height 27’10” Allowed 45’ Yes
Comments: Lot coverage and height meet standards for the M-1 zoning district.
General land use standards and requirements 38.350 Yes
Comments: No encroachments are proposed.
Applicable supplemental use criteria 38.360 Yes
Supplemental
uses/type
Automobile Repair 38.360.070 / Outdoor Sales & Display
38.360.190
Yes
Comments: All automobile repair activities are to be performed within the building meeting Section
38.360.070. The outdoor vehicle display areas are located along the East Frontage Road and I-90
frontages and do not exceed 50% of the total lot area per Section 38.360.190. The open sales lots
compromise 19.7% of the total lot area.
Wireless facilities 38.370 NA
Affordable Housing 38.380.010 NA NA
Affordable housing plan NA
Comments: NA
6a(1). Conformance with the community design provisions of article 4:
Transportation facilities and access 38.400
Meets Code?
Street vision Yes Yes
Secondary access Yes
Traffic Impact Study
/ LOS
Waived Transportation grid
adequate to serve site
Yes Yes
Comments: Traffic impact study waiver was provided from the City of Bozeman and the Montana
Department of Transportation, East Frontage Rd. is also MDT Highway 20. The south side of the highway
is annexed into the City of Bozeman and the north side remains in Gallatin County.
Street dedication NA Yes
Drive access locations and widths Yes
Number of drive accesses 2 Yes
Street easements NA
Special Improvement Districts (SID) NA NA
Comments: The project is not located within any SID’s. Engineering and Fire Department staff reviewed
the drive accesses for compliance with code.
Parking requirements of 38.540
Required parking nonresidential 94 Yes
Required parking residential NA
Reductions nonresidential NA
Reductions residential NA
Provided parking off street 117
On street parking 0
Parking meets minimum requirements with required spaces for the sales office, service stalls, and
outdoor vehicle display. A floor area determination matrix was provided per Section 38.540.010 excluding
the following areas from the gross floor area: storage areas, technical service (repair stalls), circulation
Staff Report
Gallatin Subaru Site Plan Review
Application 20086
Tuesday, August 11, 2020
Page 10 of 15
areas, enclosed areas used for parking vehicles, bathrooms, kitchens, break rooms, and stairways and
elevators.
6a(2). Conformance with the community design provisions of article 4:
Pedestrian and vehicular ingress and egress 38.400
Meets Code?
Design of the pedestrian and vehicular circulation systems to assure that pedestrians
and vehicles can move safely and easily both within the site and between properties
and activities within the neighborhood area
Yes
Vehicle accesses to site 2 Yes
Pedestrian access location(s) Yes
Site vision triangles Yes
Fire lanes, curbs, signage and striping Yes
Non-automotive transportation and circulation systems, design features to enhance
convenience and safety across parking lots and streets, including, but not limited to
paving patterns, grade differences, landscaping and lighting
Yes
Crosswalks Yes
Curb ramps Yes
Pedestrian lighting Yes
Comments: Site lighting is provided in the vehicle display areas and is compliant with the car dealership lighting
requirements of Section 38.570.040.C including maximum footcandles and uniformity ratios. Building mounted
lighting, including lighting at building entrances meets the standards of this section and all fixtures are full cutoff
compliant.
Adequate connection and integration of the pedestrian and vehicular transportation
systems to the systems in adjacent development and the general community
Yes
Access easements Access and Utility Easement Yes
Dedication of right-of-way or easements necessary for pedestrian, shared use
pathway and similar transportation facilities
NA
Comments: A shared access on the east side of the lot with a joint access easement shared with the
Audi/VW Dealership (Lot 2) was recorded February 4, 2019 under document number 2637210.
Pedestrian circulation include pathways with crosswalks to the lots in the east and west, and connections
to the vehicle display areas from the building.
6a(3) Loading and Unloading areas Meets Code?
Loading and unloading area requirements 38.540.080 Yes
Loading and unloading Yes Yes
First Berth (min. 70 feet
length, 12 feet in width and
14 feet in height)
Yes Yes
Additional Berths (min. 45
feet length)
NA NA
Comments: A loading berth is provided on the southwest corner of the lot adjacent to the parts and service
area and is meeting minimum standards.
6b Community design and element provisions 38.410 Meets Code?
Lot and block standards 38.410.040 Yes
Rights of way for pedestrians alternative block delineation NA
Comments: Project meets block length standards.
Provisions for utilities including efficient public services and utilities 38.410.050-060 Yes
Municipal infrastructure requirements Yes
Staff Report
Gallatin Subaru Site Plan Review
Application 20086
Tuesday, August 11, 2020
Page 11 of 15
Easements (City and public utility rights-of-way etc.) Yes
Water, sewer, and stormwater Yes
Other utilities (electric, natural gas, communications) Yes
CIL of water Yes
Comments: Condition of approval 3 requires the applicant to confirm with final usage numbers that no
additional CIL of water is required prior to final plan approval. Utility service line locations and design was
reviewed by Bozeman Engineering and Northwestern Energy for functionality and compliance with adopted
standards.
Site Surface Drainage and stormwater control 38.410.080 Yes
Location, design and capacity Yes
Landscaping per 38.410.080.H Yes
Comments: The water, sewer and drainage plans were reviewed by Engineering Staff for compliance.
Grading 38.410.080 Yes
Maximum 1:4 slope requirements met Yes
Comments: Grading and drainage plans were reviewed by Engineering Staff. Three detention ponds are
proposed on site. These ponds are located in the required front setback along East Frontage Rd. Per
Section 38.410.080.F stormwater facilities generally must not occupy more than one-third of a required front
setback. A departure was reviewed and granted by Engineering and Stormwater Staff.
6c. Park and recreation requirements 38.420 Meets Code?
Enhancement of natural environment NA
Wildlife habitat or feeding area preservation NA
Maintenance of public park or public open space access NA
Park/Recreational area design NA
Parkland Cash-in-lieu for maximum known density not to exceed 12
units/acre (ac.).
NA
____ ac. X ____units/ac. X 0.03 ac.= ____ ac.
Cash donation in-lieu(CIL) NA NA
Improvements in-lieu NA NA
Comments: NA, commercial application no dwelling units provided.
7a-c. Conformance with the project design provisions of Article 5,
Compatibility, Design and Arrangement
Meets Code?
Compatibility with, and sensitivity to, the immediate environment of the site and the
adjacent neighborhoods and other approved development relative to architectural
design, building mass, neighborhood identity, landscaping, historical character,
orientation of buildings on the site and visual integration
Yes
Block Frontage Standards 38.510 Yes
Building Design 38.530 Yes
Location and design of service areas and mechanical equipment 38.520.070 Yes
Comments: Project meets requirements for parking location and building entrances. Blank walls were
mitigated through the design review process. Roof top mechanical equipment is screened with parapet and
metal siding.
Design and arrangement of the elements of the plan (e.g., buildings, circulation, open
space and landscaping, etc.) so that activities are integrated with the organizational
scheme of the community, neighborhood, and other approved development and produce
an efficient, functionally organized and cohesive development.
Yes
Relationship to adjacent properties 38.520.030 Yes
Staff Report
Gallatin Subaru Site Plan Review
Application 20086
Tuesday, August 11, 2020
Page 12 of 15
Non-motorized circulation and design 38.520.040 Yes
Vehicular circulation and parking 38.520.050 Yes
Comments: Project conforms to requirements. Pedestrian connections with crosswalks to adjacent
properties is provided. All walkways meet the width requirements in this section with adjacent landscaping
strips between walkways and buildings.
Design and arrangement of elements of the plan (e.g., buildings circulation, open
space and landscaping, etc.) in harmony with the existing natural topography, natural
water bodies and water courses, existing vegetation, and to contribute to the overall
aesthetic quality of the site configuration
Yes
Site Planning and Design Elements 38.520 Yes
Comments: Project conforms to requirements
Landscaping Yes
7d. Conformance with the project design provisions of Article 5, Landscaping
including the enhancement of buildings, appearance of vehicular use, open
space and pedestrian area and the preservation of replacement of natural
vegetation
Meets Code?
Submittal requirements for landscape plans 38.220.100 Yes
Mandatory landscaping 38.550.050 Yes
Yard Yes
Additional screening Yes
Parking lot screening Yes
Interior parking lot landscape Yes
Off-street loading spaces screening Yes
Street frontage Yes
Street median island NA
Acceptable landscape materials Yes
Protection of landscape areas Yes
Irrigation: plan, water source, system
type
Yes
Trees for residential adjacency NA
City rights-of-way and parks Yes
Tree plantings for boulevard ROW, drought-resistant seed NA
Public ROW boulevard strips NA
Irrigation and maintenance provisions for ROW Yes
State ROW landscaping Yes
Additional NA NA
Fencing and walls NA NA
Comments: Street trees are provided along the property line per MDT landscaping review. Additional
landscape screening is provided along the interstate to screen parking areas.
Site planning and design required 38.520 Yes
Pedestrian area landscaping, including pathways and internal circulation 38.520.040 Yes
Internal roadway landscaping 38.520.050 NA
Open space landscaping 38.520.060 NA
Service area and mechanical equipment landscaping and screening 38.520.070 Yes
Open space NA
Comments: No public sidewalk currently exists along East Frontage Rd; the internal sidewalks lining the
provide opportunity for future connections to the west property, sidewalks connecting to the east property
Staff Report
Gallatin Subaru Site Plan Review
Application 20086
Tuesday, August 11, 2020
Page 13 of 15
7g. Conformance with the project design provisions of Article 5, Signage
38.560
Meets Code?
Allowed (sq. ft)/building 250 sf Yes
Proposed (sq. ft) 221.77 sf
Comment: A maximum 250 square feet per lot is allowed in the M-1 district. The proposed freestanding
signage is shown setback 15-feet from the property line, and is shown to be 13-feet tall from grade to the
top of the sign. Building mounted signage is also proposed on all elevations.
8a-c. Conformance with environmental and open space objectives in articles 4-
6 Meets Code?
Enhancement of natural environment: Integrated stormwater, LID, removal of
inappropriate fill
Yes
Grading Yes
On-site retention/detention Yes
Comments: All stormwater facilities have been reviewed for compliance by Engineering and Planning staff.
The stormwater ponds were determined to be LID and of exceptional design and a departure was approved
by the Engineering Division on July 2, 2020.
Drainage design Yes
Stormwater maintenance plan 38.410.030.A Yes
Stormwater feature: landscaping amenity, native species, curvilinear, 75% live
vegetation
Yes
Comments: Detention ponds will be lined with native seed mix, with native shrubs and plantings along the
upper edges.
Watercourse and wetland protections and associated wildlife habitats Yes
If the development is adjacent to an existing or approved public park or public open
space area, have provisions been made in the plan to avoid interfering with public
access to and use of that area
NA
Comments: See below discussion regarding wetlands.
9. Conformance with the natural resource protection provisions of articles 4-6 Meets Code?
Watercourse setback 38.410.100 NA
Watercourse setback planting plan NA
where Bozeman Audi/VW has been built comply standards. Landscaping including yards, stormwater
facilities, street trees, and foundation plantings between walkways and the building meet standards.
7e. Conformance with the project design provisions of Article 5, Open Space Meets Code?
Open Space Section 38.520.060 NA
Total required NA NA
Total provided NA NA
Comments: No commercial open space is required for industrial districts.
7f. Conformance with the project design provisions of Article 5, Lighting
38.570
Meets Code?
Building-mounted lighting (cutoff and temperature) Yes
Site lighting (supports, cutoff and temperature) Yes
Minimum light trespass at property line Yes
Comments: The proposed site lighting meets standards. See discussion in section 6a2
Staff Report
Gallatin Subaru Site Plan Review
Application 20086
Tuesday, August 11, 2020
Page 14 of 15
Floodplain regulations 38.600 NA
Wetland regulations 38.610 Yes
Comments: A wetland delineation and functional assessment was provided. Only wetlands are present along
the I-90 ditch line, no wetland areas will be disturbed with the proposed project.
10. Other related matters, including relevant comment from affected parties
38.220
Meets Code?
Public Comment No Yes
Comments: No public comments received. The public comment period is detailed on page 1
11. If the development includes multiple lots that are interdependent for
circulation or other means of addressing requirement of this title, whether the
lots are either: Configured so that the sale of individual lots will not alter the
approved configuration or use of the property or cause the development to
become nonconforming OR Are the subject of reciprocal and perpetual
easements or other agreements to which the City is a party so that the sale of
individual lots will not cause one or more elements of the development to
become nonconforming. 38.410.060
Meets Code?
Subdivision exemption NA NA
Required Easements NA NA
Reciprocal access and
shared parking easement
NA NA
Mutual access easement
and agreement
Yes Doc #2637210 NA
Comments: A shared access and utility easement along the eastern property boundary was reviewed and
approved by the City and MDT and recorded in February 2019.
12. Phasing of development 38.230.020.B including buildings and
infrastructure
Meets Code?
Phasing No # of phases 1 Yes
Comments: Project to be completed in one phase.
13. Standards for certificate of appropriateness 38.340.050 Meets Code?
Certificate of appropriateness standards NA
Secretary of the Interiors Standards for new construction NA
Architectural appearance NA
Proportion of doors and windows NA
Relationship of building masses and spaces NA
Roof shape NA
Scale NA
Directional expression, with regard to the dominant horizontal or vertical expression
of surrounding structures
NA
Architectural details NA
Concealment of non-period appurtenances, such as mechanical equipment NA
Materials and color schemes NA
Comments: NA
14. Conformance with the Neighborhood Conservation Overlay District Design
(NCOD) Guidelines
Meets Code?
Overlay District Provisions NA
Staff Report
Gallatin Subaru Site Plan Review
Application 20086
Tuesday, August 11, 2020
Page 15 of 15
Comments: The proposed project is not located within the NCOD.
Introduction NA
Chapter 2: Guidelines for all properties NA
Chapter 4b: Guidelines for commercial areas outside of Main Street Historic District NA
Appendices NA
Comments: NA
15. NCOD Demolition 38.340.080 Review of Demolition of historic structures or
sites
Meets Code?
Historic Structure per 38.700.090 NA NA
Comments: NA
Approval of the proposed subsequent development is required for all historic
structures proposed for demolition and for the proposed movement of any structure
of site.
NA
Public Notice NA
Criteria NA