HomeMy WebLinkAbout20- Change Order 1 - Martel Construction - Bogert Pavilion RenovationPage 1 of 2 N:\0417\083 - Bogert Roof\06 Construction\CO (Change Orders)\Change Order #1\25 COB Change Order Form - Bogert CO#1.doc CHANGE ORDER No. 1 DATE OF ISSUANCE 6/24/20 EFFECTIVE DATE 6/24/20 OWNER City of Bozeman CONTRACTOR Martel Construction Contract: Bogert Pavilion - GMP Amendment 2 Project: Bogert Pavilion Renovation OWNER's Contract No. 181901 ENGINEER Morrison Maierle ENGINEER's Contract No. April 1st, 2019 You are directed to make the following changes in the Contract Documents: Description: Changes to the shoring connection and connection of the steel beam to GLB per ESI #1 (attached) Reason for Change Order: Update to connections per ESI #1, the additional cost for the connections is being requested the contingency be used to cover the additional items. Attachments: (List documents supporting change) CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $ 696,714 Original Contract Times: Substantial Completion: 9/9/20 Ready for final payment: 9/9/20 (days or dates) Net Increase (Decrease) from previous Change Orders No. to : $ 0 Net change from previous Change Orders No. to No. : N/A Substantial Completion: Ready for final payment: (days) Contract Price prior to this Change Order: $ 696,714 Contract Times prior to this Change Order: Substantial Completion: 9/9/20 Ready for final payment: 9/9/20 (days or dates) Net increase (decrease) of this Change Order: $ 16,745 (to be used from Contingency) Net increase (decrease) this Change Order: Substantial Completion: 5 Ready for final payment: 5 (days) Contract Price with all approved Change Orders: $ 696,714 Contract Times with all approved Change Orders: Substantial Completion: 9/14/20 Ready for final payment:9/14/20 (days or dates) Contractor certifies and agrees that there are no additional costs or claims for extra work, additional time, delays or omitted items, of any nature whatsoever, associated with the subject change order items, except as identified and set forth herein and unless expressly stated otherwise in the Change Order. And further, that the price agreed-upon herein represents the full cost and value for the subject work performed and the materials supplied under the terms of the contract and that the work quantities and value were properly determined and are correct. CONTRACTOR (Authorized Signature) Date 6/24/20 RECOMMENDED BY: APPROVED BY: DocuSign Envelope ID: 451FB4B0-2489-4539-A19B-9D90FAF45401 Page 2 of 2 N:\0417\083 - Bogert Roof\06 Construction\CO (Change Orders)\Change Order #1\25 COB Change Order Form - Bogert CO#1.doc 6/24/20 (ENGINEER - Signature) Date OWNER (Authorized Signature) Date CHANGE ORDER INSTRUCTIONS A. GENERAL INFORMATION This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into a subsequent Change Order if they affect Price or Times. Changes that affect Contract Price or Contract Times should be promptly covered by a Change Order. The practice of accumulating Change Orders to reduce the administrative burden may lead to unnecessary disputes. If Milestones have been listed in the Agreement, any effect of a Change Order thereon should be addressed. For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Times, a Field Order should be used. B. COMPLETING THE CHANGE ORDER FORM Engineer normally initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from Owner, or both. Once Engineer has completed and signed the form, all copies should be sent to Owner or Contractor for approval, depending on whether the Change Order is a true order to the Contractor or the formalization of a negotiated agreement for a previously performed change. After approval by one contracting party, all copies should be sent to the other party for approval. Engineer should make distribution of executed copies after approval by both parties. If a change only applies to price or to times, cross out the part of the tabulation that does not apply. DocuSign Envelope ID: 451FB4B0-2489-4539-A19B-9D90FAF45401 06.24.20 City of Bozeman Bozeman, Montana 59715 ATTN: Jon Henderson Martel COR # 01 PROJECT: Bogert Pavilion Repairs SUBJECT: Reinforcing and Shoring REFERENCE: ESI #1 Dear Jon: We propose to provide all labor, materials, and equipment required to perform the above mentioned work. Our lump sum quotation is based on our interpretation of the instructions and scope of work identified by the Proposal Request(s). If we have misinterpreted this information in any way (omissions, etc.) please advise us prior to processing this quotation into a formal Change Order. Other wise, our interpretation shall stand as correct. We have not been directed to proceed with the work. At this time, we are hereby requesting 3 calendar days for a time extension Please note this proposal is valid until 6/24/20. Approval beyond that date may result in additional costs or delays. Our proposal is based on receipt of a signed Change Order within (25) calendar days. We are requesting an Adjustment to the Project lump sum for the amount of: 16,745.00 $ If you have any questions, please call me at (406) 600-4057 Sincerely, MARTEL CONSTRUCTION, INC. John Kalmon Enclosure(s) CC. File DocuSign Envelope ID: 451FB4B0-2489-4539-A19B-9D90FAF45401 ENGINEER’S SUPPLEMENTAL INSTRUCTION ESI #1 Date: June 21, 2020 Job Number: 0417.083 Project: Bogert Park Pavilion Renovation Issued To: Martel Construction Regarding: Connection of the steel beam saddle to the existing interior and exterior GLB per detail 2/S300 to include additional bolts and side plate reinforcing to resist a reversal in the forces seen by the beams due to an unbalance snow condition if the snow slides off one side. The reinforcing will resist the load reversal until compression forces can help resist the load reversal. Information: Provide (10) additional 1” dia. ASTM A307 through bolts in 2 rows of (5) with the first row starting 3” below the top of the GLB, and the second row starting 4”. Space the bolts at 3” O.C. The minimum saddle required for the new bolts shall be ¼” thick, by 1’-8” long and 12” deep each side of beam and welded to the original saddle. The below shoring detail is acceptable, as an alternative. Attachments: None Issued By: Morrison Maierle Inc By: Jay Fischer Date: 06-21-20 End of Engineer’s Supplemental Instructions DocuSign Envelope ID: 451FB4B0-2489-4539-A19B-9D90FAF45401 Ma r t e l C o n s t r u c t i o n Sp r e a d s h e e t R e p o r t Page 1 Bo g e r t P a v i l i o n R e n o v a t i o n - C O # 1 S h o r i n g & R e i n f o r c e m e n t R 4 6/24/2020 10:05 AM Gr o u p Ph a s e De s c r i p t i o n Ta k e o f f Q u a n t i t y La b o r A m o u n t Ma t e r i a l A m o u n t Su b A m o u n t Eq u i p A m o u n t Ot h e r A m o u n t Total Amount 01 - 0 0 0 0 GE N E R A L R E Q U I R E M E N T S 1 01 - 0 1 5 0 Pr o j e c t M a n a g e m e n t 2 Pr o j e c t M a n a g e r 20 . 0 0 hr 99 6 - - 996 3 P r o j e c t M a n a g e m e n t 99 6 996 01 - 6 1 2 0 Eq u i p m e n t R e n t a l 4 Sh o r i n g p o s t , j a c k , c a b l e , t e n s i o n e r s 1. 0 0 ea - - 1, 8 4 0 - 1,840 5 E q u i p m e n t R e n t a l 1, 8 4 0 1,840 01 - 7 0 1 0 La y o u t 6 La y o u t 1. 0 0 hr 42 1 - 5 - 47 7 L a y o u t 42 1 5 47 G E N E R A L R E Q U I R E M E N T S 1, 0 3 8 1 1, 8 4 0 5 2,883 02 - 0 0 0 0 EX I S T I N G C O N D I T I O N S 8 02 - 2 2 0 0 Se l e c t i v e D e m o l i t i o n 9 Sh o r e T y p i c a l G l u l a m B e a m s f o r S p l i c e s (1 8 . 0 0 ) ea * (4 , 8 6 0 ) - - - (4,860) 10 Sh o r e B e a m s a t W a r m i n g A r e a (2 . 0 0 ) ea * (5 4 0 ) - - - (540) 11 Cu t B a c k R o o f i n g / S h e a t h i n g - 6 4 " S t r i p 91 7 . 0 0 sf 32 0 - - - - 320 12 Re m o v e W o o d I J o i s t s 20 . 0 0 ea 83 8 - - - - 838 13 S e l e c t i v e D e m o l i t i o n 1, 1 5 9 (5 , 4 0 0 ) (4,241) E X I S T I N G C O N D I T I O N S 1, 1 5 9 (5 , 4 0 0 ) (4,241) 05 - 0 0 0 0 ST E E L 14 05 - 1 2 0 0 St r u c t u r a l S t e e l 15 Sh o r i n g s a d d l e & s p l i c e p l a t e s 20 . 0 0 ea 41 9 3, 7 9 2 - 4,211 16 Re i n f o r c e m e n t s a d d l e & s p l i c e p l a t e s 20 . 0 0 ea 41 9 0 3, 7 9 2 0 - 4,211 17 Sh o r i n g c o n n e c t o r - l a b o r 0. 0 0 ea 0 0 0 0 - 0 18 Sh o r i n g c o n n e c t o r - m a t e r i a l 4. 0 0 ea 81 3 - 813 19 We l d s p l i c e p l a t e s 20 . 0 0 ea 1, 6 6 7 0 - 0 - 1,667 20 S t r u c t u r a l S t e e l 2, 5 0 5 8, 3 9 7 10,902 S T E E L 2, 5 0 5 8, 3 9 7 10,902 06 - 0 0 0 0 WO O D & P L A S T I C S 21 06 - 0 6 0 0 Wo o d M a t e r i a l s 22 Dr i l l b i t s 1. 0 0 ls - - 10 0 - 100 23 W o o d M a t e r i a l s 10 0 100 06 - 0 9 0 0 Ha r d w a r e & F a s t e n e r s 24 Bo l t s , n u t s , w a s h e r s - A 3 0 7 40 0 . 0 0 es t - 3, 6 0 0 - - - 3,600 25 H a r d w a r e & F a s t e n e r s 3, 6 0 0 3,600 06 - 1 1 6 0 Ro o f F r a m i n g 26 Sa l v a g e e x i s t i n g s e c o n d j o i s t - m a t 0. 0 0 bf 0 0 - - - 0 27 Ne w s e c o n d j o i s t - m a t 0. 0 0 bf 0 0 - - - 0 28 In s t a l l s e c o n d j o i s t - l a b o r 45 0 . 0 0 bf 75 5 - - - 755 29 R o o f F r a m i n g 75 5 755 06 - 1 6 5 0 Wo o d P a n e l S h e a t h i n g 30 5/ 8 " P l y w o o d R o o f S h e a t h i n g - R o o f E d g e S p l i c e - 6 4 " W i d t h 61 7 . 0 0 sf 92 4 54 3 - - - 1,467 31 W o o d P a n e l S h e a t h i n g 92 4 54 3 1,467 W O O D & P L A S T I C S 1, 6 7 8 4, 1 4 3 10 0 5,921 Do c u S i g n E n v e l o p e I D : 4 5 1 F B 4 B 0 - 2 4 8 9 - 4 5 3 9 - A 1 9 B - 9 D 9 0 F A F 4 5 4 0 1 Ma r t e l C o n s t r u c t i o n Sp r e a d s h e e t R e p o r t Page 2A Bo g e r t P a v i l i o n R e n o v a t i o n - C O # 1 S h o r i n g & R e i n f o r c e m e n t R 4 6/24/2020 10:05 AM Es t i m a t e T o t a l s De s c r i p t i o n Am o u n t To t a l s Ra t e La b o r 6, 3 8 0 Ma t e r i a l (1 , 2 5 7 ) Su b c o n t r a c t 10 , 2 3 7 Eq u i p m e n t 10 5 Ot h e r 15 , 4 6 5 15 , 4 6 5 Ge n e r a l L i a b i l i t y I n s u r a n c e 14 9 0. 8 9 0 % Gr o s s R e c e i p t s T a x 16 7 1. 0 0 0 % Bu i l d e r s R i s k 30 0. 1 8 0 % Bo n d 13 7 0. 8 2 0 % Co n s t r u c t i o n F e e 79 7 5. 0 0 0 % Co n s t r u c t i o n C o n t i n g e n c y 1, 2 8 0 16 , 7 4 5 To t a l 16 , 7 4 5 Th i s i s t h e c o m b i n e d a m o u n t f r o m O w n e r s Co n t i n g e n c y a n d C o n t r a c t o r s C o n t i n g e n c y Do c u S i g n E n v e l o p e I D : 4 5 1 F B 4 B 0 - 2 4 8 9 - 4 5 3 9 - A 1 9 B - 9 D 9 0 F A F 4 5 4 0 1 Ma r t e l C o n s t r u c t i o n Sp r e a d s h e e t R e p o r t Page 1 Bo g e r t P a v i l i o n R e n o v a t i o n - C O # 1 . 1 R e i n f o r c e m e n t O n l y R 4 6/24/2020 10:07 AM Gr o u p Ph a s e De s c r i p t i o n Ta k e o f f Q u a n t i t y La b o r A m o u n t Ma t e r i a l A m o u n t Su b A m o u n t Eq u i p A m o u n t Ot h e r A m o u n t Total Amount 01 - 0 0 0 0 GE N E R A L R E Q U I R E M E N T S 1 01 - 0 1 5 0 Pr o j e c t M a n a g e m e n t 2 Pr o j e c t M a n a g e r 10 . 0 0 hr 49 8 - - 498 3 P r o j e c t M a n a g e m e n t 49 8 498 01 - 6 1 2 0 Eq u i p m e n t R e n t a l 4 Sh o r i n g p o s t , j a c k , c a b l e , t e n s i o n e r s 0. 0 0 ea - - 0 0 - 0 5 01 - 7 0 1 0 La y o u t 6 La y o u t 0. 5 0 hr 21 0 - 3 - 24 7 L a y o u t 21 0 3 24 G E N E R A L R E Q U I R E M E N T S 51 9 0 3 522 02 - 0 0 0 0 EX I S T I N G C O N D I T I O N S 8 02 - 2 2 0 0 Se l e c t i v e D e m o l i t i o n 9 Sh o r e T y p i c a l G l u l a m B e a m s f o r S p l i c e s 0. 0 0 ea * 0 - - - 0 10 Sh o r e B e a m s a t W a r m i n g A r e a 0. 0 0 ea * 0 - - - 0 11 Cu t B a c k R o o f i n g / S h e a t h i n g - 6 4 " S t r i p 91 7 . 0 0 sf 32 0 - - - - 320 12 Re m o v e W o o d I J o i s t s 20 . 0 0 ea 83 8 - - - - 838 13 S e l e c t i v e D e m o l i t i o n 1, 1 5 9 1,159 E X I S T I N G C O N D I T I O N S 1, 1 5 9 1,159 05 - 0 0 0 0 ST E E L 14 05 - 1 2 0 0 St r u c t u r a l S t e e l 15 Sh o r i n g s a d d l e & s p l i c e p l a t e s 0. 0 0 ea 0 0 0 0 - 0 16 Re i n f o r c e m e n t s a d d l e & s p l i c e p l a t e s 20 . 0 0 ea 41 9 0 5, 2 4 0 0 - 5,659 17 Sh o r i n g c o n n e c t o r - l a b o r 0. 0 0 ea 0 0 0 0 - 0 18 Sh o r i n g c o n n e c t o r - m a t e r i a l 0. 0 0 ea 0 0 0 0 - 0 19 We l d s p l i c e p l a t e s 20 . 0 0 ea 1, 6 6 7 0 - 0 - 1,667 20 S t r u c t u r a l S t e e l 2, 0 8 6 5, 2 4 0 7,326 S T E E L 2, 0 8 6 5, 2 4 0 7,326 06 - 0 0 0 0 WO O D & P L A S T I C S 21 06 - 0 6 0 0 Wo o d M a t e r i a l s 22 Dr i l l b i t s 1. 0 0 ls - 0 - 50 - 50 23 W o o d M a t e r i a l s 50 50 06 - 0 9 0 0 Ha r d w a r e & F a s t e n e r s 24 Bo l t s , n u t s , w a s h e r s - A 3 0 7 32 0 . 0 0 es t - 2, 8 8 0 - - - 2,880 25 H a r d w a r e & F a s t e n e r s 2, 8 8 0 2,880 06 - 1 1 6 0 Ro o f F r a m i n g 26 Sa l v a g e e x i s t i n g s e c o n d j o i s t - m a t 0. 0 0 bf 0 0 - - - 0 27 Ne w s e c o n d j o i s t - m a t 0. 0 0 bf 0 0 - - - 0 28 In s t a l l s e c o n d j o i s t - l a b o r 45 0 . 0 0 bf 75 6 0 - - - 756 29 R o o f F r a m i n g 75 6 756 06 - 1 6 5 0 Wo o d P a n e l S h e a t h i n g 30 5/ 8 " P l y w o o d R o o f S h e a t h i n g - R o o f E d g e S p l i c e - 6 4 " W i d t h 61 7 . 0 0 sf 92 4 54 3 - - - 1,467 31 W o o d P a n e l S h e a t h i n g 92 4 54 3 1,467 W O O D & P L A S T I C S 1, 6 8 0 3, 4 2 3 50 5,153 Do c u S i g n E n v e l o p e I D : 4 5 1 F B 4 B 0 - 2 4 8 9 - 4 5 3 9 - A 1 9 B - 9 D 9 0 F A F 4 5 4 0 1 Ma r t e l C o n s t r u c t i o n Sp r e a d s h e e t R e p o r t Page 2A Bo g e r t P a v i l i o n R e n o v a t i o n - C O # 1 . 1 R e i n f o r c e m e n t O n l y R 4 6/24/2020 10:07 AM Es t i m a t e T o t a l s De s c r i p t i o n Am o u n t To t a l s Ra t e La b o r 5, 4 4 3 Ma t e r i a l 3, 4 2 3 Su b c o n t r a c t 5, 2 4 0 Eq u i p m e n t 53 Ot h e r 14 , 1 5 9 14 , 1 5 9 Ge n e r a l L i a b i l i t y I n s u r a n c e 13 6 0. 8 9 0 % Gr o s s R e c e i p t s T a x 15 3 1. 0 0 0 % Bu i l d e r s R i s k 28 0. 1 8 0 % Bo n d 12 6 0. 8 2 0 % Co n s t r u c t i o n F e e 73 0 5. 0 0 0 % Co n s t r u c t i o n C o n t i n g e n c y 1, 1 7 3 15 , 3 3 2 To t a l 15 , 3 3 2 Th i s a m o u n t i s f r o m Ow n e r s C o n t i n g e n c y Do c u S i g n E n v e l o p e I D : 4 5 1 F B 4 B 0 - 2 4 8 9 - 4 5 3 9 - A 1 9 B - 9 D 9 0 F A F 4 5 4 0 1 Ma r t e l C o n s t r u c t i o n Sp r e a d s h e e t R e p o r t Page 1 Bo g e r t P a v i l i o n R e n o v a t i o n - C O # 1 . 2 S h o r i n g O n l y R 4 6/24/2020 10:09 AM Gr o u p Ph a s e De s c r i p t i o n Ta k e o f f Q u a n t i t y La b o r A m o u n t Ma t e r i a l A m o u n t Su b A m o u n t Eq u i p A m o u n t Ot h e r A m o u n t Total Amount 01 - 0 0 0 0 GE N E R A L R E Q U I R E M E N T S 1 01 - 0 1 5 0 Pr o j e c t M a n a g e m e n t 2 Pr o j e c t M a n a g e r 10 . 0 0 hr 49 8 - - 498 3 P r o j e c t M a n a g e m e n t 49 8 498 01 - 6 1 2 0 Eq u i p m e n t R e n t a l 4 Sh o r i n g p o s t , j a c k , c a b l e , t e n s i o n e r s 1. 0 0 ea - - 1, 8 4 0 - 1,840 5 E q u i p m e n t R e n t a l 1, 8 4 0 1,840 01 - 7 0 1 0 La y o u t 6 La y o u t 0. 5 0 hr 21 0 - 3 - 24 7 L a y o u t 21 0 3 24 G E N E R A L R E Q U I R E M E N T S 51 9 0 1, 8 4 0 3 2,362 02 - 0 0 0 0 EX I S T I N G C O N D I T I O N S 8 02 - 2 2 0 0 Se l e c t i v e D e m o l i t i o n 9 Sh o r e T y p i c a l G l u l a m B e a m s f o r S p l i c e s (1 8 . 0 0 ) ea * (4 , 8 6 0 ) - - - (4,860) 10 Sh o r e B e a m s a t W a r m i n g A r e a (2 . 0 0 ) ea * (5 4 0 ) - - - (540) 11 Cu t B a c k R o o f i n g / S h e a t h i n g - 6 4 " S t r i p 0. 0 0 sf 0 - - - - 0 12 Re m o v e W o o d I J o i s t s 0. 0 0 ea 0 - - - - 0 13 S e l e c t i v e D e m o l i t i o n (5 , 4 0 0 ) (5,400) E X I S T I N G C O N D I T I O N S (5 , 4 0 0 ) (5,400) 05 - 0 0 0 0 ST E E L 14 05 - 1 2 0 0 St r u c t u r a l S t e e l 15 Sh o r i n g s a d d l e & s p l i c e p l a t e s 4. 0 0 ea 84 1, 5 1 7 - 1,601 16 Re i n f o r c e m e n t s a d d l e & s p l i c e p l a t e s 0. 0 0 ea 0 0 0 0 - 0 17 Sh o r i n g c o n n e c t o r - l a b o r 0. 0 0 ea 0 0 0 0 - 0 18 Sh o r i n g c o n n e c t o r - m a t e r i a l 4. 0 0 ea 81 3 - 813 19 We l d s p l i c e p l a t e s 0. 0 0 ea 0 0 - 0 - 0 20 S t r u c t u r a l S t e e l 84 2, 3 3 0 2,414 S T E E L 84 2, 3 3 0 2,414 06 - 0 0 0 0 WO O D & P L A S T I C S 21 06 - 0 6 0 0 Wo o d M a t e r i a l s 22 Dr i l l b i t s 1. 0 0 ls - - 50 - 50 23 Pl u g b e a m h o l e s 40 0 . 0 0 ea 55 9 60 0 - - 1,159 24 W o o d M a t e r i a l s 55 9 60 0 50 1,209 06 - 0 9 0 0 Ha r d w a r e & F a s t e n e r s 25 Bo l t s , n u t s , w a s h e r s - A 3 0 7 80 . 0 0 es t - 72 0 - - - 720 26 H a r d w a r e & F a s t e n e r s 72 0 720 06 - 1 1 6 0 Ro o f F r a m i n g 27 Sa l v a g e e x i s t i n g s e c o n d j o i s t - m a t 0. 0 0 bf 0 0 - - - 0 28 Ne w s e c o n d j o i s t - m a t 0. 0 0 bf 0 0 - - - 0 29 In s t a l l s e c o n d j o i s t - l a b o r 0. 0 0 bf 0 0 - - - 0 30 06 - 1 6 5 0 Wo o d P a n e l S h e a t h i n g 31 5/ 8 " P l y w o o d R o o f S h e a t h i n g - R o o f E d g e S p l i c e - 6 4 " W i d t h 0. 0 0 sf 0 0 - - - 0 32 W O O D & P L A S T I C S 55 9 1, 3 2 0 50 1,929 Do c u S i g n E n v e l o p e I D : 4 5 1 F B 4 B 0 - 2 4 8 9 - 4 5 3 9 - A 1 9 B - 9 D 9 0 F A F 4 5 4 0 1 Ma r t e l C o n s t r u c t i o n Sp r e a d s h e e t R e p o r t Page 2A Bo g e r t P a v i l i o n R e n o v a t i o n - C O # 1 . 2 S h o r i n g O n l y R 4 6/24/2020 10:09 AM Es t i m a t e T o t a l s De s c r i p t i o n Am o u n t To t a l s Ra t e La b o r 1, 1 6 1 Ma t e r i a l (4 , 0 8 0 ) Su b c o n t r a c t 4, 1 7 0 Eq u i p m e n t 53 Ot h e r 1, 3 0 4 1, 3 0 4 Ge n e r a l L i a b i l i t y I n s u r a n c e 13 0. 8 9 0 % Gr o s s R e c e i p t s T a x 14 1. 0 0 0 % Bu i l d e r s R i s k 3 0. 1 8 0 % Bo n d 12 0. 8 2 0 % Co n s t r u c t i o n F e e 67 5. 0 0 0 % Co n s t r u c t i o n C o n t i n g e n c y 10 9 1, 4 1 3 To t a l 1, 4 1 3 Th i s a m o u n t i s f r o m Co n t r a c t o r s C o n t i n g e n c y Do c u S i g n E n v e l o p e I D : 4 5 1 F B 4 B 0 - 2 4 8 9 - 4 5 3 9 - A 1 9 B - 9 D 9 0 F A F 4 5 4 0 1 ID T a s k N a m e Du r a t i o n S t a r t F i n i s h P r e d e c e s s o r s 1 2 PR E - C O N S T R U C T I O N P H A S E 17 2 d a y s Fr i 1 0 / 1 1 / 1 9 Fr i 6 / 1 2 / 2 0 3 Ci t y o f B o z e m a n A p p r o v a l P r o c e s s 6 d a y s Fr i 1 0 / 1 1 / 1 9 Fr i 1 0 / 1 8 / 1 9 4 Ex e c u t e C o n t r a c t b e t w e e n C O B a n d G C C M 6 d a y s Fr i 1 0 / 1 1 / 1 9 Fr i 1 0 / 1 8 / 1 9 5 6 Bu i l d i n g P e r m i t P r o c e s s 32 d a y s Th u 4 / 3 0 / 2 0 Fr i 6 / 1 2 / 2 0 7 Ap p l i c a t i o n & S u b m i t t a l o f B u i l d i n g P e r m i t 32 d a y s Th u 4 / 3 0 / 2 0 Fr i 6 / 1 2 / 2 0 8 Su b m i s s i o n o f B u i l d i n g P e r m i t 3 d a y s Th u 4 / 3 0 / 2 0 Mo n 5 / 4 / 2 0 25 9 Bu i l d i n g P e r m i t R e v i e w P r o c e s s 15 d a y s Tu e 5 / 5 / 2 0 Mo n 5 / 2 5 / 2 0 8 10 Bu i l d i n g D e p a r t m e n t R e v i e w L e t t e r 1 d a y Tu e 5 / 2 6 / 2 0 Tu e 5 / 2 6 / 2 0 9 11 Bu i l d i n g D e p a r t m e n t C o r r e c t i o n s - D o c u m e n t e d & S u b m it t e d 5 d a y s We d 5 / 2 7 / 2 0 Tu e 6 / 2 / 2 0 10 12 Fi n a l P l a n A p p r o v a l L e t t e r 3 d a y s We d 6 / 3 / 2 0 Fr i 6 / 5 / 2 0 11 13 Bu i l d i n g P e r m i t I s s u a n c e 5 d a y s Mo n 6 / 8 / 2 0 Fr i 6 / 1 2 / 2 0 12 14 15 DE S I G N P H A S E 10 3 d a y s Mo n 1 0 / 2 1 / 1 9 Tu e 3 / 1 7 / 2 0 16 De s i g n D e v e l o p m e n t P h a s e 38 d a y s Mo n 1 0 / 2 1 / 1 9 Fr i 1 2 / 1 3 / 1 9 17 90 % C o n s t r u c t i o n / P e r m i t D o c u m e n t s P h a s e D r a w i n g s 25 d a y s Mo n 1 0 / 2 1 / 1 9 Fr i 1 1 / 2 2 / 1 9 4 18 90 % C D B u d g e t 10 d a y s Mo n 1 1 / 2 5 / 1 9 Tu e 1 2 / 1 0 / 1 9 17 19 Ow n e r A p p r o v a l o f 9 0 % C D ' s & B u d g e t 3 d a y s We d 1 2 / 1 1 / 1 9 Fr i 1 2 / 1 3 / 1 9 18 20 Co n s t r u c t i o n D o c u m e n t s P h a s e 65 d a y s Mo n 1 2 / 1 6 / 1 9 Tu e 3 / 1 7 / 2 0 21 Co n s t r u c t i o n D o c u m e n t s P h a s e D r a w i n g s 55 d a y s Mo n 1 2 / 1 6 / 1 9 Tu e 3 / 3 / 2 0 19 22 GC / C M u p d a t e p r o j e c t b u d g e t 7 d a y s We d 3 / 4 / 2 0 Th u 3 / 1 2 / 2 0 21 23 Ap p r o v a l o f C D ' s a n d B u d g e t F o r P r o c u r e m e n t 3 d a y s Fr i 3 / 1 3 / 2 0 Tu e 3 / 1 7 / 2 0 22 24 25 CO N S T R U C T I O N P R O C U R E M E N T P H A S E 31 d a y s We d 3 / 1 8 / 2 0 We d 4 / 2 9 / 2 0 26 GC / C M B i d d i n g P r e p 5 d a y s We d 3 / 1 8 / 2 0 Tu e 3 / 2 4 / 2 0 23 27 SU B / S u p p l i e r B I D D I N G O F P R O J E C T 18 d a y s We d 3 / 2 5 / 2 0 Fr i 4 / 1 7 / 2 0 26 28 Pr o p o s a l s D u e 0 d a y s Fr i 4 / 1 7 / 2 0 Fr i 4 / 1 7 / 2 0 27 29 Pr e p a r e F i n a l E s t i m a t e 5 d a y s Mo n 4 / 2 0 / 2 0 Fr i 4 / 2 4 / 2 0 28 30 Am e n d m e n t N o . 2 A w a r d - F I N A L G M P F O R P R O J E C T 3 d a y s Mo n 4 / 2 7 / 2 0 We d 4 / 2 9 / 2 0 29 31 32 CO N S T R U C T I O N P H A S E 10 4 . 5 d a y s Th u 4 / 3 0 / 2 0 We d 9 / 2 3 / 2 0 CO B B u i l d i n g D e p a r t m e n t CO B B u i l d i n g D e p a r t m e n t Mo r r i s o n & M a i e r l e CO B B u i l d i n g D e p a r t m e n t CO B B u i l d i n g D e p a r t m e n t M E B M E B M E B M E B M Ju n e Ju l y Au g u s t September October Ta s k Sp l i t Mi l e s t o n e Su m m a r y Pr o j e c t S u m m a r y Ex t e r n a l T a s k s Ex t e r n a l M i l e s t o n e In a c t i v e M i l e s t o n e In a c t i v e S u m m a r y Ma n u a l T a s k Du r a t i o n - o n l y Ma n u a l S u m m a r y R o l l u p Ma n u a l S u m m a r y St a r t - o n l y Fi n i s h - o n l y Ex t e r n a l T a s k s Ex t e r n a l M i l e s t o n e Pr o g r e s s De a d l i n e Pr o j e c t S c h e d u l e Bo g e r t P a v i l i o n 6/ 2 2 / 2 0 - C O # 1 Ma r t e l C o n s t r u c t i o n , I n c . Pa g e 1 Bo g e r t P a v i l i o n 10 . 1 1 . 2 0 1 9 Do c u S i g n E n v e l o p e I D : 4 5 1 F B 4 B 0 - 2 4 8 9 - 4 5 3 9 - A 1 9 B - 9 D 9 0 F A F 4 5 4 0 1 ID T a s k N a m e Du r a t i o n S t a r t F i n i s h P r e d e c e s s o r s 33 SU B M I T T A L S 40 d a y s Th u 4 / 3 0 / 2 0 We d 6 / 2 4 / 2 0 34 Pr o c u r e m e n t o f L e a d T i m e I t e m s 40 d a y s Th u 4 / 3 0 / 2 0 We d 6 / 2 4 / 2 0 30 35 Jo i s t H a n g e r s 0 d a y s Mo n 6 / 2 2 / 2 0 Mo n 6 / 2 2 / 2 0 36 Jo i s t s 0 d a y s Mo n 6 / 2 2 / 2 0 Mo n 6 / 2 2 / 2 0 37 GL B e a m 0 d a y s Mo n 6 / 2 2 / 2 0 Mo n 6 / 2 2 / 2 0 38 St e e l B e a m s 0 d a y s Fr i 6 / 2 6 / 2 0 Fr i 6 / 2 6 / 2 0 39 40 NO T I C E T O P R O C E E D 16 d a y s Th u 4 / 3 0 / 2 0 Th u 5 / 2 1 / 2 0 41 Co n t r a c t I n s u r a n c e C e r t i f i c a t e s t o O w n e r 3 d a y s Th u 4 / 3 0 / 2 0 Mo n 5 / 4 / 2 0 30 42 Co n t r a c t B o n d s t o O w n e r 3 d a y s Tu e 5 / 5 / 2 0 Th u 5 / 7 / 2 0 41 43 No t i c e t o P r o c e e d S u b m i t t a l s b y G C C M 5 d a y s Fr i 5 / 8 / 2 0 Th u 5 / 1 4 / 2 0 42 44 Ow n e r R e q u i r e m e n t s f o r N T P ( T e s t i n g , B u i l d e r s R i s k , C o n t r a c t s ) 5 d a y s Fr i 5 / 1 5 / 2 0 Th u 5 / 2 1 / 2 0 43 45 46 PR E - C O N S T R U C T I O N M E E T I N G 0 d a y s Th u 5 / 2 8 / 2 0 Th u 5 / 2 8 / 2 0 47 Pr e - C o n M e e t i n g 0 d a y s Th u 5 / 2 8 / 2 0 Th u 5 / 2 8 / 2 0 44 F S + 5 d a y s 48 49 MO B I L I Z A T I O N 9 d a y s Th u 6 / 1 8 / 2 0 Tu e 6 / 3 0 / 2 0 50 Co n s t r u c t i o n S t a g i n g a n d L a y d o w n A r e a & S e c u r i t y F e nc i n g 4 d a y s Th u 6 / 2 5 / 2 0 Tu e 6 / 3 0 / 2 0 33 51 Te m p F a c i l i t i e s - T r a i l e r s , D u m p s t e r s , P o r t a P o t t i e s e t c . 4 d a y s Th u 6 / 2 5 / 2 0 Tu e 6 / 3 0 / 2 0 33 52 Br a d + 1 l a b o r 0 d a y s Th u 6 / 1 8 / 2 0 Th u 6 / 1 8 / 2 0 53 Ad d 2 c a r p e n t e r s 0 d a y s Mo n 6 / 2 2 / 2 0 Mo n 6 / 2 2 / 2 0 54 55 CO N S T R U C T I O N - B U I L D I N G R E P A I R S 60 . 5 d a y s Mo n 6 / 2 2 / 2 0 Mo n 9 / 1 4 / 2 0 56 Bu i l d i n g S h e l l 47 d a y s Mo n 6 / 2 2 / 2 0 Tu e 8 / 2 5 / 2 0 57 St e e l E r e c t i o n - 1 0 b e a m s / 2 0 e n d s 40 d a y s We d 7 / 1 / 2 0 Tu e 8 / 2 5 / 2 0 13 , 4 9 58 In s t a l l t e m p b e a m s h o r i n g 8 w k s We d 7 / 1 / 2 0 Tu e 8 / 2 5 / 2 0 59 De m o b e a m e n d s 8 w k s We d 7 / 1 / 2 0 Tu e 8 / 2 5 / 2 0 60 In s t a l l n e w a n c h o r b o l t s 8 w k s We d 7 / 1 / 2 0 Tu e 8 / 2 5 / 2 0 61 Er e c t n e w s t e e l b e a m e n d s 8 w k s We d 7 / 1 / 2 0 Tu e 8 / 2 5 / 2 0 62 In s t a l l m i s c e l l a n e o u s i r o n a n d b r a c i n g 8 w k s We d 7 / 1 / 2 0 Tu e 8 / 2 5 / 2 0 63 Ca r p e n t r y W o r k 21 . 5 d a y s Mo n 6 / 2 2 / 2 0 Tu e 7 / 2 1 / 2 0 64 In s t a l l G L B a r c h 2. 4 w k s Mo n 6 / 2 2 / 2 0 Tu e 7 / 7 / 2 0 53 65 In s t a l l j o i s t s & s h e a t h i n g a t n e w r o o f a r e a 1. 5 w k s We d 7 / 8 / 2 0 Fr i 7 / 1 7 / 2 0 64 Ma r t e l 6/ 2 2 6/ 2 2 6/ 2 2 6/ 2 6 Ma r t e l Ma r t e l 6/ 1 8 6/ 2 2 Steel Erection Contractor Steel Erection Contractor Steel Erection Contractor Steel Erection Contractor Steel Erection Contractor Fr a m i n g C o n t r a c t o r Fr a m i n g C o n t r a c t o r M E B M E B M E B M E B M Ju n e Ju l y Au g u s t September October Ta s k Sp l i t Mi l e s t o n e Su m m a r y Pr o j e c t S u m m a r y Ex t e r n a l T a s k s Ex t e r n a l M i l e s t o n e In a c t i v e M i l e s t o n e In a c t i v e S u m m a r y Ma n u a l T a s k Du r a t i o n - o n l y Ma n u a l S u m m a r y R o l l u p Ma n u a l S u m m a r y St a r t - o n l y Fi n i s h - o n l y Ex t e r n a l T a s k s Ex t e r n a l M i l e s t o n e Pr o g r e s s De a d l i n e Pr o j e c t S c h e d u l e Bo g e r t P a v i l i o n 6/ 2 2 / 2 0 - C O # 1 Ma r t e l C o n s t r u c t i o n , I n c . Pa g e 2 Bo g e r t P a v i l i o n 10 . 1 1 . 2 0 1 9 Do c u S i g n E n v e l o p e I D : 4 5 1 F B 4 B 0 - 2 4 8 9 - 4 5 3 9 - A 1 9 B - 9 D 9 0 F A F 4 5 4 0 1 ID T a s k N a m e Du r a t i o n S t a r t F i n i s h P r e d e c e s s o r s 66 Re p a i r b a t h r o o m r o o f 2 d a y s Fr i 7 / 1 7 / 2 0 Tu e 7 / 2 1 / 2 0 65 67 Ro o f i n g 15 d a y s Tu e 7 / 2 1 / 2 0 Tu e 8 / 1 1 / 2 0 68 In s t a l l N e w R o o f i n g S y s t e m s F l a s h i n g & T r i m 3 w k s Tu e 7 / 2 1 / 2 0 Tu e 8 / 1 1 / 2 0 63 69 Pl u m b i n g 15 d a y s Tu e 7 / 2 1 / 2 0 Tu e 8 / 1 1 / 2 0 70 Re - c o n n e c t F i r e S p r i n k l e r L i n e s a n d R e p a i r a s r e q u i re d 2 w k s Tu e 7 / 2 1 / 2 0 Tu e 8 / 4 / 2 0 63 71 Fl u s h , t e s t , a n d c l e a n p i p i n g a n d f i x t u r e s 1 w k Tu e 8 / 4 / 2 0 Tu e 8 / 1 1 / 2 0 70 72 El e c t r i c a l 20 d a y s Tu e 7 / 2 1 / 2 0 Tu e 8 / 1 8 / 2 0 73 El e c t r i c a l C o n d u i t R e p a i r s 2 w k s Tu e 7 / 2 1 / 2 0 Tu e 8 / 4 / 2 0 63 74 In s t a l l n e w L E D f i x t u r e s 1 w k Tu e 8 / 4 / 2 0 Tu e 8 / 1 1 / 2 0 73 75 In s t a l l n e w m a i n p a n e l o n p e d e s t a l 1 w k Tu e 8 / 1 1 / 2 0 Tu e 8 / 1 8 / 2 0 74 76 Pa i n t 12 . 5 d a y s Fr i 8 / 2 1 / 2 0 Tu e 9 / 8 / 2 0 77 Pa i n t r o o f u n d e r s t r u c t u r e & b a t h r o o m e x t e r i o r 2. 5 w k s Fr i 8 / 2 1 / 2 0 Tu e 9 / 8 / 2 0 57 F S - 3 d a y s , 7 5 78 Fi n a l C l e a n - u p 4 d a y s Tu e 9 / 8 / 2 0 Mo n 9 / 1 4 / 2 0 79 Re m o v e d e b r i s f r o m b u i l d i n g a n d d o f i n a l c l e a n - u p 4 d a y s Tu e 9 / 8 / 2 0 Mo n 9 / 1 4 / 2 0 71 , 7 6 80 Re q u e s t S u b s t a n t i a l c o m p l e t i o n d a t e 0 d a y s Mo n 9 / 1 4 / 2 0 Mo n 9 / 1 4 / 2 0 79 81 82 SU B S T A N T I A L C O M P L E T I O N & O C C U P A N C Y 31 d a y s Tu e 8 / 1 1 / 2 0 We d 9 / 2 3 / 2 0 83 Su b s t a n t i a l C o m p l e t i o n - P r o j e c t M i l e s t o n e 0 d a y s Mo n 9 / 1 4 / 2 0 Mo n 9 / 1 4 / 2 0 80 84 AH J R e q u i r e m e n t s 11 d a y s Tu e 8 / 1 1 / 2 0 We d 8 / 2 6 / 2 0 85 Pe r f o r m l o c a l b u i l d i n g a g e n c y i n s p e c t i o n 1 d a y Tu e 8 / 1 8 / 2 0 We d 8 / 1 9 / 2 0 75 86 Pe r f o r m F i r e M a r s h a l ' s i n s p e c t i o n 1 d a y Tu e 8 / 1 1 / 2 0 We d 8 / 1 2 / 2 0 71 87 Co m p l e t e t a s k l i s t i t e m s f r o m a l l i n s p e c t i o n s 5 d a y s We d 8 / 1 9 / 2 0 We d 8 / 2 6 / 2 0 85 , 8 6 88 Ob t a i n c e r t i f i c a t e o f o c c u p a n c y - A H J 0 d a y s We d 8 / 2 6 / 2 0 We d 8 / 2 6 / 2 0 87 89 Ow n e r / A r c h i t e c t R e q u i r e m e n t s 20 d a y s We d 8 / 2 6 / 2 0 We d 9 / 2 3 / 2 0 90 Re q u e s t E n g i n e e r ' s I n s p e c t i o n 0 d a y s We d 8 / 2 6 / 2 0 We d 8 / 2 6 / 2 0 88 91 En g i n e e r s ' s I n s p e c t i o n 2 d a y s We d 8 / 2 6 / 2 0 Fr i 8 / 2 8 / 2 0 90 92 Co m p l e t e p u n c h l i s t i t e m s f r o m E n g i n e e r ' s I n s p e c t i o n 5 d a y s Fr i 8 / 2 8 / 2 0 Fr i 9 / 4 / 2 0 91 93 En g i n e e r c o n f i r m p u n c h l i s t 1 d a y Fr i 9 / 4 / 2 0 Mo n 9 / 7 / 2 0 92 94 Is s u e f i n a l c o m p l e t i o n d o c u m e n t s i n c l u d i n g w a r r a n t i es 1 d a y Mo n 9 / 7 / 2 0 Tu e 9 / 8 / 2 0 93 95 Is s u e f i n a l r e q u e s t f o r p a y m e n t 1 d a y Mo n 9 / 1 4 / 2 0 Tu e 9 / 1 5 / 2 0 80 , 9 4 96 Co n t r a c t o r P r e p a r e d P u n c h L i s t P r o c e s s - t o S u b s 7 d a y s Mo n 9 / 1 4 / 2 0 We d 9 / 2 3 / 2 0 80 97 Ow n e r O c c u p a n c y 0 d a y s Mo n 9 / 1 4 / 2 0 Mo n 9 / 1 4 / 2 0 98 Ow n e r O c c u p a n c y 0 d a y s Mo n 9 / 1 4 / 2 0 Mo n 9 / 1 4 / 2 0 88 , 7 9 Ro o f i n g C o n t r a c t o r FS C o n t r a c t o r FS C o n t r a c t o r El e c t r i c C o n t r a c t o r Electric Contractor Painting Contractor G.C. Labor Crew 9/14 9/14 AHJ Fi r e M a r s h a l All Trades 8/26 8/26 Morrison & Maierle Martel Morrison & Maierle Martel Martel Martel 9/14 9/14 M E B M E B M E B M E B M Ju n e Ju l y Au g u s t September October Ta s k Sp l i t Mi l e s t o n e Su m m a r y Pr o j e c t S u m m a r y Ex t e r n a l T a s k s Ex t e r n a l M i l e s t o n e In a c t i v e M i l e s t o n e In a c t i v e S u m m a r y Ma n u a l T a s k Du r a t i o n - o n l y Ma n u a l S u m m a r y R o l l u p Ma n u a l S u m m a r y St a r t - o n l y Fi n i s h - o n l y Ex t e r n a l T a s k s Ex t e r n a l M i l e s t o n e Pr o g r e s s De a d l i n e Pr o j e c t S c h e d u l e Bo g e r t P a v i l i o n 6/ 2 2 / 2 0 - C O # 1 Ma r t e l C o n s t r u c t i o n , I n c . Pa g e 3 Bo g e r t P a v i l i o n 10 . 1 1 . 2 0 1 9 Do c u S i g n E n v e l o p e I D : 4 5 1 F B 4 B 0 - 2 4 8 9 - 4 5 3 9 - A 1 9 B - 9 D 9 0 F A F 4 5 4 0 1 CONFIDENTIAL Price Quotation June 22, 2020 MARTEL CONSTRUCTION, INC. 1203 S CHURCH AVE BOZEMAN, MT 59715-5801 Phone: 406-600-4057 Fax: ATTN: John Kalmon 25387 BZMT1564 07/22/2020 06/24/2020Account #: Quote #:Expiration Date: Due Date: Job #:PO #: Extended PriceQuantityDescriptionCustomer Part #Part #Price/C 14485 $2,632.08$658.0200400HCS 1-8 x 11 P8 1"-8 x 11" Grade 8 Plain Finish Hex Cap Screw 36419 $212.00$53.00004001"-8 FHN P 8 1"-8 Plain Finish Grade 8 Finished Hex Nut 33852 $272.64$34.0800800USS THRU-HARD 1" P 1" x 2.500" OD Thru-Hardened Plain Finish Steel USS General Purpose Flat Washer $3,116.72USD Subtotal: $100.00Shipping & Handling: $3,216.72USD Total: *Shipping & Handling charges are subject to change. FASTENAL 8235 Huffine Lane Bozeman, MT 59718 Phone: (406)582-8119 Fax: (406)582-8142 E-mail: MTBOZ@stores.fastenal.com Thank you, Page 1 of 1 QUOTE REPORTFASTENAL COMPANY DocuSign Envelope ID: 451FB4B0-2489-4539-A19B-9D90FAF45401 DocuSign Envelope ID: 451FB4B0-2489-4539-A19B-9D90FAF45401 Quote number: Q200615-6 Prepared for:Prepared by: John Kalmon Martel Construction 1203 S Church Ave Bozeman, MT 59715 Phone: 406-600-4057 Chuck Gardenhire 112 Commercial Dr Bozeman, MT 59715 Created date: Expiration date: 06/15/2020 07/15/2020 20 Ea. Shoring Saddles including 4 ea. 3/4-10 Grade 8 Studs per unit. Note; 16 ea. 8.750" Wide, 4 ea. 5.125" Wide Notes: Quantity Unit Price Extended PriceNameItemMaterialGaugeWidthLength Shoring Saddle(2)40 $54.908 $2,196.311MS A36 HR 0.250 in. .25028.50 20.00 Shoring Saddle(1)16 $21.383 $342.132MS A36 HR 0.250 in. .25010.00 20.00 Shoring Saddle(3)4 $17.558 $70.233MS A36 HR 0.250 in. .2506.50 20.00 Weld & Assm.20 $105.177 $2,103.5440.00 0.00 Secondary operations: 3/4-10 All-Thrd. Weld & Assm. Total:$4,712.22 6/19/2020 Page 1 of 1www.JMetalWorks.com DocuSign Envelope ID: 451FB4B0-2489-4539-A19B-9D90FAF45401 Quote number: Q200618-7 Prepared for:Prepared by: John Kalmon Martel Construction 1203 S Church Ave Bozeman, MT 59715 Phone: 406-600-4057 Chuck Gardenhire 112 Commercial Dr Bozeman, MT 59715 Created date: Expiration date: 06/18/2020 07/18/2020 4 Ea. Shoring Base Plt. Assm.Notes: Quantity Unit Price Extended PriceNameItemMaterialGaugeWidthLength Shoring Base Plt Assm(1) 4 $21.836 $87.341MS A36 HR 0.500 in. .50010.63 4.00 Shoring Base Plt Assm(2) 4 $24.289 $97.162MS A36 HR 0.250 in. .25012.00 12.00 Shoring Base Plt Assm(3) 4 $39.385 $157.543MS A36 HR 0.500 in. .50012.00 12.00 6.00" Sch 40 Pipe 4 $15.600 $62.4040.00 0.00 Weld & Assm.4 $102.375 $409.5050.00 0.00 Secondary operations: Saw Weld & Assm. Total:$813.94 6/18/2020 Page 1 of 1www.JMetalWorks.com DocuSign Envelope ID: 451FB4B0-2489-4539-A19B-9D90FAF45401 Quote number: Q200618-6 Prepared for:Prepared by: John Kalmon, Martel Construction 1203 S Church Ave Bozeman, MT 59715 Phone: 406-600-4057 Chuck Gardenhire 112 Commercial Dr Bozeman, MT 59715 Created date: Expiration date: 06/18/2020 07/18/2020 20 sets Splice Plt. & Joist Saddle Note: We may have to use a USP416 Brkt. the other are out 6 days on Delv. Notes: Quantity Unit Price Extended PriceNameItemMaterialGaugeWidthLength Splice Plts 40 $18.321 $732.831MS A36 HR 0.250 in. .2506.00 28.50 Simpson HUC416 Face Mnt Hanger 40 $53.463 $2,138.5020.00 0.00 Secondary operations: Weld & Assm. Total:$2,871.33 6/19/2020 Page 1 of 1www.JMetalWorks.com DocuSign Envelope ID: 451FB4B0-2489-4539-A19B-9D90FAF45401 D o c u S i g n E n v e l o p e I D : 4 5 1 F B 4 B 0 - 2 4 8 9 - 4 5 3 9 - A 1 9 B - 9 D 9 0 F A F 4 5 4 0 1