HomeMy WebLinkAbout08-25-20 City Commission Packet Materials - C7. Res 5215 Authorize CO1 to Aspen St and 5th Ave Improvements Proj Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: David Fine, Urban Renewal Program Manager SUBJECT: Resolution 5215 authorizing Change Order No. 1 to the Aspen Street and 5th Avenue Improvements Project. MEETING DATE: August 25, 2020 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution 5215. BACKGROUND: On March 23, 2020, the City Commission authorized the City Manager to sign an agreement with Great Northwest Construction, Inc. to remove and relocated a drive approach on Aspen St. To facilitate the best design for that project, the Board determined it was necessary and appropriate to seek the relocation of the drive approach for the property at 806 N. 7th Ave. previously occupied by Village Inn Pizza. As part of the Agreement, the City agrees to provide property improvements and the engineering of those improvements to facilitate the relocation of a drive approach from W. Aspen St. to the public alley. Staff noted at the time that the property improvements were not included in the initial bid and would require a change order. On April 20, 2020, the City Commission approved the addition of a new sewer main in N. 5th Avenue to the Aspen Street and 5th Avenue Improvements Project. Since the sewer main was not designed at the time the project was bid, it was not included in the original bid. The change order includes the portion of the sewer line that is located under N. 5th Ave. between Aspen St. and Tamarack St., where the road surface is being reconstructed as part of the Project. The remaining portion of the sewer main, between Tamarack St. and Oak St. will be bid as a separate project. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: This change order increases the contract amount by $271,157.50 from $1,845,761.05 to $2,116,918.55. Funding for the change order is included in the Midtown Urban Renewal District FY2021 Work Plan and Budget. Attachments: Resolution No 5215, Change Order No 1 Report compiled on: August 7, 2020 108 Version April 2020 RESOLUTION 5215 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION / MODIFICATION OF CONTRACT WITH KNIFE RIVER, BELGRADE, MONTANA. WHEREAS, the City Commission did, on the 4th day of May 2020, authorize award of the bid for the Aspen Street and 5th Avenue Improvements Project, to Knife River, Belgrade, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Knife River, as contained in the Change Order 1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 109 Version April 2020 PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the _____ day of ________, 20____. ___________________________________ CHRIS MEHL Mayor ATTEST: ___________________________________ MIKE MAAS City Clerk APPROVED AS TO FORM: ___________________________________ GREG SULLIVAN City Attorney 110 Change Order No. 1 PROJECT:DATE OF ISSUANCE:August 17, 2020 OWNER:City of Bozeman OWNER PROJ. NO. 121 N Rouse Ave. Bozeman, MT 59715 CONTRACTOR:Knife River - Belgrade ENGINEER:SANDERSON STEWART P.O. Box 9 Belgrade, MT 59714 ENGINEER PROJ. NO.18098.10 CONTRACT FOR: You are directed to make the following changes in the Contract Documents. Purpose of Change Order: Explanation of Items.See page three for explanation Attachments: CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: Original Contract Price Original Contract Time $1,845,761.05 120 days or date Previous Change Order No. 0 Net change from previous Change Orders $0.00 0 days Contract Price prior to this Change Order Contract Time prior to this Change Order $1,845,761.05 120 days or date Net INCREASE of this Change Order Net INCREASE of this Change Order $271,157.50 57 days Contract Price with all approved Change Orders Contract Time with all approved Change Orders $2,116,918.55 177 days or date RECOMMENDED:ACCEPTED: by: ________________________________________by: ______________________________________________ Sanderson Stewart Date Knife River - Belgrade Date APPROVED: by: ________________________________________ City of Bozeman Date Aspen Street & 5th Avenue Improvements To provide street improvements, water main, electrical and landscaping on Aspen Street and 5th Avenue in Bozeman, MT. To add 5th Avenue Sewer, Audrey's Pizza site improvements, and other miscellaneous items to the contract. Contractor pricing Page 1 of 3111 Change Order No. 1 PROJECT:DATE OF ISSUANCE:August 17, 2020 Bid Quantity Dollar Amount Item Description Unit Price Increase / Decrease Increase / Decrease 5th Ave Sanitary Sewer (Aspen St to Tamarack St) CO1-101 LS $11,818.00 1.00 11,818.00$ -$ CO1-102 LS $4,000.00 1.00 4,000.00$ -$ CO1-103 LS $1,000.00 1.00 1,000.00$ -$ CO1-104 LS $5,900.00 1.00 5,900.00$ -$ CO1-105 LS $44,600.00 1.00 44,600.00$ -$ CO1-106 LF $68.25 450.00 30,712.50$ -$ CO1-107 EA $5,300.00 2.00 10,600.00$ -$ CO1-108 VF $590.00 8.00 4,720.00$ -$ CO1-109 LF $63.50 46.00 2,921.00$ -$ CO1-110 UNIT $1.00 10,000.00 10,000.00$ -$ CO1-111 LS $9,300.00 1.00 9,300.00$ -$ 135,571.50$ Audrey's Pizza Site Improvements CO1-201 LS $8,500.00 1.00 8,500.00$ -$ CO1-202 LS $2,100.00 1.00 2,100.00$ -$ CO1-203 EA $8,900.00 1.00 8,900.00$ -$ CO1-204 CY $32.00 730.00 23,360.00$ -$ CO1-205 CY $51.00 440.00 22,440.00$ -$ CO1-206 CY $68.00 220.00 14,960.00$ -$ CO1-207 SY $18.00 1200.00 21,600.00$ -$ CO1-208 LF $66.00 103.00 6,798.00$ -$ CO1-209 SY $9.00 1370.00 12,330.00$ -$ CO1-210 LS $1,150.00 1.00 1,150.00$ -$ CO1-211 LF $25.00 205.00 5,125.00$ -$ CO1-212 EA $2,000.00 1.00 2,000.00$ -$ CO1-213 LS $100.00 1.00 100.00$ -$ CO1-214 LS $400.00 1.00 400.00$ -$ 6-inch Sanitary Sewer Service 48-inch SS Manhole Additional Depth 48-inch SS Manhole (5' Depth) 8-inch Sanitary Sewer Main Asphalt Removal and Restoration Groundwater Dewatering Extend Sewer Through Tamarack Storm Water Management and Erosion Control Dry Well Unclassified Excavation 6-inch Minus Uncrushed Gravel (12-inch Section) Topsoil Drainage Swale Subtotal Miscellaneous Work Mobilization and Insurance Traffic Control Stormwater Management and Erosion Control Mobilization and Insurance Tree Removal CHANGE ORDER NO. ONE Aspen Street & 5th Avenue Improvements Vertical Curb (6-inch x 12-inch) 1-inch Base Course Gravel (6-inch Section) Asphalt Surface Course (3-inch Section) Concrete Valley Gutter Asphalt Removal (3-inch) Misc. Parking Lot Demo Page 2 of 3112 Change Order No. 1 CO1-215 LS $1,900.00 1.00 1,900.00$ -$ 131,663.00$ Miscellaneous Items CO1-301 LS $350.00 1.00 350.00$ -$ CO1-302 SF $2.75 192.00 528.00$ -$ CO1-303 CY $137.50 6.00 825.00$ -$ CO1-304 LS $2,220.00 1.00 2,220.00$ -$ 3,923.00$ TOTAL NET INCREASE 271,157.50$ Item No. CO1-101 thru CO1-111 CO1-201 thru CO1-215 CO1-301 CO1-302 CO1-303 CO1-304 This item is being added to provide flowable fill where water main crosses the sewer main at approximate Station 2+50 per review comments from DEQ. This item is being added to upgrade the 3/4-inch water service at 0+90.58 to a 1.5-inch service. EXPLANATION OF ITEMS Flowable Fill 1.5-inch Water Service Parking Lot Striping This item is being added to address a buried pipe that was discovered near the N. 7th Ave intersection. The pipe is no longer in use and needed to be removed for placement of the new road section. This item is being added to provide insulation where the water main does not meet standard depth near the existing water main in 5th Avenue and near the sewer crossing at approximate Station 2+50. Subtotal Remove Ex. CMPA Culvert at N 7th Ave Water Main Insulation Subtotal These items are being added to the contract to install site improvements for Audrey's Pizza per the agreement between the City of Bozeman and Great Northwest Construction, Inc. These items are being added to the contract to install the segment of the 5th Ave Sewer within this project area from Aspen Street to Tamarack Street. Page 3 of 3113 114 115 116 EQUAL OPPORTUNITY EMPLOYER www.kniferiver.com Intermountain Region-Belgrade Division P.O. Box 9 Belgrade, MT 59714 (406) 388-6832 (406) 388-8347 Fax Sanderson Stewart June 29th, 2020 1610 Ellis Street Suite 2B Bozeman, MT 59715 RE: Aspen / 5th Additional Pipe Removal Dear Danielle, Per your request Knife River – Belgrade is supplying the lump sum price of $350.00 to remove and dispose approximately 45 LF of existing CMPA discovered while removing asphalt at N 7th and Aspen Street. Sincerely, Josh Walter Project Manager / Estimator Knife River - Belgrade 117 1 Danielle Scharf From:Walter, Josh <Josh.Walter@Kniferiver.com> Sent:Friday, August 14, 2020 10:36 AM To:Danielle Scharf Subject:RE: Aspen/5th Change Orders Attachments:Unit Pricing for Items Discussed; SKMBT_C36020081314530.pdf Danielle, For SIME they had the following additional items (unit pricing provided from SIME attached): 1.) Insulation / Flowable Fill a. 7th Ave connection point – 3 Sheets (48 SQFT PER EA) of Insulation – 96 SQFT @ $2.75 = $264.00 b. Station 2+50 – 3 sheets (48 SQFT PER EA) of Insulation – 96 SQFT @ $2.75 = $264.00 c. Station 2+50 – 6 CY of Flowable Fill @ $137.50 PER CY = $825.00. Was not shown on bid documents but added to the construction documents. See second attachment. 2.) ¾” Water Service @ 0+90.58 had to be upsized to a 1.5” water service - $2,220.00 I’ll send over some additional time requests sometime today….but probably won’t have anything on the sewer until next week as SIME hasn’t had a chance to go back through the revised plans yet. Thanks, Josh Walter Project Manager/Estimator Knife River – Belgrade PO Box 9 Belgrade, MT 59714 Main Office: 406-388-6832 Direct Line: 406-924-5572 Fax: 406-388-9612 From: Danielle Scharf <dscharf@sandersonstewart.com> Sent: Thursday, August 13, 2020 2:38 PM To: Walter, Josh <Josh.Walter@Kniferiver.com> Cc: Wayne Anderson <wanderson@sandersonstewart.com> Subject: Aspen/5th Change Orders ** WARNING: EXTERNAL SENDER. NEVER click links or open attachments without positive sender verification of purpose. DO NOT provide your user ID or password on sites or forms linked from this email. ** Josh, Like I mentioned, I’m working on setting up the change orders for Aspen. In addition to the sewer and Audrey’s site improvements, I also have the attached miscellaneous items. 118 1 Danielle Scharf From:Theron Pavlik <theron@simeconst.com> Sent:Wednesday, July 8, 2020 9:59 AM To:Walter, Josh Cc:Jeff Milesnick; Erica Mineau Subject:Unit Pricing for Items Discussed ** WARNING: EXTERNAL SENDER. NEVER click links or open attachments without positive sender verification of purpose. DO NOT provide your user ID or password on sites or forms linked from this email. ** Josh – Thanks for your time on the phone. Please see the breakdown below for the additional items discussed. In reviewing our line items we currently have prices established for reconnecting the ¾” services, and the 1” services to the new main.  1.5” water service – reconnect to new main = $2,000.00 each  2” water service – reconnect to new main = $2,500.00 each  2” insulation board = $2.50 per square foot installed  Flowable Fill = $125.00 per cubic yard If for some reason we need to replace a service to the property line we will need to re-visit. Let us know how you will need us to keep track of these items for billing purposes? Not sure if Sanderson Stewart will initiate a way to track this, or if you will need us to implement a work directive. Thanks You. Theron C. Pavlik SIME Construction INC. 190 Ramshorn Drive Bozeman, MT. 59718 Cell : 406-600-8084 Email : theron@simeconst.com 119 120