Loading...
HomeMy WebLinkAbout2020-01-09.GLVT TOP Application West Side Pathways and Trails Connection ProjectCity of Bozeman West Side Pathways and Trails Connection Project Creating a New Community Trail Network Pedestrian and Bicycle Safety Enhancements Application for City of Bozeman Trails, Open Space and Parks Bond Funding Date January 9, 2020 Submitted By: 212 South Wallace Ave Bozeman, MT 59715 (406) 587-8404 City of Bozeman West Side Pathways and Trails Connection Project Contents Application Narrative ............................................................................................ 1 Summary of Project Goals ................................................................................... 16 Budget .................................................................................................................. 17 Wayfinding Signage Concepts ............................................................................ 18 Maps Map A – Overview Map of Proposed East-West Route Map B - Proposed Routes Map C - Parks, Open Space, and Natural Areas Map Map D – Schools Map Map E - Wayfinding Needs Map Map F - Bozeman Trail Networks Concept Map West Side Pathways and Trails Connection Project Page 1 Section 1 Description of the project including location, budget, the amount requested and amount contributed from other sources. The Gallatin Valley Land Trust (GVLT) and the City of Bozeman (City) share a vision to create a safe, connected bicycle and pedestrian trail route that stretches from the westernmost City limits, through neighborhoods, parks, schools and commercial districts, into the Downtown core of Bozeman. GVLT is seeking $150,000 from the Trails, Open Space and Parks (TOP) bond to complete an “East-West Connector Trail” network that enhances existing trails and pathways, establishing a safe, accessible recreation and commuter trail stretching over five miles from the western edge of Bozeman’s city limits to the proposed Front Street Pathway Connector. In 2012, the citizens of Bozeman voted overwhelmingly to invest $15 million into their parks and trails system. The vision was clear: create new parks and trails that connect and enhance our community. The result has been the addition of nearly 150 acres of parkland and 10 miles of new trails and pathways within the City of Bozeman. Each project met a unique community desire: preserving open space, enhancing water quality, creating more space for organized sports, giving children (and dogs) space to run free and explore their environment. But one thread runs through each of these projects, providing both recreation and connection around, through, and beyond the trees, turf and playgrounds. That thread is trails. Each and every project funded by the TOP Bond either features trails or effectively incorporates trails into the design. The East-West Connector Trail would be just such a project, but is unique in that it seeks to connect many of the new TOP funded parks and trails, while also comprehensively connecting neighborhoods, schools and commercial centers to the Main Street to the Mountains trail system. Portions of the trail network will also be part of the planned nation-wide Great American Rail Trail. This project seeks to accomplish a component of the City’s long-desired objective of effective pedestrian and bicycle path and trail networks in the western portions of the City. See the Overview Map of Proposed East-West Route for the proposed primary routes of this project. GVLT has been a valued partner in establishing, expanding, and maintaining trails throughout the City of Bozeman and we are proud to again be working cooperatively with the City on this project. Rapid increase of the size of the City of Bozeman and population growth create an urgent need for this Connection Project. This project would be considered the first phase of expanding the Main Street to the Mountains trail network westerly, with opportunities to further connect to the north, northwest, south, and southwest in future phases. See the Bozeman Trail Networks Concept Map F for a depiction of those trail networks. The project will also ensure that proper connectivity and signage are in place to connect to the existing trail systems to the east. West Side Pathways and Trails Connection Project Page 2 Utilizing a portion of the remaining Trails, Open Space and Parks (TOP) funding is very fitting and builds on the excellent collaborative work accomplished by the TOP projects at the Bozeman Sports Park, Path to the M and Drinking Horse, Bozeman Pond, and Front Street Pathway (planned construction 2020). This proposed project capitalizes on a great deal of investment and progress already made by the City, the Bozeman School District and private developers. The project seeks to connect existing pathways and trails into a continuous network as envisioned by the City’s 2007 Parks, Recreation, Open Space and Trails Plan (PROST). Specific examples of this completed work include: • The City of Bozeman’s Complete Streets projects, Capital Improvement Plan (CIP) projects, various safe routes to school programs, Americans with Disabilities Act (ADA), Arterial Street Program, etc. • Completed Transportation Alternatives (TA) projects. • Effective implementation of Parks, Recreation, Open Space and Trails (PROST) Plan requirements since 2007 across multiple phases of subdivision development by private developers. • Existing subdivision requirements for park and trail designation and construction as required by PROST and recommendations made by the Subdivision Review Committee of the Recreation and Parks Advisory Board. • Completed and approved Trails, Open Space and Parks Bond (TOP) projects. • Bicycle and pedestrian safety improvements advanced through Bozeman’s Pedestrian and Transportation Safety Committee and Bicycle Advisory Board. • Upcoming completion of the new Bozeman School District Gallatin High School and the needs of students, parents and teachers. • Completion of excellent work by developers with park and trail facilities, with the need to connect them to destinations outside of their specific development. • Commitment and assistance from local partner groups such as Gallatin Valley Land Trust, Bozeman Sports Park Foundation, Trust for Public Lands, Run Dog Run, etc. • Established Streamline transit routes and future routes. Funding and match: GVLT is requesting up to $150,000 of funding from the Trails, Open Space and Parks (TOP) bond for this project. Recognizing the importance of completing previously Commission-approved projects and the Committee’s process, GVLT is prepared to adjust the amount requested if necessary in order to allow for completion of those approved projects. To leverage the TOP request GVLT is working with the City of Bozeman to identify projects within its existing plans. If funding is awarded through the TOP program, City West Side Pathways and Trails Connection Project Page 3 staff will determine specific funding sources at an approximate 1:1 match, over several funding cycles. To accomplish this, the City’s Transportation Engineer and Parks & Recreation Planner and Development Manager have convened a series of meetings with City Community Development, City Engineering, City Streets Department, City Parks & Recreation, Bozeman School District and GVLT. Two meetings have been held to date. GVLT will apply for Cash-in-Lieu of Parkland (CILP) funding in areas where it is applicable to enhance linear connections to parks and recreation facilities. GVLT will work with City staff and the Recreation and Parks Advisory Board who will forward their recommendations to the City Commission for final approval if the TOP funding is awarded. GVLT will pursue a $45,000 grant from the new State Trails and Recreational Facilities Account and Grant Program established during the 2019 legislature. The application period for this new grant opportunity is expected to be in the Fall of 2020 with awards made for the 2021 construction season. GVLT has received a commitment from Trident Cement Plant to donate gravel trail surfacing materials for trail building and rehabilitation. GVLT will lead wayfinding sign and map design, content and installation of amenities in conjunction with contractors. GVLT will coordinate community and HOA volunteer projects to re-establish trails or build necessary connections (photo of National Trails Day 2018 at Valley West to right). Bozeman School District is actively working with City staff on safer routes to the new high school and connections with the nearby Sports Park complex. As this project moves forward, the School District will consider assisting with funding projects to improve non-vehicle access for students, parents, and special event attendees. A specific amount has not been identified at this time. A representative of the school district and a Trustee are participating in the City’s working committee for this project. The City, GVLT and Western Transportation Institute (WTI) are involved in a student learning project with Montana State University’s Architecture program to collect trail user data, conduct trail user surveys, design trail networks, and design wayfinding signage. This is part of the City’s Community-engaged and Transformational Scholarship Initiative (CATS). MSU has been awarded a grant to cover the costs of a research assistant to coordinate the field work and data collection. Two MSU classes have been involved to date, with a third class to work on the project in Spring 2020. Eighty-five hours of survey have been conducted, on 15 area trails. West Side Pathways and Trails Connection Project Page 4 Section 2. Description of how the project creates or enhances the following community aspects: a. Open Space/Natural Areas – Along the primary corridor, this project will connect many areas of Public Open Space and Natural Areas (see Parks, Open Space, and Natural Areas Map C). City planners directed developers to establish open space areas within their subdivisions to protect sensitive areas and provide public access, commonly with trails established to guide users on a safer route removed from streets and highways. Currently these trail segments are not identified by signage and some have fallen into disrepair (see photo left). This project seeks to properly sign existing trails into new, logical networks, providing off-street alternatives for safety and opportunities for outdoor recreation, enhancing appreciation for Bozeman’s natural resources. Trail maps will be installed at key locations to show users their current location and nearby open space destinations. The project will also deliver funding necessary to re-establish existing City trails and bring them back to City standards. b. Parks – Within the primary project corridor, ten (10) Parks will be connected by this project (see Parks, Open Space, and Natural Areas Map C). This project will incentivize residents and visitors to travel from park to park without the use of a vehicle, helping to alleviate congestion at popular parks and sporting events. In the broader scope, the network will connect the City’s TOP-funded Bozeman Sports Park with Story Mill Community Park (photo left) and the Path to the M and Drinking Horse. The proposed path and trail network will also connect to the Gallatin County Regional Park and two existing off-leash dog parks. The corridor provides access to two bicycle parks, one at the Regional Park and one at Westlake City Park. This project will serve to encourage users to cycle to the parks rather than use vehicles. West Side Pathways and Trails Connection Project Page 5 c. Trails – The City of Bozeman is fortunate to have an extensive number of trails throughout the City, but rapid growth over the past decade has created challenges for the Parks & Recreation Department to keep up with connecting the trails and pathways into networks. As the City’s trusted trails partner, Gallatin Valley Land Trust is working with the City to transform the Main Street to the Mountains trail system by connecting these paths into a comprehensive system of routes and loop trails ideal for both recreation and commuting (see Trail Networks Map F). As mentioned previously, this project is envisioned to be the first step in expanding the trail networks throughout the Bozeman area. Typical West Side Trail near Gallatin High School Needing Wayfinding Signage Portions of this trail network will become part of the planned Great American Rail Trail, the first nation-wide trail to traverse the Bozeman area. d. Water quality/Sustainability/Climate Action Plan – Opportunities exist to improve bridges and water crossings within the project corridor to protect water resources. City Parks & Recreation staff will identify specific bridge projects within Park areas eligible for TOP funding. Project components will include erosion control improvements as identified. This project will also provide funding to establish educational signage at key areas to encourage greater stewardship of water resources. With the large number of schools along the corridor this project creates opportunities for outdoor classrooms. Potential partners include the Bozeman School District, Montana State University, Greater Gallatin Watershed Council, Montana Outdoor Science School and others. GVLT will conduct several of its popular Discovery Walks within these areas each year, focusing on such topics as water quality and sustainability. As stated by the City of Bozeman’s Sustainability Office on their official webpage, “New trails and parks have the potential to reduce Bozeman’s carbon footprint, as both carbon-sinks and to the extent they reduce driving.” Great work has been accomplished in creating new trails and parks, but enhancing connectivity is vital to effecting greater use of the trails and parks and taking full advantage of their benefits. West Side Pathways and Trails Connection Project Page 6 Consistent with Item TLU-6 of the Bozeman Municipal Climate Action Plan, an opportunity exists to implement incentive programs along the corridor to encourage employees and students to use alternative modes to get to and from work, school and parks. e. Multi-Use Recreational Fields – While the proposed project does not include establishing new multi-use recreational fields, it seeks to more safely connect important recreational facilities at the City’s Sports Park (photo right) and Bronken Sports Complex. Trail connectivity would also be a priority to access Oak Springs Park, which is currently in the master planning process. Trails in the western portion of the city could reduce congestion and parking capacity issues during sporting events and tournaments. A specially designated trail network could be identified to connect the Sports Park and Bronken Park to allow participants and spectators to walk between these venues during large, regional tournaments spread out over multiple locations. f. (Additional Item) Neighborhoods, Schools, and Inclusivity – An effective trail network encourages social interaction between residents of different neighborhoods in a casual setting, helping to improve overall community connectedness. This project will connect major subdivisions, such as Valley West, Flanders Mill, Flanders Creek, Baxter Meadows, Lakes at Valley West, Valley Unit, Laurel Glen, Traditions, Oak Springs, and soon Norton Ranch, with neighborhoods in Midtown, Downtown and the east. With the mix of housing densities, ownership/rental opportunities, subsidy opportunities present throughout the western neighborhoods, this project is highly inclusive of the spectrum of residents. An effective trail network also encourages social interaction between residents of different neighborhoods in a casual setting, helping to improve overall community connectedness. High-fives on the trail West Side Pathways and Trails Connection Project Page 7 The City’s former Neighborhoods Coordinator agreed to help facilitate neighborhood engagement for this project. GVLT will participate in the West Side Neighborhoods Town Hall scheduled for spring of 2020, and make a presentation on this project to the Inter Neighborhood Council in early 2020. GVLT will coordinate with the new Neighborhoods Coordinator, once appointed, to carry out this public engagement. A primary focus of this project has been safer routes to school, which has influenced priority connections. As shown on the Schools Map D in this application, Bozeman School District schools in close proximity to the primary corridor of the initial phase of the project include: • Gallatin High School (opening Fall 2020) • Meadowlark Elementary School • Chief Joseph Middle School • Hyalite Elementary School • Emily Dickinson Elementary School The proposed West Side Trail Loop creates convenient and safe connection to Montana State University via existing shared use paths along Huffine Lane and College Street. Future phases of this project will connect to additional schools with the long term objective to have safer connections to all Bozeman School District Schools. g. (Additional Item) Healthy Communities – Regular physical activity has been well documented nationally and is referenced in many City and County planning efforts. This project helps identify trails in close proximity to residents. Adding wayfinding improves safety and comfort level of users when they know where the trails lead to and what destinations can be reached. West Side Pathways and Trails Connection Project Page 8 Section 3 Description of the project area: As specified in Goal 6.3 of Bozeman’s Transportation Master Plan, it is important to “engage stakeholders and the public in the decision-making stage of the transportation planning process”. Public engagement is well underway for this proposed TOP project, as it casts a wide net, running through some of the dense urban neighborhoods of Bozeman. This project will benefit a diverse range of community members living along the proposed route. Gallatin Valley Land Trust has performed extensive field work identifying feasible path and trail corridors in an east-west orientation, connecting with the existing West Side Trail and has proposed an initial trail network for further consideration by the community. Meetings have been held with Parks & Recreation, City Engineering, City Streets and Bozeman School District to review the concept and fine tune the routes according to identified needs and available City funding. Additionally, the City Transportation Engineer will facilitate discussions with the Bozeman Area Bicycle Advisory Board (BABAB) and Pedestrian Transportation Safety Committee (PTS) to gather their input as designated citizen advisory boards. Introductory presentations have been made to both boards. As this project moves forward, PTS and BABAB will be asked to provide advice on safety improvements within West Side Pathways and Trails Connection Project Page 9 their scope. Western Transportation Institute will also be involved with transportation- related locations and routes within their areas of expertise and advisory areas. As mentioned previously, the City of Bozeman, GVLT, and Western Transportation Institute are currently involved with Montana State University’s School of Architecture to collect trail usage data, conduct usage surveys, develop wayfinding needs, and conduct a trails planning charrette under the CATS program. A grant has been awarded to fund a research assistant to coordinate the student project over the Fall 2019 and Spring 2020 semesters. The information obtained during this study will be incorporated into final designs of the trail networks and will influence wayfinding locations. All of this information will be gathered and coordinated closely with City departments to comply with planning mechanisms, community plans, funding, and a final plan developed by the City. Careful analysis of off-street areas will be needed to assess trail maintenance requirements and roles (i.e. HOA, City). West Side Pathways and Trails Connection Project Page 10 Section 4 Briefly explain how the project creates long term value for residents of Bozeman. As specifically stated in the City of Bozeman’s Strategic Plan, recreational opportunities and connectivity are important aspects of a Well Planned City as described in the Plan for the long term vitality of the community and its residents. This project would accomplish many of the objectives identified in various City of Bozeman plans. Specific references include: Bozeman Parks, Recreation, Trails and Open Space (PROST) Plan (2007): Recommendation 10.7.3 – Continue to expand the trail system in the City in a logical, convenient and safe manner as opportunities arise. The proposed project continues to expand the existing trail system logically, conveniently and safely. An opportunity now exists to develop excellent new trail networks and “catch up” with rapid development. Much of the expansion within this project simply involves connecting existing trail sections required by PROST into longer, logical networks. The project will also create connections to recently annexed areas of the City, and in the adjoining County. It is important to note that the PROST plan specifically recommends GVLT as the “critical partner” in expanding the trail system; we take great pride in assisting the City in this regard. Recommendation 10.8.1 – Provide a high level of accessibility and safe routes of travel to and from City parks, and between other community facilities, public library, schools, and downtown. In addition to previously stated connections with parks and schools, the Bozeman Public Library will be opening a public facility at the new Gallatin High School, to which this project can help provide bicycle and pedestrian access. This proposed project will improve non-vehicle connections to community and commercial zones along 19th Ave, Midtown, Gallatin County Fairgrounds, the Cannery District, and the newly expanding commercial areas to the west and southwest. The project will serve as an economic boost to these areas and the Midtown Urban Renewal District has indicated strong support for wayfinding within its boundaries. Recommendation 10.8.4 – Include standardized signage on City trails to increase visibility, usability and safety. While GVLT and the City of Bozeman have established a well-recognized and standardized trail signage program, it has not kept up as the City expanded. The proposed project will extend signage into newly served areas with consistent appearance and content. Signage will be expanded to include reference to new trail networks, utilize color-coding to assist trail users, incorporate “pedestrian-level” wayfinding signs and maps at intermediate locations where the large wooden totems might not be appropriate. West Side Pathways and Trails Connection Project Page 11 GVLT staffs are prepared to lead this design effort with a contracted design consultant. Design, printing and installation of these signs will be funded through both the TOP and State Trails and Recreational Facilities Account and Grant Program grants. Bozeman Community Plan 2019 Draft: Goal DCD-1: Ensure multimodal connectivity within the City. DCD-1.1 Expand multimodal accessibility between districts and throughout the City as a means of promoting personal and environmental health, as well as reducing automobile dependency. DCD-1.2 Identify missing links in the multimodal system, prioritize those most beneficial to complete, and pursue funding for completion of those links. DCD-1.3 Identify major existing and future destinations for biking and walking to aid in prioritization of route planning and completion. DCD-1.4 Support implementation of the Bozeman Trans Bozeman Strategic Plan (2018): 3.4 Active Recreation – “Facilitate and promote recreational opportunities and active health programs and facilities. Active health in communities has been shown to be enhanced by a good path and trail network. By connecting short sections into longer trails the opportunity for significant recreation is enhanced. 4.5 Housing and Transportation Choices – “Vigorously encourage, through a wide variety of actions, the development of sustainable and lasting housing options for underserved individuals and families and improve mobility options that accommodate all travel modes.” This project will improve travel by bicycle, wheelchair, and foot. The project will also provide access to Streamline public transit stops to further improve variety of travel modes. 4.5 a) Enhance non-motorized transportation – Along with safety, this is the primary objective of this project, and aligns with this objective of the Strategic Plan. 6.5 Parks, Trails & Open Space – “Support the maintenance and expansion of an interconnected system of parks, trails and open spaces.” This project is vital to improving the City’s accomplishments in this aspect. Bozeman Transportation Master Plan (2017): GOAL 6: Protect and Enhance Environmental Sustainability, Provide Opportunities for Active Lifestyles, and Conserve Natural and Cultural Resources. 6.1. Promote transportation projects, plans and/or programs that encourage reducing fuel consumption, reducing vehicle miles of travel, and thereby minimizing air pollution. West Side Pathways and Trails Connection Project Page 12 6.2. Coordinate transportation planning activities with appropriate federal, state, and local agencies responsible for land use management, natural resources, environmental protection, conservation, and historic preservation. 6.3. Engage stakeholders and the public in the decision-making stage of the transportation planning process. 6.4. Coordinate transportation planning activities with local and regional land use planning activities, including the City’s Community Plan and Gallatin County’s Growth Policy (and subsequent updates to both). Additionally, this project builds on the success described in Section 2.3.2.of the Plan: Active Transportation Network and aligns with the elements of such a network. Bozeman Community Plan (2009): “Transportation systems should support the desired land use pattern and be interconnected multi-modal networks (e.g. bicycles, pedestrian, transit, automobiles or other vehicles) rather than focusing solely on automobiles.” “The City’s intent in planning for parks, recreation, open space and trails includes the following elements: • Provide recreational opportunities that are accessible and affordable to all members of the community. • Use public places to create a sense of community and foster social interaction. Strengthen relationships through shared recreation and play. • Promote an active and healthy citizenry.” Goal R-1: Provide for accessible, desirable, and adequately maintained public parks, open spaces, trail systems, and recreational facilities for residents of the community. Objective T-2.1: For the purposes of transportation and land use planning and development, non-motorized travel options and networks shall be of equal importance and consideration as motorized travel options. This balance shall ensure that a variety of travel opportunities are available which do not require the use of automobiles for local trips. Gallatin County Trails Report and Plan (2001): 3.12 Mobility and Circulation, Goal 1 Provide a Safe and Efficient Transportation System. Promote multi-modal transportation opportunities. Encourage development to be consistent with countywide trails plan. West Side Pathways and Trails Connection Project Page 13 Section 5 List all groups/organizations involved or contributing to this project and what their short and long term commitments would be. Gallatin Valley Land Trust has well established experience and excellent success in bringing a wide range of groups together to assist with projects such as this. We will continue to be a vital partner to the Bozeman Recreation & Parks Department and continue this effective relationship as this project moves forward. • Bozeman Area Bicycle Advisory Board – Input to City Transportation on bicycle & pedestrian improvements for project area on ongoing basis. • Bozeman Area Pedestrian and Traffic Safety Committee - Input to City Transportation on bicycle & pedestrian improvements for project area on ongoing basis. • Bozeman Northeast Urban Renewal Board – Financial support for completing connectivity of Front Street Connector project to Story Mill Spur and Depot Park trails. • Bozeman Recreation and Parks Advisory Board – Input to Parks & Recreation Department staff, prioritization of project components, input on subdivision matters. • Bozeman School District – Financial assistance for eligible project components on their property and connecting to the Bozeman Sports Park. Possible assistance with wayfinding. • Bozeman Youth Cycling – Volunteer assistance, trail etiquette outreach. • Bridger Ski Foundation – Trail advocacy, volunteer assistance during GVLT-led volunteer projects. • Cannery Development – Assistance with wayfinding funding. • Collin’s Coalition – Possible financial assistance with safety improvement projects, expert safety related advice. • Gallatin Valley Bicycle Club - Volunteer support during GVLT-led volunteer projects. Trail advice. • Midtown Urban Renewal District – Assistance with wayfinding and funding partner. • Molly Stratton Design – Will lead design work on wayfinding signs and maps. • MSU Architectural Program – Ongoing user surveys, design input, coordinating neighborhood planning sessions (“charrettes”), data collection. • Rails to Trail Conservancy – Planning and funding for Great American Rail Trail development. • Run Dog Run – Financial assistance in wayfinding to dog parks in or near the corridor. • Southwest Montana Mountain Bikers Association – Volunteer support during GVLT-led volunteer projects. Trail advice. • Trust for Public Land – Coordination and assistance in improving trail connectivity near Story Mill Community Park. • Several homeowners associations may be engaged in the project to improve trails on their property. West Side Pathways and Trails Connection Project Page 14 Section 6 Anticipated maintenance requirements for the project and who will be responsible. One of the most positive aspects of this project is that the maintenance needs will be low, and within established service areas for those involved. A great deal of the path and trails to be brought into network already exist and are covered by maintenance directives or protocols. There will be little change to existing maintenance needs directly from this project. Trails within HOAs are to be maintained by the HOAs until creation of a City of Bozeman Parks and Trails Special District and that aspect will be coordinated by the City Recreation & Parks Department. Wayfinding signage has a long service life and requires little annual maintenance. GVLT has a demonstrated success record of working with the City to update, repair, and add trail signage; this cooperation will continue. A Memorandum of Agreement would be recommended to better clarify roles and responsibilities if this project is funded. The trails and signage would be inventoried and included in the Parks & Trails Special District as proposed. Funding will be generated by the Special District to maintain the trails, signage and infrastructure within established designations. GVLT will continue its long-standing partnership with the Recreation and Parks to conduct volunteer trail projects on City lands as well as working cooperatively with home owners associations. GVLT volunteer repairing a trail bridge West Side Pathways and Trails Connection Project Page 15 Section 7 Mitigation needs on any part of the proposed network? The network is being designed to limit needs for trail easements by utilizing existing public paths and trails and remaining within City rights-of-ways along streets. Little environmental permitting is anticipated unless a bridge is to be replaced. Permitting those projects are part of the City’s standard due diligence and the City would undertake the process as needed. No new bridges are being proposed within this project, but could be considered if the City deems it necessary. City staff may need to coordinate with several HOAs in efforts to re-establish or enhance trails that are the HOA’s responsibility to maintain. This coordination could be phased, or coordinated with the Parks & Trails Special District implementation. Alternate routes could be established to detour around these areas until the trails are brought up to City standards. Pleasant evening on a west side trail West Side Pathways and Trails Connection Project Page 16 Summary of Project Goals Goals • Improve Public Safety o Directs path and trail users to safer crossings, established bike lanes, existing trails. o Identifies off-street path and trail routes to move people off streets in many areas. o The majority of paths and trails segments had been identified in PROST and transportation plans as important linkages. Important to now connect them into routes and networks. • Enhance Connectivity o Connects rapidly expanding west neighborhoods with eastern and central parts of Bozeman. o Links commercial/residential in fast-growing areas. o Connects destinations: Gallatin High School, Sports Park, Regional Park, Midtown, Fairgrounds, Story Mill Park, Path to the M and Drinking Horse, downtown, Cannery District, N 7th, N 19th. o Connects with existing and expanding path and trail networks throughout the core and central areas of Bozeman. o Offers opportunities to extend trail systems west in the “Triangle” and toward Belgrade/Manhattan. Provides focus for future community planning efforts. o Provides national level trail connectivity through the planned Great American Rail Trail. • Synergy and Opportunity o Integrates with newly built parks, the new high school, and growing neighborhoods. o Creates safe and convenient connection within and among neighborhoods and services. o Montana State University’s School of Architecture Program is actively surveying northwest Bozeman residents about their trail usage and needs. This data is to be integrated into this project. o Corresponds in many areas with existing and future Streamline routes. • Accessibility and variety o Paved pathways provide excellent accessibility opportunities, utilizing recently built accessibility infrastructure on newer streets. o Connects to gravel paths and natural surface trails for variation of experience. o Provides trail access to more-affordable housing developments. • Leverage and sound investment o Uses existing paths and trails already in place. o Uses existing on-street bike lanes already in place. o Focus of the project is in areas currently serviced and maintained by City departments. Keeps maintenance requirements low by using durable materials. West Side Pathways and Trails Connection Project Page 17 Proposed Connection Project Budget Project Component Item Detail Funding TOP Proposal GVLT* CIP/ CILP Signage Map Kiosk (structure and map) GVLT to lead map design Standard kiosk and maps Quant: 8 $18,000 $2,000 Trail Totems GVLT to lead sign design & layout. Totem construction and installation by contractor. Standard totems and signage on multiple sides as needed. Quant: 20 $26,000 $5,000 Wayfinding signs and maps. GVLT to lead design, content and layout. Installation by contractor or City. Signs and maps on metal backers, steel posts Quant: 154 signs (77 locations, 2 signs per location), 22 maps $51,500 $20,000 New gravel path construction Path excavation and gravel placement by contractor. City lands only. GVLT-led volunteer projects possible. Estimated 2,500 lineal ft x 6 ft at $11/lin. ft $27,500 $5,000 Existing gravel trail re-establishment or improvement Gravel donation by Trident Cement Plant for volunteer projects. Does not include hauling. Some portions by contractor. Estimated 4,000 lineal ft x 3- 6’ width, 3” top dressing $12,000 $12,000 Trail counters Eco-Counter for Path to M. Mobile counters for west side trails To monitor trail usage and identify needs for additional trails. $15,000 $1,000 Street, curb, crossing improvements. CILP allowed expenditures Improvement projects determined by City with input from advisory boards. Rec & Parks CILP To be determined by City staff with input from advisory boards. Intent as stated by City staff is 1:1 match of TOP funding. $150,000 Total $150,000 $45,000 $150,000 Project Proportion 44% 56% *GVLT sources include in-kind, State Trails and Recreational Facilities Account and Grant Program, material donations, signage sponsorships, and neighborhood support. TOP funding will not be used on the County Regional Park; other funding sources will be used. West Side Pathways and Trails Connection Project Page 18 East-West Trail Connection Wayfinding Signage Concepts Trail Wayfinding Sign Concept Note: Trail Name(s), Destinations, Final Design to be developed with City Staff Location: Exiting Lakes at Valley West subdivision on trail at Durston Road. Looking northeast toward new high school and Sports Park West Side Pathways and Trails Connection Project Page 19 Color-coding of Trail Networks Example with Orange Banner Color Coded Sign Option with Icon to Further Identify Trail Networks West Side Pathways and Trails Connection Project Page 20 Sample new Intermediary Wayfinding Maps “You are Here” maps located at trail intersections to supplement larger map kiosks Metal post and sign option Map panel on trail totem option Map Panel